If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424211202000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.597486,"lon":-112.894792,"icon":""}]} |
Location: 00/02-12-042-21W4/0 | |
Location Alias: 00/02-12-42-21 W4M | |
Location Alias 2: 00/02-12-042-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 21 | |
Section: 12 | |
County/Municipality: Camrose County | |
Well Name: EMBER BASHAW 2-12-42-21 | |
Operator Name: Ember Resources Inc. | |
License Number: 0331362 | |
License Date: 2005-05-20 | |
License Status: Amended | |
Spud Date: 2005-06-11 | |
Final Drill Date: 2005-07-20 | |
Well Total Depth: 440.00 m | |
Surface Hole Latitude: 52.597486 | |
Surface Hole Longitude: -112.894792 |
Date | Event |
---|---|
2005-05-20 | Obtained License |
2005-06-11 | Surface Casing Operation Performed |
2005-07-19 | Production Casing Operation Performed |
2005-07-20 | Finished Drilling |
2005-07-20 | Rig Released |
2005-07-20 | Well Mode changed to Drilled and Cased |
2005-07-29 | Well Log Performed |
2005-08-06 | Perforation Treatment Performed - Jet Perforation |
2005-08-08 | Perforation Treatment Performed - Fractured |
2005-09-02 | Well Began Production |
2005-09-02 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-09-02 | Well Mode changed to Flowing |
2008-12-08 | Perforation Treatment Performed - Jet Perforation |
2008-12-16 | Perforation Treatment Performed - Fractured |
2008-12-20 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-12-20 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-08-06 | Perforation | 299.00 | 299.50 | 14 |
2005-08-06 | Perforation | 203.00 | 204.30 | 7 |
2005-08-06 | Perforation | 194.00 | 195.00 | 7 |
2005-08-06 | Perforation | 191.00 | 192.00 | 7 |
2005-08-06 | Perforation | 188.00 | 189.00 | 7 |
2005-08-06 | Perforation | 180.00 | 181.00 | 7 |
2005-08-06 | Perforation | 160.00 | 160.50 | 14 |
2005-08-08 | Fracture | 299.00 | 299.50 | 0 |
2005-08-08 | Fracture | 271.00 | 272.00 | 0 |
2005-08-08 | Fracture | 257.50 | 258.00 | 0 |
2005-08-08 | Fracture | 252.00 | 253.00 | 0 |
2005-08-06 | Perforation | 271.00 | 272.00 | 7 |
2005-08-08 | Fracture | 246.00 | 248.50 | 0 |
2005-08-08 | Fracture | 232.50 | 233.50 | 0 |
2005-08-08 | Fracture | 222.00 | 222.50 | 0 |
2005-08-08 | Fracture | 219.50 | 220.00 | 0 |
2005-08-08 | Fracture | 203.00 | 204.30 | 0 |
2005-08-08 | Fracture | 194.00 | 195.00 | 0 |
2005-08-08 | Fracture | 191.00 | 192.00 | 0 |
2005-08-08 | Fracture | 188.00 | 189.00 | 0 |
2005-08-08 | Fracture | 180.00 | 181.00 | 0 |
2005-08-08 | Fracture | 160.00 | 160.50 | 0 |
2005-08-06 | Perforation | 257.50 | 258.00 | 14 |
2008-12-08 | Perforation | 407.50 | 410.00 | 17 |
2008-12-08 | Perforation | 405.00 | 407.50 | 17 |
2008-12-08 | Perforation | 386.00 | 391.00 | 17 |
2008-12-08 | Perforation | 374.00 | 376.50 | 17 |
2008-12-08 | Perforation | 353.50 | 357.00 | 17 |
2008-12-08 | Perforation | 350.00 | 353.50 | 17 |
2008-12-08 | Perforation | 315.00 | 320.00 | 17 |
2008-12-16 | Fracture | 315.00 | 410.00 | 0 |
2005-08-06 | Perforation | 252.00 | 253.00 | 7 |
2005-08-06 | Perforation | 246.00 | 248.50 | 7 |
2005-08-06 | Perforation | 232.50 | 233.50 | 7 |
2005-08-06 | Perforation | 222.00 | 222.50 | 14 |
2005-08-06 | Perforation | 219.50 | 220.00 | 14 |
2005-08-06 | Perforation | 209.00 | 210.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 2318 | 0.0 | 0.0 | 0.0 |
2006 | 8529 | 0.0 | 0.0 | 0.0 |
2007 | 8696 | 0.0 | 0.0 | 0.0 |
2008 | 8358 | 0.0 | 0.0 | 0.0 |
2009 | 8505 | 0.0 | 0.0 | 0.0 |
2010 | 8734 | 0.0 | 0.0 | 0.0 |
2011 | 8735 | 0.0 | 0.0 | 0.0 |
2012 | 8757 | 0.0 | 0.0 | 0.0 |
2013 | 8703 | 0.0 | 0.0 | 0.0 |
2014 | 8598 | 0.0 | 0.0 | 0.0 |
2015 | 8711 | 0.0 | 0.0 | 0.0 |
2016 | 8761 | 0.0 | 0.0 | 0.0 |
2017 | 8728 | 0.0 | 0.0 | 0.0 |
2018 | 8571 | 0.0 | 0.0 | 0.0 |
2019 | 2974 | 0.0 | 0.0 | 0.0 |
2020 | 2003 | 0.0 | 0.0 | 0.0 |
For data sources see[5]