If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424162916005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.650266,"lon":-112.263604,"icon":""}]} |
Location: 00/16-29-042-16W4/5 | |
Location Alias: 00/16-29-42-16 W4M | |
Location Alias 2: 00/16-29-042-16 W4/05 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 16 | |
Section: 29 | |
County/Municipality: Flagstaff County | |
Well Name: SOC FORESTB 16-29-42-16 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0359534 | |
License Date: 2006-06-27 | |
License Status: Suspension | |
Spud Date: 2006-07-13 | |
Final Drill Date: 2006-07-22 | |
Well Total Depth: 1124.00 m | |
Surface Hole Latitude: 52.650266 | |
Surface Hole Longitude: -112.263604 |
Date | Event |
---|---|
2006-06-27 | Obtained License |
2006-07-14 | Surface Casing Operation Performed |
2006-07-22 | Finished Drilling |
2006-07-22 | Well Mode changed to Drilled and Cased |
2006-07-23 | Well Log Performed |
2006-07-24 | Production Casing Operation Performed |
2006-07-25 | Rig Released |
2006-08-21 | Well Log Performed |
2006-08-22 | Perforation Treatment Performed - Jet Perforation |
2006-08-22 | Well Log Performed |
2006-08-23 | Perforation Treatment Performed - Remedial Casing |
2006-08-26 | Well Log Performed |
2006-08-31 | Perforation Treatment Performed - Jet Perforation |
2006-08-31 | Well Log Performed |
2006-09-01 | Perforation Treatment Performed - Jet Perforation |
2006-09-01 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2006-09-01 | Plug Back Performed |
2006-09-06 | Perforation Treatment Performed - Jet Perforation |
2006-09-06 | Well Log Performed |
2006-09-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-09-07 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2006-09-07 | Plug Back Performed |
2006-09-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-09-08 | Perforation Treatment Performed - Jet Perforation |
2006-09-08 | Plug Back Performed |
2006-09-08 | Well Log Performed |
2006-09-09 | Perforation Treatment Performed - Jet Perforation |
2006-09-09 | Well Log Performed |
2006-10-01 | Well Fluid changed to Gas |
2006-10-01 | Well Mode changed to Testing |
2010-06-21 | Well Began Production |
2010-06-21 | Well Fluid changed to Gas |
2010-06-21 | Well Mode changed to Flowing |
2016-07-21 | Well Fluid changed to Gas |
2016-07-21 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-08-22 | Perforation | 383.00 | 384.00 | 17 |
2006-09-08 | Perforation | 1021.20 | 1022.00 | 17 |
2006-09-08 | Packing Device Capped w/Cement | 1010.00 | 1018.00 | 0 |
2006-09-09 | Perforation | 897.70 | 898.50 | 17 |
2006-08-23 | Remedial Casing Cementing | 383.00 | 384.00 | 0 |
2006-08-31 | Perforation | 1096.50 | 1098.50 | 17 |
2006-09-01 | Packing Dev Cpd w/Res-Gyp Cem | 1090.80 | 1094.00 | 0 |
2006-09-01 | Perforation | 1082.70 | 1083.70 | 17 |
2006-09-06 | Perforation | 1073.70 | 1074.20 | 17 |
2006-09-06 | Perforation | 1076.50 | 1077.00 | 17 |
2006-09-07 | Packing Dev Cpd w/Res-Gyp Cem | 1078.00 | 1081.00 | 0 |
2006-09-07 | Packing Device Capped w/Cement | 1063.00 | 1071.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 48 | 0.0 | 0.0 | 0.0 |
2010 | 2733 | 0.0 | 0.0 | 0.0 |
2011 | 3597 | 0.0 | 0.0 | 0.0 |
2012 | 3096 | 0.0 | 0.0 | 0.0 |
2014 | 5572 | 0.0 | 0.0 | 0.0 |
For data sources see[5]