If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424092815000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.649514,"lon":-111.234735,"icon":""}]} |
Location: 00/15-28-042-09W4/0 | |
Location Alias: 00/15-28-42-09 W4M | |
Location Alias 2: 00/15-28-042-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 09 | |
Section: 28 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: CLEO ENERGY KILLAM 15-28-42-9 | |
Operator Name: Cleo Energy Corp. | |
License Number: 0271785 | |
License Date: 2002-07-15 | |
License Status: Abandoned | |
Spud Date: 2002-08-06 | |
Final Drill Date: 2002-08-08 | |
Well Total Depth: 727.50 m | |
Surface Hole Latitude: 52.649514 | |
Surface Hole Longitude: -111.234735 |
Date | Event |
---|---|
2002-07-15 | Obtained License |
2002-08-07 | Surface Casing Operation Performed |
2002-08-08 | Finished Drilling |
2002-08-08 | Production Casing Operation Performed |
2002-08-09 | Rig Released |
2002-08-09 | Well Mode changed to Drilled and Cased |
2002-08-10 | Well Log Performed |
2002-08-21 | Perforation Treatment Performed - Jet Perforation |
2002-08-21 | Well Log Performed |
2002-11-07 | Well Began Production |
2002-11-07 | Well Fluid changed to Gas |
2002-11-07 | Well Mode changed to Flowing |
2006-03-11 | Perforation Treatment Performed - Fractured |
2008-10-01 | Well Fluid changed to Gas |
2008-10-01 | Well Mode changed to Suspended |
2017-05-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-05-12 | Plug Back Performed |
2017-05-12 | Well Fluid changed to Gas |
2017-05-12 | Well Mode changed to Abandoned Zone |
2017-06-06 | Well Abandoned |
2017-06-06 | Well Fluid changed to Gas |
2017-06-06 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-08-21 | Perforation | 686.50 | 689.50 | 17 |
2002-08-21 | Perforation | 690.00 | 692.50 | 17 |
2002-08-21 | Perforation | 694.50 | 697.50 | 17 |
2006-03-11 | Fracture | 686.50 | 697.50 | 0 |
2017-05-12 | Packing Device Capped w/Cement | 672.00 | 680.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 1381 | 0.0 | 0.0 | 0.0 |
2003 | 8759 | 0.0 | 0.0 | 0.0 |
2004 | 8665 | 0.0 | 0.0 | 0.0 |
2005 | 8756 | 0.0 | 0.0 | 0.0 |
2006 | 1888 | 0.0 | 0.0 | 0.0 |
2007 | 48 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-05-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]