If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0415072302030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.554981,"lon":-114.893503,"icon":""}]} |
Location: 03/02-23-041-07W5/0 | |
Location Alias: 03/02-23-41-07 W5M | |
Location Alias 2: 03/02-23-041-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 5 | |
Range: 07 | |
Section: 23 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA HZ 103 WILLGR 2-23-41-7 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0489490 | |
License Date: 2018-06-06 | |
License Status: Issued | |
Spud Date: 2018-07-28 | |
Final Drill Date: 2018-08-05 | |
Well Total Depth: 3804.00 m | |
Surface Hole Latitude: 52.554981 | |
Surface Hole Longitude: -114.893503 |
Date | Event |
---|---|
2018-06-06 | Obtained License |
2018-07-29 | Surface Casing Operation Performed |
2018-08-01 | Direction Drilling Operation Performed - Deviate |
2018-08-02 | Direction Drilling Operation Performed - Horizontal |
2018-08-05 | Finished Drilling |
2018-08-05 | Well Log Performed |
2018-08-05 | Well Mode changed to Drilled and Cased |
2018-08-06 | Production Casing Operation Performed |
2018-08-07 | Rig Released |
2018-08-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-08-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-08-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-09-01 | Well Began Production |
2018-09-01 | Well Fluid changed to Crude Oil |
2018-09-01 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-07-28 | Trinidad Drilling Ltd. | 42 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-08-01 | 1569.30 | Deviate (5 - 79 degrees) |
2018-08-02 | 2315.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-08-17 | Multi-Stage Fracture | 3754.50 | 3754.60 | 0 |
2018-08-18 | Multi-Stage Fracture | 3588.60 | 3588.70 | 0 |
2018-08-18 | Multi-Stage Fracture | 3569.90 | 3570.00 | 0 |
2018-08-18 | Multi-Stage Fracture | 3551.60 | 3551.70 | 0 |
2018-08-18 | Multi-Stage Fracture | 3533.20 | 3533.30 | 0 |
2018-08-18 | Multi-Stage Fracture | 3514.60 | 3514.70 | 0 |
2018-08-18 | Multi-Stage Fracture | 3496.10 | 3496.20 | 0 |
2018-08-18 | Multi-Stage Fracture | 3477.50 | 3477.60 | 0 |
2018-08-18 | Multi-Stage Fracture | 3458.90 | 3459.00 | 0 |
2018-08-18 | Multi-Stage Fracture | 3440.40 | 3440.50 | 0 |
2018-08-18 | Multi-Stage Fracture | 3421.80 | 3421.90 | 0 |
2018-08-17 | Multi-Stage Fracture | 3735.90 | 3736.00 | 0 |
2018-08-18 | Multi-Stage Fracture | 3403.20 | 3403.30 | 0 |
2018-08-18 | Multi-Stage Fracture | 3384.60 | 3384.70 | 0 |
2018-08-18 | Multi-Stage Fracture | 3366.10 | 3366.20 | 0 |
2018-08-18 | Multi-Stage Fracture | 3347.50 | 3347.60 | 0 |
2018-08-18 | Multi-Stage Fracture | 3328.80 | 3328.90 | 0 |
2018-08-18 | Multi-Stage Fracture | 3310.30 | 3310.40 | 0 |
2018-08-18 | Multi-Stage Fracture | 3291.70 | 3291.80 | 0 |
2018-08-18 | Multi-Stage Fracture | 3273.10 | 3273.20 | 0 |
2018-08-18 | Multi-Stage Fracture | 3254.50 | 3254.60 | 0 |
2018-08-18 | Multi-Stage Fracture | 3236.00 | 3236.10 | 0 |
2018-08-17 | Multi-Stage Fracture | 3717.30 | 3717.40 | 0 |
2018-08-18 | Multi-Stage Fracture | 3217.30 | 3217.40 | 0 |
2018-08-18 | Multi-Stage Fracture | 3199.10 | 3199.20 | 0 |
2018-08-18 | Multi-Stage Fracture | 3180.50 | 3180.60 | 0 |
2018-08-18 | Multi-Stage Fracture | 3162.00 | 3162.10 | 0 |
2018-08-18 | Multi-Stage Fracture | 3143.40 | 3143.50 | 0 |
2018-08-18 | Multi-Stage Fracture | 3124.80 | 3124.90 | 0 |
2018-08-18 | Multi-Stage Fracture | 3106.20 | 3106.30 | 0 |
2018-08-18 | Multi-Stage Fracture | 3087.60 | 3087.70 | 0 |
2018-08-18 | Multi-Stage Fracture | 3069.00 | 3069.10 | 0 |
2018-08-18 | Multi-Stage Fracture | 3050.50 | 3050.60 | 0 |
2018-08-17 | Multi-Stage Fracture | 3698.70 | 3698.80 | 0 |
2018-08-18 | Multi-Stage Fracture | 3032.70 | 3032.80 | 0 |
2018-08-18 | Multi-Stage Fracture | 3014.10 | 3014.20 | 0 |
2018-08-18 | Multi-Stage Fracture | 2995.60 | 2995.70 | 0 |
2018-08-18 | Multi-Stage Fracture | 2977.00 | 2977.10 | 0 |
2018-08-18 | Multi-Stage Fracture | 2958.40 | 2958.50 | 0 |
2018-08-18 | Multi-Stage Fracture | 2939.90 | 2940.00 | 0 |
