If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0425050110002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.590484,"lon":-114.586556,"icon":""}]} |
| Location: 00/10-01-042-05W5/2 | |
| Location Alias: 00/10-01-42-05 W5M | |
| Location Alias 2: 00/10-01-042-05 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 042 | |
| Meridian: 5 | |
| Range: 05 | |
| Section: 01 | |
| County/Municipality: Clearwater County | |
| Well Name: HARVEST GILBY 10-1-42-5 | |
| Operator Name: Harvest Operations Corp. | |
| License Number: 0023793 | |
| License Date: 1963-02-13 | |
| License Status: Suspension | |
| Spud Date: 1963-02-15 | |
| Final Drill Date: 1963-03-09 | |
| Well Total Depth: 2306.70 m | |
| Surface Hole Latitude: 52.590484 | |
| Surface Hole Longitude: -114.586556 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1963-02-13 | Obtained License |
| 1963-03-09 | Finished Drilling |
| 1963-03-10 | Drill Stem Test Performed |
| 1963-03-11 | Drill Stem Test Performed |
| 1963-03-13 | Production Casing Operation Performed |
| 1963-05-15 | Perforation Treatment Performed - Jet Perforation |
| 1963-05-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1963-05-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1963-05-20 | Perforation Treatment Performed - Jet Perforation |
| 1992-11-25 | Perforation Treatment Performed - Cement Squeeze |
| 1992-11-25 | Plug Back Performed |
| 1992-11-26 | Perforation Treatment Performed - Jet Perforation |
| 1992-11-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1992-11-27 | Perforation Treatment Performed - Cement Squeeze |
| 1992-11-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1992-11-30 | Perforation Treatment Performed - Jet Perforation |
| 1992-12-04 | Well Mode changed to Drilled and Cased |
| 1993-07-16 | Well Began Production |
| 1993-07-16 | Well Fluid changed to Gas |
| 1993-07-16 | Well Mode changed to Flowing |
| 1997-07-21 | Perforation Treatment Performed - Jet Perforation |
| 1997-07-21 | Well Log Performed |
| 1997-07-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-07-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-10-01 | Well Fluid changed to Gas |
| 1997-10-01 | Well Mode changed to Suspended |
| 1998-01-25 | Well Log Performed |
| 1998-07-19 | Well Log Performed |
| 2014-08-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2014-08-05 | Perforation Treatment Performed - Cement Plug |
| 2014-08-05 | Plug Back Performed |
| 2014-08-05 | Well Fluid changed to Gas |
| 2014-08-05 | Well Log Performed |
| 2014-08-05 | Well Mode changed to Abandoned Zone |
| 2014-08-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2014-08-07 | Well Log Performed |
| 2014-08-08 | Perforation Treatment Performed - Cement Plug |
| 2014-08-08 | Perforation Treatment Performed - Jet Perforation |
| 2014-08-08 | Perforation Treatment Performed - Remedial Casing |
| 2014-08-08 | Well Log Performed |
| 2014-08-11 | Perforation Treatment Performed - Cement Plug |
| 2014-08-11 | Perforation Treatment Performed - Jet Perforation |
| 2014-08-11 | Perforation Treatment Performed - Remedial Casing |
| 2014-08-12 | Well Log Performed |
| 2014-08-13 | Perforation Treatment Performed - Remedial Casing |
| 2014-08-14 | Perforation Treatment Performed - Cement Plug |
| 2014-08-14 | Perforation Treatment Performed - Jet Perforation |
| 2014-08-14 | Well Log Performed |
| 2014-08-18 | Perforation Treatment Performed - Cement Plug |
| 2014-08-18 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1963-05-15 | Perforation | 2172.60 | 2173.80 | 13 |
| 1992-11-30 | Acid Treatment | 2214.00 | 2220.00 | 0 |
| 1997-07-21 | Perforation | 2237.00 | 2240.00 | 20 |
| 1997-07-21 | Perforation | 2231.00 | 2237.00 | 20 |
| 1997-07-23 | Acid Treatment | 2231.00 | 2240.00 | 0 |
| 1997-07-28 | Acid Treatment | 2231.00 | 2240.00 | 0 |
| 2014-08-05 | Cement Plug | 2196.00 | 2208.00 | 0 |
| 2014-08-05 | Packing Device Capped w/Cement | 2156.00 | 2168.00 | 0 |
| 2014-08-06 | Packing Device Capped w/Cement | 1958.00 | 1970.00 | 0 |
| 2014-08-08 | Perforation | 1090.50 | 1092.50 | 14 |
| 2014-08-08 | Remedial Casing Cementing | 1090.50 | 1092.50 | 0 |
| 1963-05-18 | Acid Treatment | 2172.60 | 2173.80 | 0 |
| 2014-08-08 | Cement Plug | 1079.00 | 1094.00 | 0 |
| 2014-08-11 | Perforation | 576.00 | 578.00 | 14 |
| 2014-08-11 | Remedial Casing Cementing | 576.00 | 578.00 | 0 |
| 2014-08-11 | Cement Plug | 567.00 | 580.00 | 0 |
| 2014-08-11 | Perforation | 564.00 | 565.00 | 14 |
| 2014-08-13 | Remedial Casing Cementing | 564.00 | 565.00 | 0 |
| 2014-08-14 | Cement Plug | 560.00 | 566.00 | 0 |
| 2014-08-14 | Perforation | 247.00 | 248.00 | 14 |
| 2014-08-18 | Remedial Casing Cementing | 247.00 | 248.00 | 0 |
| 2014-08-18 | Cement Plug | 224.00 | 249.00 | 0 |
| 1963-05-20 | Packing Device Capped w/Cement | 2144.30 | 2169.90 | 0 |
| 1963-05-20 | Perforation | 1974.50 | 1976.90 | 13 |
| 1992-11-25 | Cement Squeeze | 1974.50 | 1976.90 | 0 |
| 1992-11-26 | Perforation | 2172.60 | 2173.80 | 13 |
| 1992-11-27 | Acid Treatment | 2172.60 | 2173.80 | 0 |
| 1992-11-27 | Cement Squeeze | 2172.60 | 2173.80 | 0 |
| 1992-11-30 | Perforation | 2214.00 | 2220.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1992 | 181 | 0.0 | 0.0 | 0.0 |
| 1993 | 3710 | 0.0 | 0.0 | 0.0 |
| 1994 | 7295 | 0.0 | 0.0 | 0.0 |
| 1995 | 7492 | 0.0 | 0.0 | 0.0 |
| 1996 | 7790 | 0.0 | 0.0 | 0.0 |
| 1997 | 4844 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-08-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]