If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0424200404000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.582695,"lon":-112.830374,"icon":""}]} |
| Location: 00/04-04-042-20W4/0 | |
| Location Alias: 00/04-04-42-20 W4M | |
| Location Alias 2: 00/04-04-042-20 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 042 | |
| Meridian: 4 | |
| Range: 20 | |
| Section: 04 | |
| County/Municipality: Camrose County | |
| Well Name: EMBER BASHAW 4-4-42-20 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0331332 | |
| License Date: 2005-05-19 | |
| License Status: Issued | |
| Spud Date: 2005-06-02 | |
| Final Drill Date: 2005-07-15 | |
| Well Total Depth: 385.00 m | |
| Surface Hole Latitude: 52.582695 | |
| Surface Hole Longitude: -112.830374 |
| Date | Event |
|---|---|
| 2005-05-19 | Obtained License |
| 2005-06-02 | Surface Casing Operation Performed |
| 2005-07-15 | Finished Drilling |
| 2005-07-15 | Production Casing Operation Performed |
| 2005-07-15 | Rig Released |
| 2005-07-15 | Well Mode changed to Drilled and Cased |
| 2005-07-21 | Well Log Performed |
| 2005-07-30 | Perforation Treatment Performed - Jet Perforation |
| 2005-08-02 | Perforation Treatment Performed - Fractured |
| 2005-12-11 | Well Began Production |
| 2005-12-11 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2005-12-11 | Well Mode changed to Flowing |
| 2008-10-16 | Perforation Treatment Performed - Jet Perforation |
| 2008-10-24 | Perforation Treatment Performed - Fractured |
| 2008-11-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2008-11-03 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2005-07-30 | Perforation | 286.50 | 287.30 | 7 |
| 2005-07-30 | Perforation | 187.00 | 188.00 | 7 |
| 2005-07-30 | Perforation | 182.80 | 184.00 | 7 |
| 2005-07-30 | Perforation | 172.50 | 173.00 | 14 |
| 2005-07-30 | Perforation | 154.50 | 155.00 | 14 |
| 2005-08-02 | Fracture | 286.50 | 287.30 | 0 |
| 2005-08-02 | Fracture | 266.80 | 267.80 | 0 |
| 2005-08-02 | Fracture | 229.00 | 230.00 | 0 |
| 2005-08-02 | Fracture | 224.50 | 226.00 | 0 |
| 2005-08-02 | Fracture | 221.80 | 223.00 | 0 |
| 2005-08-02 | Fracture | 216.50 | 218.50 | 0 |
| 2005-07-30 | Perforation | 266.80 | 267.80 | 7 |
| 2005-08-02 | Fracture | 211.80 | 212.30 | 0 |
| 2005-08-02 | Fracture | 203.50 | 206.00 | 0 |
| 2005-08-02 | Fracture | 198.30 | 199.50 | 0 |
| 2005-08-02 | Fracture | 187.00 | 188.00 | 0 |
| 2005-08-02 | Fracture | 182.80 | 184.00 | 0 |
| 2005-08-02 | Fracture | 172.50 | 173.00 | 0 |
| 2005-08-02 | Fracture | 154.50 | 155.00 | 0 |
| 2008-10-16 | Perforation | 347.00 | 351.00 | 17 |
| 2008-10-16 | Perforation | 343.00 | 345.00 | 17 |
| 2008-10-16 | Perforation | 317.00 | 319.00 | 17 |
| 2005-07-30 | Perforation | 229.00 | 230.00 | 7 |
| 2008-10-24 | Fracture | 317.00 | 351.00 | 0 |
| 2005-07-30 | Perforation | 224.50 | 226.00 | 7 |
| 2005-07-30 | Perforation | 221.80 | 223.00 | 7 |
| 2005-07-30 | Perforation | 216.50 | 218.50 | 7 |
| 2005-07-30 | Perforation | 211.80 | 212.30 | 14 |
| 2005-07-30 | Perforation | 203.50 | 206.00 | 7 |
| 2005-07-30 | Perforation | 198.30 | 199.50 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2005 | 498 | 0.0 | 0.0 | 0.0 |
| 2006 | 8582 | 0.0 | 0.0 | 0.0 |
| 2007 | 7728 | 0.0 | 0.0 | 0.0 |
| 2008 | 7409 | 0.0 | 0.0 | 0.0 |
| 2009 | 8339 | 0.0 | 0.0 | 0.0 |
| 2010 | 8702 | 0.0 | 0.0 | 0.0 |
| 2011 | 8698 | 0.0 | 0.0 | 0.0 |
| 2012 | 8704 | 0.0 | 0.0 | 0.0 |
| 2013 | 8574 | 0.0 | 0.0 | 0.0 |
| 2014 | 8664 | 0.0 | 0.0 | 0.0 |
| 2015 | 8683 | 0.0 | 0.0 | 0.0 |
| 2016 | 8767 | 0.0 | 0.0 | 0.0 |
| 2017 | 8754 | 0.0 | 0.0 | 0.0 |
| 2018 | 8611 | 0.0 | 0.0 | 0.0 |
| 2019 | 2973 | 0.0 | 0.0 | 0.0 |
| 2020 | 2092 | 0.0 | 0.0 | 0.0 |
For data sources see[5]