If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424210415000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.591387,"lon":-112.95265,"icon":""}]} |
Location: 00/15-04-042-21W4/0 | |
Location Alias: 00/15-04-42-21 W4M | |
Location Alias 2: 00/15-04-042-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 21 | |
Section: 04 | |
County/Municipality: Camrose County | |
Well Name: EMBER BASHAW 15-4-42-21 | |
Operator Name: Ember Resources Inc. | |
License Number: 0407828 | |
License Date: 2009-01-14 | |
License Status: Issued | |
Spud Date: 2009-02-06 | |
Final Drill Date: 2009-02-07 | |
Well Total Depth: 936.00 m | |
Surface Hole Latitude: 52.591387 | |
Surface Hole Longitude: -112.952650 |
Date | Event |
---|---|
2009-01-08 | Well Log Performed |
2009-01-14 | Obtained License |
2009-02-06 | Direction Drilling Operation Performed - Deviate |
2009-02-07 | Finished Drilling |
2009-02-07 | Surface Casing Operation Performed |
2009-02-07 | Well Mode changed to Drilled and Cased |
2009-02-08 | Production Casing Operation Performed |
2009-02-08 | Rig Released |
2009-02-08 | Well Log Performed |
2009-02-22 | Perforation Treatment Performed - Jet Perforation |
2009-02-22 | Well Log Performed |
2009-03-07 | Well Began Production |
2009-03-07 | Well Fluid changed to Coalbed Methane-Coals Only |
2009-03-07 | Well Mode changed to Flowing |
2009-05-13 | Well Log Performed |
2009-05-26 | Perforation Treatment Performed - Jet Perforation |
2009-05-26 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-05-26 | Well Mode changed to Suspended |
2009-05-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-05-27 | Well Mode changed to Flowing |
2009-05-28 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-02-06 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-02-22 | Perforation | 443.40 | 444.40 | 13 |
2009-02-22 | Perforation | 339.20 | 340.20 | 13 |
2009-02-22 | Perforation | 335.30 | 335.80 | 13 |
2009-02-22 | Perforation | 325.90 | 326.40 | 13 |
2009-02-22 | Perforation | 321.50 | 322.00 | 13 |
2009-05-26 | Perforation | 444.40 | 444.90 | 13 |
2009-05-26 | Perforation | 424.30 | 424.80 | 13 |
2009-05-26 | Perforation | 421.00 | 422.00 | 13 |
2009-05-26 | Perforation | 397.50 | 398.50 | 13 |
2009-05-26 | Perforation | 394.20 | 395.20 | 13 |
2009-05-26 | Perforation | 392.70 | 393.70 | 13 |
2009-02-22 | Perforation | 423.70 | 424.20 | 13 |
2009-05-26 | Perforation | 385.50 | 386.50 | 13 |
2009-05-26 | Perforation | 384.00 | 385.00 | 13 |
2009-05-26 | Perforation | 356.80 | 357.30 | 13 |
2009-05-26 | Perforation | 347.00 | 348.00 | 13 |
2009-05-26 | Perforation | 345.50 | 346.50 | 13 |
2009-05-26 | Perforation | 343.40 | 343.90 | 13 |
2009-05-26 | Perforation | 340.20 | 340.70 | 13 |
2009-05-26 | Perforation | 326.50 | 327.00 | 13 |
2009-05-26 | Perforation | 325.40 | 325.90 | 13 |
2009-05-28 | Fracture | 421.00 | 444.90 | 0 |
2009-02-22 | Perforation | 393.70 | 394.20 | 13 |
2009-05-28 | Fracture | 384.00 | 398.50 | 0 |
2009-05-28 | Fracture | 321.50 | 357.30 | 0 |
2009-02-22 | Perforation | 388.90 | 389.40 | 13 |
2009-02-22 | Perforation | 385.10 | 385.60 | 13 |
2009-02-22 | Perforation | 356.30 | 356.80 | 13 |
2009-02-22 | Perforation | 350.90 | 351.90 | 13 |
2009-02-22 | Perforation | 346.50 | 347.00 | 13 |
2009-02-22 | Perforation | 344.00 | 345.50 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 7116 | 0.0 | 0.0 | 0.0 |
2010 | 8634 | 0.0 | 0.0 | 0.0 |
2011 | 7601 | 0.0 | 0.0 | 0.0 |
2012 | 7234 | 0.0 | 0.0 | 0.0 |
2013 | 7642 | 0.0 | 0.0 | 0.0 |
2014 | 8491 | 0.0 | 0.0 | 0.0 |
2015 | 7226 | 0.0 | 0.0 | 0.0 |
2016 | 8502 | 0.0 | 0.0 | 0.0 |
2017 | 8471 | 0.0 | 0.0 | 0.0 |
2018 | 7751 | 0.0 | 0.0 | 0.0 |
2019 | 7547 | 0.0 | 0.0 | 0.0 |
2020 | 1682 | 0.0 | 0.0 | 0.0 |
For data sources see[6]