If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0425070501000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. To navigate, press the arrow keys. ![]() |
Location: 00/01-05-042-07W5/0 | |
Location Alias: 00/01-05-42-07 W5M | |
Location Alias 2: 00/01-05-042-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 5 | |
Range: 07 | |
Section: 05 | |
County/Municipality: Clearwater County | |
Well Name: EXORO ENERGY HZ WILLGR 1-5-42-7 | |
Operator Name: Gear Energy Ltd. | |
License Number: 0429700 | |
License Date: 2011-01-10 | |
License Status: Issued | |
Spud Date: 2011-02-13 | |
Final Drill Date: 2011-03-05 | |
Well Total Depth: 3823.00 m | |
Surface Hole Latitude: 52.600121 | |
Surface Hole Longitude: -114.969542 |
Date | Event |
---|---|
2011-01-10 | Obtained License |
2011-02-15 | Surface Casing Operation Performed |
2011-02-16 | Well Log Performed |
2011-02-17 | Direction Drilling Operation Performed - Horizontal |
2011-02-23 | Intermediate Casing Operation Performed |
2011-02-24 | Well Log Performed |
2011-03-05 | Finished Drilling |
2011-03-05 | Well Log Performed |
2011-03-05 | Well Mode changed to Drilled and Cased |
2011-03-07 | Liner Casing Operation Performed |
2011-03-09 | Rig Released |
2011-03-16 | Perforation Treatment Performed - Open-Hole Completion |
2011-03-17 | Well Log Performed |
2011-03-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-04-05 | Well Began Production |
2011-04-05 | Well Fluid changed to Crude Oil |
2011-04-05 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-02-17 | 1498.10 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-03-16 | Open Hole/Barefoot Completion | 3818.00 | 3823.00 | 0 |
2011-03-30 | Multi-Stage Fracture | 3252.30 | 3252.40 | 0 |
2011-03-30 | Multi-Stage Fracture | 3367.40 | 3367.50 | 0 |
2011-03-30 | Multi-Stage Fracture | 3492.10 | 3492.20 | 0 |
2011-03-30 | Multi-Stage Fracture | 3604.10 | 3604.20 | 0 |
2011-03-30 | Multi-Stage Fracture | 3716.00 | 3716.10 | 0 |
2011-03-30 | Multi-Stage Fracture | 3795.30 | 3795.40 | 0 |
2011-03-30 | Multi-Stage Fracture | 2374.20 | 2374.30 | 0 |
2011-03-30 | Multi-Stage Fracture | 2457.00 | 2457.10 | 0 |
2011-03-30 | Multi-Stage Fracture | 2565.40 | 2565.50 | 0 |
2011-03-30 | Multi-Stage Fracture | 2686.80 | 2686.90 | 0 |
2011-03-30 | Multi-Stage Fracture | 2795.50 | 2795.60 | 0 |
2011-03-30 | Multi-Stage Fracture | 2916.20 | 2916.30 | 0 |
2011-03-30 | Multi-Stage Fracture | 3023.80 | 3023.90 | 0 |
2011-03-30 | Multi-Stage Fracture | 3145.50 | 3145.60 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6164 | 0.0 | 0.0 | 0.0 |
2012 | 8561 | 0.0 | 0.0 | 0.0 |
2013 | 8531 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8264 | 0.0 | 0.0 | 0.0 |
2016 | 8735 | 0.0 | 0.0 | 0.0 |
2017 | 8496 | 0.0 | 0.0 | 0.0 |
2018 | 8311 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]