X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424113301000

Well Details

Well ID: 0424113301000
Loading map...
Location: 00/01-33-042-11W4/0
Location Alias: 00/01-33-42-11 W4M
Location Alias 2: 00/01-33-042-11 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 11
Section: 33
County/Municipality: Flagstaff County
Well Name: FORGE PETE HZ KILLAM 1-33-42-11
Operator Name: Gear Energy Ltd.
License Number: 0460079
License Date: 2013-10-16
License Status: Issued
Spud Date: 2013-10-23
Final Drill Date: 2013-10-29
Well Total Depth: 2142.00 m
Surface Hole Latitude: 52.653320
Surface Hole Longitude: -111.539206

For data sources see[1][2]

Well History

Date Event
2013-10-16 Obtained License
2013-10-24 Surface Casing Operation Performed
2013-10-25 Direction Drilling Operation Performed - Deviate
2013-10-26 Direction Drilling Operation Performed - Horizontal
2013-10-26 Production Casing Operation Performed
2013-10-29 Finished Drilling
2013-10-29 Well Mode changed to Drilled and Cased
2013-10-30 Liner Casing Operation Performed
2013-10-31 Rig Released
2013-11-12 Perforation Treatment Performed - Multi-Stage Fracture
2013-11-13 Perforation Treatment Performed - Multi-Stage Fracture
2013-12-23 Well Began Production
2013-12-23 Well Fluid changed to Crude Oil
2013-12-23 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2013-10-25 635.10 Deviate (5 - 79 degrees)
2013-10-26 976.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-11-12 Multi-Stage Fracture 2125.30 2125.40 0
2013-11-13 Multi-Stage Fracture 1696.80 1696.90 0
2013-11-13 Multi-Stage Fracture 1665.50 1665.60 0
2013-11-13 Multi-Stage Fracture 1619.30 1619.40 0
2013-11-13 Multi-Stage Fracture 1588.00 1588.10 0
2013-11-13 Multi-Stage Fracture 1543.00 1543.10 0
2013-11-13 Multi-Stage Fracture 1498.10 1498.20 0
2013-11-13 Multi-Stage Fracture 1464.90 1465.00 0
2013-11-13 Multi-Stage Fracture 1420.10 1420.20 0
2013-11-13 Multi-Stage Fracture 1388.70 1388.80 0
2013-11-13 Multi-Stage Fracture 1343.30 1343.40 0
2013-11-12 Multi-Stage Fracture 2066.80 2066.90 0
2013-11-13 Multi-Stage Fracture 1298.70 1298.80 0
2013-11-13 Multi-Stage Fracture 1267.40 1267.50 0
2013-11-13 Multi-Stage Fracture 1222.50 1222.60 0
2013-11-13 Multi-Stage Fracture 1148.40 1148.50 0
2013-11-13 Multi-Stage Fracture 1103.60 1103.70 0
2013-11-13 Multi-Stage Fracture 1058.70 1058.80 0
2013-11-13 Multi-Stage Fracture 1025.40 1025.50 0
2013-11-12 Multi-Stage Fracture 2022.00 2022.10 0
2013-11-13 Multi-Stage Fracture 1945.70 1945.80 0
2013-11-13 Multi-Stage Fracture 1899.00 1899.10 0
2013-11-13 Multi-Stage Fracture 1865.70 1865.80 0
2013-11-13 Multi-Stage Fracture 1820.80 1820.90 0
2013-11-13 Multi-Stage Fracture 1787.60 1787.70 0
2013-11-13 Multi-Stage Fracture 1743.60 1743.70 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-11-12 2013-11-13 847 903 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 76.3842 N/A
Sand (20/40) Canyon Aluminum Oxide 1344-28-1 100 22.4681 N/A
Crystalline silica. quartz 14808-60-7 100 22.4681 N/A
Iron Oxide 1309-37-1 100 22.4681 N/A
Titanium Oxide 13463-67-7 100 22.4681 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0197 N/A
Water 7732-18-5 100 0.0197 N/A
CAN-2300 Breaker (Enzyme HpH. 10L:1L) Canyon Breaker Cellulase Enzyme Solution Not Available 100 0.0697 N/A
Water 7732-18-5 100 0.0697 N/A
CAN-2301 Breaker (Oxidizer) Canyon Breaker Ammonium Persulfate 7727-54-0 100 0.0845 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0845 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.198 N/A
Water 7732-18-5 100 0.198 N/A
CAN-2200 Crosslinker / pH buffer (Borate) Canyon Crosslinker Boric Acid 10043-35-3 100 0.159 N/A
Monoethanolamine 141-43-5 100 0.159 N/A
Water 7732-18-5 100 0.159 N/A
CAN-2000 Gellant (Guar) Canyon Gelling Agent Polysacharide Suspension Not Available 100 0.5327 N/A
CAN-2403 nanoFLO Canyon Surfactant Ethanol 64-17-5 100 0.0837 N/A
Methanol 67-56-1 100 0.0837 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.0837 N/A
Water 7732-18-5 100 0.0837 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-11-11 2013-11-16 Municipal Water 1037

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 196 0.0 0.0 0.0
2014 8289 0.0 0.0 0.0
2015 8584 0.0 0.0 0.0
2016 7451 0.0 0.0 0.0
2017 8656 0.0 0.0 0.0
2018 6641 0.0 0.0 0.0
2019 8696 0.0 0.0 0.0
2020 2051 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-01 No Incident Encountered 0.00 0.00
2013-11-29 No Incident Encountered 0.00 0.00

For data sources see[9]

References