If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0415072302000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.55498,"lon":-114.893061,"icon":""}]} |
Location: 00/02-23-041-07W5/0 | |
Location Alias: 00/02-23-41-07 W5M | |
Location Alias 2: 00/02-23-041-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 5 | |
Range: 07 | |
Section: 23 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA HZ WILLGR 2-23-41-7 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0489488 | |
License Date: 2018-06-06 | |
License Status: Issued | |
Spud Date: 2018-07-09 | |
Final Drill Date: 2018-07-16 | |
Well Total Depth: 3705.00 m | |
Surface Hole Latitude: 52.554980 | |
Surface Hole Longitude: -114.893061 |
Date | Event |
---|---|
2018-06-06 | Obtained License |
2018-07-10 | Surface Casing Operation Performed |
2018-07-12 | Direction Drilling Operation Performed - Deviate |
2018-07-13 | Direction Drilling Operation Performed - Horizontal |
2018-07-16 | Finished Drilling |
2018-07-16 | Well Log Performed |
2018-07-16 | Well Mode changed to Drilled and Cased |
2018-07-17 | Production Casing Operation Performed |
2018-07-17 | Rig Released |
2018-08-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-08-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-08-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-08-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-09-01 | Well Began Production |
2018-09-01 | Well Fluid changed to Crude Oil |
2018-09-01 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-07-09 | Trinidad Drilling Ltd. | 42 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-07-12 | 1642.60 | Deviate (5 - 79 degrees) |
2018-07-13 | 2233.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-08-12 | Multi-Stage Fracture | 3658.50 | 3658.60 | 0 |
2018-08-13 | Multi-Stage Fracture | 3491.40 | 3491.50 | 0 |
2018-08-13 | Multi-Stage Fracture | 3472.80 | 3472.90 | 0 |
2018-08-13 | Multi-Stage Fracture | 3454.30 | 3454.40 | 0 |
2018-08-13 | Multi-Stage Fracture | 3436.40 | 3436.50 | 0 |
2018-08-13 | Multi-Stage Fracture | 3417.90 | 3418.00 | 0 |
2018-08-13 | Multi-Stage Fracture | 3399.30 | 3399.40 | 0 |
2018-08-13 | Multi-Stage Fracture | 3381.00 | 3381.10 | 0 |
2018-08-13 | Multi-Stage Fracture | 3362.40 | 3362.50 | 0 |
2018-08-13 | Multi-Stage Fracture | 3343.80 | 3343.90 | 0 |
2018-08-13 | Multi-Stage Fracture | 3325.20 | 3325.30 | 0 |
2018-08-13 | Multi-Stage Fracture | 3640.00 | 3640.10 | 0 |
2018-08-13 | Multi-Stage Fracture | 3306.60 | 3306.70 | 0 |
2018-08-13 | Multi-Stage Fracture | 3288.30 | 3288.40 | 0 |
2018-08-13 | Multi-Stage Fracture | 3269.90 | 3270.00 | 0 |
2018-08-13 | Multi-Stage Fracture | 3251.50 | 3251.60 | 0 |
2018-08-13 | Multi-Stage Fracture | 3232.90 | 3233.00 | 0 |
2018-08-13 | Multi-Stage Fracture | 3214.30 | 3214.40 | 0 |
2018-08-13 | Multi-Stage Fracture | 3195.70 | 3195.80 | 0 |
2018-08-13 | Multi-Stage Fracture | 3177.20 | 3177.30 | 0 |
2018-08-13 | Multi-Stage Fracture | 3158.70 | 3158.80 | 0 |
2018-08-13 | Multi-Stage Fracture | 3140.20 | 3140.30 | 0 |
2018-08-13 | Multi-Stage Fracture | 3621.40 | 3621.50 | 0 |
2018-08-13 | Multi-Stage Fracture | 3121.60 | 3121.70 | 0 |
2018-08-13 | Multi-Stage Fracture | 3103.00 | 3103.10 | 0 |
2018-08-13 | Multi-Stage Fracture | 3084.60 | 3084.70 | 0 |
2018-08-13 | Multi-Stage Fracture | 3066.00 | 3066.10 | 0 |
2018-08-13 | Multi-Stage Fracture | 3047.50 | 3047.60 | 0 |
2018-08-13 | Multi-Stage Fracture | 3028.90 | 3029.00 | 0 |
2018-08-13 | Multi-Stage Fracture | 3010.40 | 3010.50 | 0 |
2018-08-13 | Multi-Stage Fracture | 2991.80 | 2991.90 | 0 |
2018-08-13 | Multi-Stage Fracture | 2974.60 | 2974.70 | 0 |
2018-08-13 | Multi-Stage Fracture | 2956.10 | 2956.20 | 0 |
2018-08-13 | Multi-Stage Fracture | 3602.80 | 3602.90 | 0 |
2018-08-13 | Multi-Stage Fracture | 2937.50 | 2937.60 | 0 |
2018-08-14 | Multi-Stage Fracture | 2918.90 | 2919.00 | 0 |
2018-08-14 | Multi-Stage Fracture | 2900.40 | 2900.50 | 0 |
2018-08-14 | Multi-Stage Fracture | 2881.80 | 2881.90 | 0 |
