If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424211710022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.617638,"lon":-112.988697,"icon":""}]} |
Location: 02/10-17-042-21W4/2 | |
Location Alias: 02/10-17-42-21 W4M | |
Location Alias 2: 02/10-17-042-21 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 21 | |
Section: 17 | |
County/Municipality: Camrose County | |
Well Name: EMBER 102 BASHAW 10-17-42-21 | |
Operator Name: Ember Resources Inc. | |
License Number: 0337110 | |
License Date: 2005-08-25 | |
License Status: Issued | |
Spud Date: 2005-09-08 | |
Final Drill Date: 2005-09-19 | |
Well Total Depth: 703.00 m | |
Surface Hole Latitude: 52.617638 | |
Surface Hole Longitude: -112.988697 |
Date | Event |
---|---|
2005-08-25 | Obtained License |
2005-09-08 | Surface Casing Operation Performed |
2005-09-19 | Finished Drilling |
2005-09-19 | Production Casing Operation Performed |
2005-09-19 | Well Log Performed |
2005-09-19 | Well Mode changed to Drilled and Cased |
2005-09-20 | Rig Released |
2005-11-01 | Perforation Treatment Performed - Jet Perforation |
2005-11-01 | Well Log Performed |
2005-11-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-11-29 | Perforation Treatment Performed - Jet Perforation |
2005-11-29 | Plug Back Performed |
2005-12-10 | Well Fluid changed to Gas |
2005-12-10 | Well Mode changed to Testing |
2006-03-21 | Well Began Production |
2006-03-21 | Well Fluid changed to Gas |
2006-03-21 | Well Mode changed to Flowing |
2006-10-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-10-29 | Plug Back Performed |
2006-10-29 | Well Fluid changed to Gas |
2006-10-29 | Well Mode changed to Abandoned Zone |
2006-10-30 | Perforation Treatment Performed - Jet Perforation |
2006-10-31 | Perforation Treatment Performed - Jet Perforation |
2006-11-03 | Perforation Treatment Performed - Fractured |
2009-07-04 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-11-01 | Perforation | 674.00 | 677.00 | 20 |
2006-10-30 | Perforation | 310.00 | 312.00 | 13 |
2006-10-30 | Perforation | 299.00 | 301.00 | 13 |
2006-10-30 | Perforation | 282.50 | 283.50 | 13 |
2006-10-30 | Perforation | 279.50 | 280.00 | 13 |
2006-10-30 | Perforation | 277.00 | 278.00 | 13 |
2006-10-30 | Perforation | 273.00 | 274.00 | 13 |
2006-10-30 | Perforation | 271.00 | 272.00 | 13 |
2006-10-30 | Perforation | 269.00 | 270.00 | 13 |
2006-10-30 | Perforation | 268.00 | 268.50 | 13 |
2006-10-30 | Perforation | 258.00 | 258.50 | 13 |
2005-11-01 | Perforation | 670.00 | 671.00 | 20 |
2006-10-30 | Perforation | 250.00 | 250.50 | 13 |
2006-10-30 | Perforation | 247.80 | 248.80 | 13 |
2006-10-30 | Perforation | 237.50 | 238.50 | 13 |
2006-10-30 | Perforation | 207.00 | 208.00 | 13 |
2006-10-31 | Perforation | 463.50 | 465.00 | 20 |
2006-11-03 | Fracture | 207.00 | 356.00 | 0 |
2005-11-29 | Packing Device Capped w/Cement | 657.00 | 665.00 | 0 |
2005-11-29 | Perforation | 510.00 | 513.00 | 17 |
2006-10-29 | Packing Device Capped w/Cement | 497.00 | 505.00 | 0 |
2006-10-30 | Perforation | 355.00 | 356.00 | 13 |
2006-10-30 | Perforation | 344.00 | 345.00 | 13 |
2006-10-30 | Perforation | 339.00 | 340.00 | 13 |
2006-10-30 | Perforation | 327.00 | 328.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 5095 | 0.0 | 0.0 | 0.0 |
For data sources see[5]