X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425050116000

Well Details

Well ID: 0425050116000
Loading map...
Location: 00/16-01-042-05W5/0
Location Alias: 00/16-01-42-05 W5M
Location Alias 2: 00/16-01-042-05 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 05
Section: 01
County/Municipality: Clearwater County
Well Name: HARVEST HZ GILBY 16-1-42-5
Operator Name: Harvest Operations Corp.
License Number: 0430667
License Date: 2011-01-26
License Status: Amended
Spud Date: 2011-09-28
Final Drill Date: 2011-10-09
Well Total Depth: 3552.00 m
Surface Hole Latitude: 52.581991
Surface Hole Longitude: -114.581748

For data sources see[1][2]

Well History

Date Event
2011-01-26 Obtained License
2011-09-29 Surface Casing Operation Performed
2011-09-30 Well Log Performed
2011-10-02 Direction Drilling Operation Performed - Deviate
2011-10-04 Direction Drilling Operation Performed - Horizontal
2011-10-05 Intermediate Casing Operation Performed
2011-10-05 Well Log Performed
2011-10-09 Finished Drilling
2011-10-09 Well Log Performed
2011-10-09 Well Mode changed to Drilled and Cased
2011-10-10 Liner Casing Operation Performed
2011-10-10 Perforation Treatment Performed - Open-Hole Completion
2011-10-11 Rig Released
2011-10-18 Well Log Performed
2011-12-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-10 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-11 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-05 Well Began Production
2012-01-05 Well Fluid changed to Gas
2012-01-05 Well Mode changed to Flowing
2017-01-01 Well Fluid changed to Gas
2017-01-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-02 1841.30 Deviate (5 - 79 degrees)
2011-10-04 2291.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-10 Open Hole/Barefoot Completion 3541.00 3552.00 0
2011-12-10 Multi-Stage Fracture 2765.00 2765.10 0
2011-12-10 Multi-Stage Fracture 2677.20 2677.30 0
2011-12-11 Multi-Stage Fracture 2575.50 2575.60 0
2011-12-11 Multi-Stage Fracture 2473.90 2474.00 0
2011-12-09 Multi-Stage Fracture 3536.80 3536.90 0
2011-12-09 Multi-Stage Fracture 3476.10 3476.20 0
2011-12-09 Multi-Stage Fracture 3374.50 3374.60 0
2011-12-09 Multi-Stage Fracture 3272.90 3273.00 0
2011-12-09 Multi-Stage Fracture 3171.40 3171.50 0
2011-12-10 Multi-Stage Fracture 3069.70 3069.80 0
2011-12-10 Multi-Stage Fracture 2968.20 2968.30 0
2011-12-10 Multi-Stage Fracture 2866.60 2866.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 8711 0.0 0.0 0.0
2013 8573 0.0 0.0 0.0
2014 8613 0.0 0.0 0.0
2015 8279 0.0 0.0 0.0
2016 8567 0.0 0.0 0.0
2017 8495 0.0 0.0 0.0
2018 8447 0.0 0.0 0.0
2019 7584 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References