If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424152512000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.646933,"lon":-112.039293,"icon":""}]} |
Location: 00/12-25-042-15W4/0 | |
Location Alias: 00/12-25-42-15 W4M | |
Location Alias 2: 00/12-25-042-15 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 15 | |
Section: 25 | |
County/Municipality: Flagstaff County | |
Well Name: SOC FORESTB 12-25-42-15 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0148593 | |
License Date: 1991-04-10 | |
License Status: Suspension | |
Spud Date: 1991-05-21 | |
Final Drill Date: 1991-05-25 | |
Well Total Depth: 1083.00 m | |
Surface Hole Latitude: 52.646933 | |
Surface Hole Longitude: -112.039293 |
Date | Event |
---|---|
1991-04-10 | Obtained License |
1991-05-22 | Surface Casing Operation Performed |
1991-05-25 | Finished Drilling |
1991-05-25 | Well Log Performed |
1991-05-25 | Well Mode changed to Drilled and Cased |
1991-05-26 | Drill Stem Test Performed |
1991-05-27 | Production Casing Operation Performed |
1991-05-27 | Rig Released |
1991-05-30 | Perforation Treatment Performed - Jet Perforation |
1991-05-31 | Perforation Treatment Performed - Cement Squeeze |
1991-05-31 | Perforation Treatment Performed - Jet Perforation |
1991-05-31 | Plug Back Performed |
1991-06-02 | Perforation Treatment Performed - Jet Perforation |
1991-06-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-06-03 | Perforation Treatment Performed - Jet Perforation |
1991-06-03 | Plug Back Performed |
1994-08-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-08-26 | Perforation Treatment Performed - Jet Perforation |
1998-05-25 | Well Began Production |
1998-05-25 | Well Fluid changed to Gas |
1998-05-25 | Well Mode changed to Flowing |
1999-07-26 | Well Fluid changed to Gas |
1999-07-26 | Well Mode changed to Suspended |
2004-07-22 | Perforation Treatment Performed - Jet Perforation |
2004-07-22 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2004-07-22 | Plug Back Performed |
2006-07-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1991-05-30 | Perforation | 1009.00 | 1011.00 | 13 |
2004-07-22 | Perforation | 974.00 | 975.00 | 17 |
2006-07-11 | Packing Device Capped w/Cement | 959.60 | 967.60 | 0 |
1991-05-31 | Perforation | 1012.50 | 1013.50 | 13 |
1991-05-31 | Cement Squeeze | 1009.00 | 1013.50 | 0 |
1991-06-02 | Perforation | 1009.00 | 1011.00 | 13 |
1991-06-03 | Packing Device Capped w/Cement | 999.00 | 1007.00 | 0 |
1991-06-03 | Perforation | 989.00 | 990.00 | 13 |
1994-08-26 | Packing Device Capped w/Cement | 987.00 | 988.00 | 0 |
1994-08-26 | Perforation | 985.00 | 986.50 | 13 |
2004-07-22 | Packing Dev Cpd w/Res-Gyp Cem | 979.50 | 982.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1991 | 24 | 0.0 | 0.0 | 0.0 |
1998 | 2476 | 0.0 | 0.0 | 0.0 |
For data sources see[5]