X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424023103000

Well Details

Well ID: 0424023103000
Loading map...
Location: 00/03-31-042-02W4/0
Location Alias: 00/03-31-42-02 W4M
Location Alias 2: 00/03-31-042-02 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 02
Section: 31
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN 3B CHAUVS 3-31-42-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0201448
License Date: 1997-05-20
License Status: Amended
Spud Date: 1997-06-28
Final Drill Date: 1997-07-01
Well Total Depth: 701.00 m
Surface Hole Latitude: 52.654759
Surface Hole Longitude: -110.289304

For data sources see[1][2]

Well History

Date Event
1997-05-20 Obtained License
1997-06-29 Direction Drilling Operation Performed - Deviate
1997-06-29 Surface Casing Operation Performed
1997-07-01 Finished Drilling
1997-07-01 Production Casing Operation Performed
1997-07-01 Rig Released
1997-07-01 Well Log Performed
1997-07-01 Well Mode changed to Drilled and Cased
1997-07-07 Well Log Performed
1997-07-12 Well Log Performed
1997-09-18 Perforation Treatment Performed - Jet Perforation
1997-09-18 Well Log Performed
1997-09-21 Perforation Treatment Performed - Fractured
1997-09-29 Perforation Treatment Performed - Jet Perforation
1997-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-01 Perforation Treatment Performed - Remedial Casing
1997-10-07 Perforation Treatment Performed - Jet Perforation
1997-10-07 Well Log Performed
1997-10-22 Well Began Production
1997-10-22 Well Fluid changed to Crude Oil
1997-10-22 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-06-29 152.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-09-18 Perforation 662.50 663.50 14
1997-09-18 Perforation 667.00 668.00 14
1997-09-18 Perforation 670.00 673.00 13
1997-09-21 Fracture 662.50 673.00 0
1997-09-29 Perforation 189.00 192.20 13
1997-09-29 Perforation 194.30 195.50 13
1997-09-30 Acid Treatment 189.00 195.50 0
1997-10-01 Remedial Casing Cementing 189.00 195.50 0
1997-10-07 Perforation 681.10 682.10 14

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 2130 0.0 0.0 0.0
1998 8733 0.0 0.0 0.0
1999 8631 0.0 0.0 0.0
2000 8624 0.0 0.0 0.0
2001 8320 0.0 0.0 0.0
2002 8489 0.0 0.0 0.0
2003 8519 0.0 0.0 0.0
2004 8452 0.0 0.0 0.0
2005 8514 0.0 0.0 0.0
2006 8364 0.0 0.0 0.0
2007 8538 0.0 0.0 0.0
2008 8504 0.0 0.0 0.0
2009 8692 0.0 0.0 0.0
2010 8459 0.0 0.0 0.0
2011 8681 0.0 0.0 0.0
2012 7282 0.0 0.0 0.0
2013 7782 0.0 0.0 0.0
2014 8742 0.0 0.0 0.0
2015 8578 0.0 0.0 0.0
2016 8345 0.0 0.0 0.0
2017 7901 0.0 0.0 0.0
2018 8621 0.0 0.0 0.0
2019 8611 0.0 0.0 0.0
2020 2154 0.0 0.0 0.0

For data sources see[6]

References