If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0425030615000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.580777,"lon":-114.420773,"icon":""}]} |
Location: 00/15-06-042-03W5/0 | |
Location Alias: 00/15-06-42-03 W5M | |
Location Alias 2: 00/15-06-042-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 5 | |
Range: 03 | |
Section: 06 | |
County/Municipality: Lacombe County | |
Well Name: PLR GILBY 15-6-42-3 | |
Operator Name: Point Loma Resources Ltd. | |
License Number: 0432231 | |
License Date: 2011-03-09 | |
License Status: Amended | |
Spud Date: 2011-05-12 | |
Final Drill Date: 2011-05-26 | |
Well Total Depth: 3494.00 m | |
Surface Hole Latitude: 52.580777 | |
Surface Hole Longitude: -114.420773 |
Date | Event |
---|---|
2011-03-09 | Obtained License |
2011-05-13 | Surface Casing Operation Performed |
2011-05-16 | Direction Drilling Operation Performed - Horizontal |
2011-05-16 | Well Log Performed |
2011-05-19 | Well Log Performed |
2011-05-20 | Intermediate Casing Operation Performed |
2011-05-21 | Well Log Performed |
2011-05-22 | Well Log Performed |
2011-05-26 | Finished Drilling |
2011-05-26 | Well Mode changed to Drilled and Cased |
2011-05-30 | Liner Casing Operation Performed |
2011-05-30 | Rig Released |
2011-06-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-06-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-07-08 | Well Log Performed |
2011-08-01 | Well Fluid changed to Gas |
2011-08-01 | Well Mode changed to Testing |
2011-08-26 | Well Began Production |
2011-08-26 | Well Fluid changed to Gas |
2011-08-26 | Well Mode changed to Flowing |
2014-04-01 | Well Fluid changed to Gas |
2014-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-05-16 | 1678.50 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-06-15 | Multi-Stage Fracture | 3383.40 | 3383.50 | 0 |
2011-06-18 | Multi-Stage Fracture | 2370.32 | 2370.33 | 0 |
2011-06-18 | Multi-Stage Fracture | 3274.50 | 3274.60 | 0 |
2011-06-18 | Multi-Stage Fracture | 3177.20 | 3177.30 | 0 |
2011-06-18 | Multi-Stage Fracture | 3056.90 | 3057.00 | 0 |
2011-06-18 | Multi-Stage Fracture | 2936.60 | 2936.70 | 0 |
2011-06-18 | Multi-Stage Fracture | 2828.00 | 2828.10 | 0 |
2011-06-18 | Multi-Stage Fracture | 2708.00 | 2708.10 | 0 |
2011-06-18 | Multi-Stage Fracture | 2599.04 | 2599.05 | 0 |
2011-06-18 | Multi-Stage Fracture | 2490.21 | 2490.22 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 2771 | 0.0 | 0.0 | 0.0 |
2012 | 8104 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8447 | 0.0 | 0.0 | 0.0 |
2015 | 8735 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 7565 | 0.0 | 0.0 | 0.0 |
2018 | 8592 | 0.0 | 0.0 | 0.0 |
2019 | 1354 | 0.0 | 0.0 | 0.0 |
For data sources see[6]