If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0425070614030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.579767,"lon":-115.003253,"icon":""}]} |
| Location: 03/14-06-042-07W5/0 | |
| Location Alias: 03/14-06-42-07 W5M | |
| Location Alias 2: 03/14-06-042-07 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 042 | |
| Meridian: 5 | |
| Range: 07 | |
| Section: 06 | |
| County/Municipality: Clearwater County | |
| Well Name: YANGARRA HZ 103 WILLGR 14-6-42-7 | |
| Operator Name: Yangarra Resources Corp. | |
| License Number: 0470358 | |
| License Date: 2014-10-02 | |
| License Status: Issued | |
| Spud Date: 2014-10-20 | |
| Final Drill Date: 2014-10-30 | |
| Well Total Depth: 3538.00 m | |
| Surface Hole Latitude: 52.579767 | |
| Surface Hole Longitude: -115.003253 |
| Date | Event |
|---|---|
| 2014-10-02 | Obtained License |
| 2014-10-21 | Surface Casing Operation Performed |
| 2014-10-24 | Direction Drilling Operation Performed - Deviate |
| 2014-10-25 | Direction Drilling Operation Performed - Horizontal |
| 2014-10-30 | Finished Drilling |
| 2014-10-30 | Well Log Performed |
| 2014-10-30 | Well Mode changed to Drilled and Cased |
| 2014-11-01 | Perforation Treatment Performed - Open-Hole Completion |
| 2014-11-01 | Production Casing Operation Performed |
| 2014-11-01 | Rig Released |
| 2014-11-14 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-11-16 | Well Log Performed |
| 2014-11-29 | Well Began Production |
| 2014-11-29 | Well Fluid changed to Crude Oil |
| 2014-11-29 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2014-10-20 | Trinidad Drilling Ltd. | 53 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2014-10-24 | 1598.50 | Deviate (5 - 79 degrees) |
| 2014-10-25 | 2139.40 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2014-11-01 | Open Hole/Barefoot Completion | 3533.00 | 3538.00 | 0 |
| 2014-11-14 | Multi-Stage Fracture | 2932.70 | 2933.20 | 0 |
| 2014-11-14 | Multi-Stage Fracture | 2853.90 | 2854.50 | 0 |
| 2014-11-14 | Multi-Stage Fracture | 2776.30 | 2776.80 | 0 |
| 2014-11-14 | Multi-Stage Fracture | 2697.90 | 2698.50 | 0 |
| 2014-11-14 | Multi-Stage Fracture | 2619.40 | 2619.90 | 0 |
| 2014-11-14 | Multi-Stage Fracture | 2541.00 | 2541.50 | 0 |
| 2014-11-14 | Multi-Stage Fracture | 2462.40 | 2463.00 | 0 |
| 2014-11-14 | Multi-Stage Fracture | 2383.90 | 2384.40 | 0 |
| 2014-11-14 | Multi-Stage Fracture | 2305.60 | 2306.10 | 0 |
| 2014-11-14 | Multi-Stage Fracture | 2227.20 | 2227.80 | 0 |
| 2014-11-14 | Multi-Stage Fracture | 3506.50 | 3506.90 | 0 |
| 2014-11-14 | Multi-Stage Fracture | 3440.50 | 3441.00 | 0 |
| 2014-11-14 | Multi-Stage Fracture | 3364.00 | 3364.50 | 0 |
| 2014-11-14 | Multi-Stage Fracture | 3298.60 | 3299.20 | 0 |
| 2014-11-14 | Multi-Stage Fracture | 3233.40 | 3233.90 | 0 |
| 2014-11-14 | Multi-Stage Fracture | 3167.80 | 3168.40 | 0 |
| 2014-11-14 | Multi-Stage Fracture | 3089.20 | 3089.80 | 0 |
| 2014-11-14 | Multi-Stage Fracture | 3011.10 | 3011.60 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2014-11-14 | 2014-11-14 | 1,952 | 2,694 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 79.8564 | N/A | |||
| Sand (30/50) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 12.0118 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 12.0118 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 12.0118 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 12.0116 | N/A | ||||
| Sand (40/70) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 1.0445 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 1.0445 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 1.0445 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 1.0445 | N/A | ||||
| SiberProp (20/40) | Canyon | Crystalline silica. quartz | 14808-60-7 | 100 | 2.6112 | N/A | ||
| Phenol formaldehyde resin | 9003-35-4 | 100 | 2.6112 | N/A | ||||
| Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0109 | N/A | |
| Water | 7732-18-5 | 100 | 0.0109 | N/A | ||||
| CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.0688 | N/A | |
| Water | 7732-18-5 | 100 | 0.0688 | N/A | ||||
| CAN-2411 Non-emulsifier | Canyon | Demulsifier | Ethylene glycol | 107-21-1 | 100 | 0.0795 | N/A | |
| Isopropanol | 67-63-0 | 100 | 0.0795 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0795 | N/A | ||||
| Nitrogen Gas | Canyon | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 4.231 | N/A | |
| Non-hazardous base ingredient(s) | Not Available | 100 | 4.231 | N/A | ||||
| CAN-2056 Gellant (G50 Microtox EC50) | Canyon | Gelling Agent | Ammonium Chloride | 12125-02-9 | 100 | 0.0856 | N/A | |
| Hydrotreated Kerosene | 64742-47-8 | 100 | 0.0856 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0856 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2014-11-13 | 2014-11-14 | Surface Water - Runoff | 3000 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2014 | 854 | 0.0 | 0.0 | 0.0 |
| 2015 | 6723 | 0.0 | 0.0 | 0.0 |
| 2016 | 8414 | 0.0 | 0.0 | 0.0 |
| 2017 | 8611 | 0.0 | 0.0 | 0.0 |
| 2018 | 8373 | 0.0 | 0.0 | 0.0 |
| 2019 | 7017 | 0.0 | 0.0 | 0.0 |
| 2020 | 1524 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-11-01 | No Incident Encountered | 0.00 | 0.00 |
| 2014-11-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]