X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424023001040

Well Details

Well ID: 0424023001040
Loading map...
Location: 04/01-30-042-02W4/0
Location Alias: 04/01-30-42-02 W4M
Location Alias 2: 04/01-30-042-02 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 02
Section: 30
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN 1D CHAUVS 1-30-42-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0203126
License Date: 1997-07-03
License Status: Issued
Spud Date: 1997-07-19
Final Drill Date: 1997-07-21
Well Total Depth: 671.00 m
Surface Hole Latitude: 52.640195
Surface Hole Longitude: -110.272647

For data sources see[1][2]

Well History

Date Event
1997-07-03 Obtained License
1997-07-19 Surface Casing Operation Performed
1997-07-20 Direction Drilling Operation Performed - Deviate
1997-07-21 Finished Drilling
1997-07-21 Production Casing Operation Performed
1997-07-21 Well Log Performed
1997-07-21 Well Mode changed to Drilled and Cased
1997-07-22 Rig Released
1997-07-24 Well Log Performed
1997-07-25 Perforation Treatment Performed - Fractured
1997-07-25 Perforation Treatment Performed - Jet Perforation
1997-07-25 Well Log Performed
1997-07-31 Perforation Treatment Performed - Fractured
1997-08-22 Well Began Production
1997-08-22 Well Fluid changed to Crude Oil
1997-08-22 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-07-20 162.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-07-25 Perforation 632.30 634.30 13
1997-07-25 Perforation 632.30 634.30 13
1997-07-25 Fracture 632.30 634.30 0
1997-07-31 Fracture 632.30 656.20 0
1997-07-31 Fracture 654.20 656.20 0
1997-07-31 Fracture 650.90 652.90 0
1997-07-31 Fracture 649.00 650.00 0
1997-07-31 Fracture 637.20 641.20 0
1997-07-25 Perforation 637.20 641.20 13
1997-07-25 Perforation 649.00 650.00 13
1997-07-25 Perforation 650.90 652.90 13
1997-07-25 Perforation 654.20 656.20 13
1997-07-25 Perforation 654.20 656.20 13
1997-07-25 Perforation 650.90 652.90 13
1997-07-25 Perforation 649.00 650.00 13
1997-07-25 Perforation 637.20 641.20 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 3149 0.0 0.0 0.0
1998 8757 0.0 0.0 0.0
1999 8729 0.0 0.0 0.0
2000 8526 0.0 0.0 0.0
2001 8729 0.0 0.0 0.0
2002 8739 0.0 0.0 0.0
2003 8735 0.0 0.0 0.0
2004 8580 0.0 0.0 0.0
2005 8166 0.0 0.0 0.0
2006 8572 0.0 0.0 0.0
2007 8614 0.0 0.0 0.0
2008 8768 0.0 0.0 0.0
2009 8668 0.0 0.0 0.0
2010 8684 0.0 0.0 0.0
2011 8741 0.0 0.0 0.0
2012 8751 0.0 0.0 0.0
2013 8669 0.0 0.0 0.0
2014 8658 0.0 0.0 0.0
2015 8698 0.0 0.0 0.0
2016 8453 0.0 0.0 0.0
2017 8589 0.0 0.0 0.0
2018 8597 0.0 0.0 0.0
2019 8674 0.0 0.0 0.0
2020 1908 0.0 0.0 0.0

For data sources see[6]

References