Well Details

Well ID: 0424092710000
Loading map...
Location: 00/10-27-042-09W4/0
Location Alias: 00/10-27-42-09 W4M
Location Alias 2: 00/10-27-042-09 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 09
Section: 27
County/Municipality: Municipal District of Provost No. 52
Well Name: CLEO ENERGY KILLAM 10-27-42-9
Operator Name: Cleo Energy Corp.
License Number: 0078483
License Date: 1979-10-05
License Status: Suspension
Spud Date: 1979-10-02
Final Drill Date: 1979-10-04
Well Total Depth: 875.00 m
Surface Hole Latitude: 52.647662
Surface Hole Longitude: -111.210960

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-10-04 Drill Stem Test Performed
1979-10-04 Finished Drilling
1979-10-05 Obtained License
1979-10-05 Production Casing Operation Performed
1979-10-05 Well Mode changed to Drilled and Cased
1980-07-11 Perforation Treatment Performed - Jet Perforation
1981-04-01 Well Began Production
1981-04-01 Well Fluid changed to Gas
1981-04-01 Well Mode changed to Flowing
1983-07-01 Well Fluid changed to Gas
1983-07-01 Well Mode changed to Suspended
1983-12-01 Well Fluid changed to Gas
1983-12-01 Well Mode changed to Flowing
1993-07-01 Well Fluid changed to Gas
1993-07-01 Well Mode changed to Suspended
1993-10-25 Well Fluid changed to Gas
1993-10-25 Well Mode changed to Flowing
2001-07-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-07-08 Plug Back Performed
2001-07-08 Well Fluid changed to Gas
2001-07-08 Well Mode changed to Abandoned Zone
2001-07-17 Well Log Performed
2001-07-20 Well Log Performed
2001-07-21 Perforation Treatment Performed - Jet Perforation
2001-07-22 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-07-11 Perforation 669.50 671.00 7
1980-07-11 Perforation 673.00 674.50 7
2001-07-08 Packing Device Capped w/Cement 649.20 658.00 0
2001-07-21 Perforation 222.50 223.50 20
2001-07-22 Remedial Casing Cementing 222.50 223.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 4892 0.0 0.0 0.0
1982 4643 0.0 0.0 0.0
1983 4280 0.0 0.0 0.0
1984 6232 0.0 0.0 0.0
1985 6689 0.0 0.0 0.0
1986 4358 0.0 0.0 0.0
1987 2038 0.0 0.0 0.0
1988 4318 0.0 0.0 0.0
1989 5720 0.0 0.0 0.0
1990 4740 0.0 0.0 0.0
1991 6667 0.0 0.0 0.0
1992 96 0.0 0.0 0.0
1993 2904 0.0 0.0 0.0
1994 8534 0.0 0.0 0.0
1995 6604 0.0 0.0 0.0
1996 3651 0.0 0.0 0.0
1997 2278 0.0 0.0 0.0
1998 4660 0.0 0.0 0.0
1999 2623 0.0 0.0 0.0
2000 6781 0.0 0.0 0.0
2001 3622 0.0 0.0 0.0

For data sources see[5]

References