2018-08-14 | Multi-Stage Fracture | 2863.50 | 2863.60 | 0 |
2018-08-14 | Multi-Stage Fracture | 2844.90 | 2845.00 | 0 |
2018-08-14 | Multi-Stage Fracture | 2827.90 | 2828.00 | 0 |
2018-08-14 | Multi-Stage Fracture | 2810.10 | 2810.20 | 0 |
2018-08-14 | Multi-Stage Fracture | 2791.50 | 2791.60 | 0 |
2018-08-14 | Multi-Stage Fracture | 2773.60 | 2773.70 | 0 |
2018-08-13 | Multi-Stage Fracture | 3584.30 | 3584.40 | 0 |
2018-08-14 | Multi-Stage Fracture | 2755.00 | 2755.10 | 0 |
2018-08-14 | Multi-Stage Fracture | 2736.50 | 2736.60 | 0 |
2018-08-14 | Multi-Stage Fracture | 2718.00 | 2718.10 | 0 |
2018-08-14 | Multi-Stage Fracture | 2700.50 | 2700.60 | 0 |
2018-08-14 | Multi-Stage Fracture | 2683.00 | 2683.10 | 0 |
2018-08-14 | Multi-Stage Fracture | 2665.40 | 2665.50 | 0 |
2018-08-14 | Multi-Stage Fracture | 2646.80 | 2646.90 | 0 |
2018-08-14 | Multi-Stage Fracture | 2628.30 | 2628.40 | 0 |
2018-08-14 | Multi-Stage Fracture | 2609.70 | 2609.80 | 0 |
2018-08-14 | Multi-Stage Fracture | 2591.20 | 2591.30 | 0 |
2018-08-13 | Multi-Stage Fracture | 3565.70 | 3565.80 | 0 |
2018-08-14 | Multi-Stage Fracture | 2574.00 | 2574.10 | 0 |
2018-08-14 | Multi-Stage Fracture | 2555.50 | 2555.60 | 0 |
2018-08-14 | Multi-Stage Fracture | 2537.30 | 2537.40 | 0 |
2018-08-14 | Multi-Stage Fracture | 2518.20 | 2518.30 | 0 |
2018-08-14 | Multi-Stage Fracture | 2500.10 | 2500.20 | 0 |
2018-08-14 | Multi-Stage Fracture | 2481.50 | 2481.60 | 0 |
2018-08-14 | Multi-Stage Fracture | 2462.90 | 2463.00 | 0 |
2018-08-14 | Multi-Stage Fracture | 2444.40 | 2444.50 | 0 |
2018-08-14 | Multi-Stage Fracture | 2425.90 | 2426.00 | 0 |
2018-08-15 | Multi-Stage Fracture | 2407.40 | 2407.50 | 0 |
2018-08-13 | Multi-Stage Fracture | 3547.10 | 3547.20 | 0 |
2018-08-15 | Multi-Stage Fracture | 2389.20 | 2389.30 | 0 |
2018-08-15 | Multi-Stage Fracture | 2370.70 | 2370.80 | 0 |
2018-08-15 | Multi-Stage Fracture | 2352.10 | 2352.20 | 0 |
2018-08-15 | Multi-Stage Fracture | 2333.40 | 2333.50 | 0 |
2018-08-15 | Multi-Stage Fracture | 2315.50 | 2315.60 | 0 |
2018-08-15 | Multi-Stage Fracture | 2297.70 | 2297.80 | 0 |
2018-08-15 | Multi-Stage Fracture | 2279.60 | 2279.70 | 0 |
2018-08-15 | Multi-Stage Fracture | 2261.10 | 2261.20 | 0 |
2018-08-13 | Multi-Stage Fracture | 3528.60 | 3528.70 | 0 |
2018-08-13 | Multi-Stage Fracture | 3509.90 | 3510.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-08-12 | 2018-08-15 | 2,023 | 8,464 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 83.5078 | N/A | |||
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 11.3107 | N/A | ||
FRAC SAND. 30/50 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 4.9665 | N/A | ||
X-CIDE 450 | BJ Services | Bactericide/Biocide | Glutaraldehyde | 111-30-8 | 100 | 0.0106 | N/A | |
Methanol | 67-56-1 | 100 | 0.0106 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0106 | N/A | ||||
CC-2 | BJ Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.0566 | N/A | |
Non-hazardous | Not Available | 100 | 0.0566 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0566 | N/A | ||||
D-3 | BJ Services | Demulsifier | Ethoxylated alcohol. branched | 78330-19-5 | 100 | 0.0501 | N/A | |
Isopropanol | 67-63-0 | 100 | 0.0501 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0501 | N/A | ||||
ThinFrac MP | BJ Services | Friction Reducer | Anionic terpolymer | 12054 | 100 | 0.114 | N/A | |
Oxyalkylated alcohol | 12054 | 100 | 0.114 | N/A | ||||
Petroleum distillates | 64742-47-8 | 100 | 0.114 | N/A | ||||
Sodium chloride | 7647-14-5 | 100 | 0.114 | N/A | ||||
Water | 7732-18-5 | 100 | 0.114 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-08-12 | 2018-08-15 | Surface Water - River | 8237 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 2812 | 0.0 | 0.0 | 0.0 |
2019 | 7437 | 0.0 | 0.0 | 0.0 |
2020 | 2019 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-07-17 | No Incident Encountered | 0.00 | 0.00 |
2018-08-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]