2018-08-18 | Multi-Stage Fracture | 2921.30 | 2921.40 | 0 |
2018-08-18 | Multi-Stage Fracture | 2902.70 | 2902.80 | 0 |
2018-08-18 | Multi-Stage Fracture | 2884.10 | 2884.20 | 0 |
2018-08-18 | Multi-Stage Fracture | 2866.10 | 2866.20 | 0 |
2018-08-17 | Multi-Stage Fracture | 3680.30 | 3680.40 | 0 |
2018-08-18 | Multi-Stage Fracture | 2847.60 | 2847.70 | 0 |
2018-08-18 | Multi-Stage Fracture | 2829.00 | 2829.10 | 0 |
2018-08-18 | Multi-Stage Fracture | 2810.50 | 2810.60 | 0 |
2018-08-18 | Multi-Stage Fracture | 2791.90 | 2792.00 | 0 |
2018-08-19 | Multi-Stage Fracture | 2773.40 | 2773.50 | 0 |
2018-08-19 | Multi-Stage Fracture | 2754.80 | 2754.90 | 0 |
2018-08-19 | Multi-Stage Fracture | 2736.60 | 2736.70 | 0 |
2018-08-19 | Multi-Stage Fracture | 2718.00 | 2718.10 | 0 |
2018-08-19 | Multi-Stage Fracture | 2699.40 | 2699.50 | 0 |
2018-08-19 | Multi-Stage Fracture | 2681.30 | 2681.40 | 0 |
2018-08-17 | Multi-Stage Fracture | 3662.20 | 3662.30 | 0 |
2018-08-19 | Multi-Stage Fracture | 2663.10 | 2663.20 | 0 |
2018-08-19 | Multi-Stage Fracture | 2644.70 | 2644.80 | 0 |
2018-08-19 | Multi-Stage Fracture | 2626.10 | 2626.20 | 0 |
2018-08-19 | Multi-Stage Fracture | 2608.10 | 2608.20 | 0 |
2018-08-19 | Multi-Stage Fracture | 2589.60 | 2589.70 | 0 |
2018-08-19 | Multi-Stage Fracture | 2571.00 | 2571.10 | 0 |
2018-08-19 | Multi-Stage Fracture | 2553.20 | 2553.30 | 0 |
2018-08-19 | Multi-Stage Fracture | 2534.60 | 2534.70 | 0 |
2018-08-19 | Multi-Stage Fracture | 2516.40 | 2516.50 | 0 |
2018-08-19 | Multi-Stage Fracture | 2497.80 | 2497.90 | 0 |
2018-08-17 | Multi-Stage Fracture | 3643.60 | 3643.70 | 0 |
2018-08-19 | Multi-Stage Fracture | 2479.90 | 2480.00 | 0 |
2018-08-19 | Multi-Stage Fracture | 2461.30 | 2461.40 | 0 |
2018-08-19 | Multi-Stage Fracture | 2442.80 | 2442.90 | 0 |
2018-08-19 | Multi-Stage Fracture | 2424.20 | 2424.30 | 0 |
2018-08-19 | Multi-Stage Fracture | 2405.60 | 2405.70 | 0 |
2018-08-19 | Multi-Stage Fracture | 2387.10 | 2387.20 | 0 |
2018-08-19 | Multi-Stage Fracture | 2368.50 | 2368.60 | 0 |
2018-08-19 | Multi-Stage Fracture | 2351.80 | 2351.90 | 0 |
2018-08-17 | Multi-Stage Fracture | 3625.10 | 3625.20 | 0 |
2018-08-17 | Multi-Stage Fracture | 3607.20 | 3607.30 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-08-17 | 2018-08-19 | 2,025 | 8,209 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 83.5033 | N/A | |||
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 4.1308 | N/A | ||
FRAC SAND. 30/50 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 12.2414 | N/A | ||
X-CIDE 450 | BJ Services | Bactericide/Biocide | Glutaraldehyde | 111-30-8 | 100 | 0.0218 | N/A | |
Methanol | 67-56-1 | 100 | 0.0218 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0218 | N/A | ||||
CC-2 | BJ Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.0625 | N/A | |
Non-hazardous | Not Available | 100 | 0.0625 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0625 | N/A | ||||
D-3 | BJ Services | Demulsifier | Ethoxylated alcohol. branched | 78330-19-5 | 100 | 0.0597 | N/A | |
Isopropanol | 67-63-0 | 100 | 0.0597 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0597 | N/A | ||||
ThinFrac MP | BJ Services | Friction Reducer | Anionic terpolymer | 12054 | 100 | 0.1111 | N/A | |
Oxyalkylated alcohol | 12054 | 100 | 0.1111 | N/A | ||||
Petroleum distillates | 64742-47-8 | 100 | 0.1111 | N/A | ||||
Sodium chloride | 7647-14-5 | 100 | 0.1111 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1111 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-08-17 | 2018-08-18 | Surface Water - River | 5321 |
2018-08-17 | 2018-08-18 | Oilfield Produced Water | 421 |
2018-08-17 | 2018-08-18 | Oilfield Produced Water | 306 |
2018-08-17 | 2018-08-18 | Oilfield Produced Water | 121 |
2018-08-17 | 2018-08-18 | Oilfield Produced Water | 2735 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 2839 | 0.0 | 0.0 | 0.0 |
2019 | 7494 | 0.0 | 0.0 | 0.0 |
2020 | 1585 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-08-07 | No Incident Encountered | 0.00 | 0.00 |
2018-08-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]