If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0425071802020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.627099,"lon":-114.990983,"icon":""}]} |
Location: 02/02-18-042-07W5/0 | |
Location Alias: 02/02-18-42-07 W5M | |
Location Alias 2: 02/02-18-042-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 5 | |
Range: 07 | |
Section: 18 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA HZ 02 WILLGR 2-18-42-7 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0488090 | |
License Date: 2018-02-12 | |
License Status: Issued | |
Spud Date: 2018-02-19 | |
Final Drill Date: 2018-02-26 | |
Well Total Depth: 3591.00 m | |
Surface Hole Latitude: 52.627099 | |
Surface Hole Longitude: -114.990983 |
Date | Event |
---|---|
2018-02-12 | Obtained License |
2018-02-20 | Surface Casing Operation Performed |
2018-02-23 | Direction Drilling Operation Performed - Deviate |
2018-02-24 | Direction Drilling Operation Performed - Horizontal |
2018-02-26 | Finished Drilling |
2018-02-26 | Well Log Performed |
2018-02-26 | Well Mode changed to Drilled and Cased |
2018-02-28 | Production Casing Operation Performed |
2018-02-28 | Rig Released |
2018-03-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-18 | Well Log Performed |
2018-03-20 | Well Began Production |
2018-03-20 | Well Fluid changed to Crude Oil |
2018-03-20 | Well Mode changed to Flowing |
2018-04-04 | Well Fluid changed to Crude Oil |
2018-04-04 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-02-19 | Trinidad Drilling Ltd. | 42 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-02-23 | 1612.30 | Deviate (5 - 79 degrees) |
2018-02-24 | 2092.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-03-12 | Multi-Stage Fracture | 3545.10 | 3545.20 | 0 |
2018-03-12 | Multi-Stage Fracture | 3387.70 | 3387.80 | 0 |
2018-03-13 | Multi-Stage Fracture | 3370.00 | 3370.10 | 0 |
2018-03-13 | Multi-Stage Fracture | 3352.20 | 3352.30 | 0 |
2018-03-13 | Multi-Stage Fracture | 3334.30 | 3334.40 | 0 |
2018-03-13 | Multi-Stage Fracture | 3316.40 | 3316.50 | 0 |
2018-03-13 | Multi-Stage Fracture | 3299.10 | 3299.20 | 0 |
2018-03-13 | Multi-Stage Fracture | 3281.80 | 3281.90 | 0 |
2018-03-13 | Multi-Stage Fracture | 3264.50 | 3264.60 | 0 |
2018-03-13 | Multi-Stage Fracture | 3247.30 | 3247.40 | 0 |
2018-03-13 | Multi-Stage Fracture | 3230.00 | 3230.10 | 0 |
2018-03-12 | Multi-Stage Fracture | 3528.20 | 3528.30 | 0 |
2018-03-13 | Multi-Stage Fracture | 3212.60 | 3212.70 | 0 |
2018-03-13 | Multi-Stage Fracture | 3195.30 | 3195.40 | 0 |
2018-03-13 | Multi-Stage Fracture | 3178.10 | 3178.20 | 0 |
2018-03-13 | Multi-Stage Fracture | 3160.90 | 3161.00 | 0 |
2018-03-13 | Multi-Stage Fracture | 3144.10 | 3144.20 | 0 |
2018-03-13 | Multi-Stage Fracture | 3127.00 | 3127.10 | 0 |
2018-03-13 | Multi-Stage Fracture | 3109.70 | 3109.80 | 0 |
2018-03-13 | Multi-Stage Fracture | 3092.50 | 3092.60 | 0 |
2018-03-13 | Multi-Stage Fracture | 3075.30 | 3075.40 | 0 |
2018-03-13 | Multi-Stage Fracture | 3058.10 | 3058.20 | 0 |
2018-03-12 | Multi-Stage Fracture | 3510.30 | 3510.40 | 0 |
2018-03-13 | Multi-Stage Fracture | 3040.80 | 3040.90 | 0 |
2018-03-13 | Multi-Stage Fracture | 3023.70 | 3023.80 | 0 |
2018-03-13 | Multi-Stage Fracture | 3006.50 | 3006.60 | 0 |
2018-03-13 | Multi-Stage Fracture | 2989.50 | 2989.60 | 0 |
2018-03-13 | Multi-Stage Fracture | 2972.30 | 2972.40 | 0 |
2018-03-13 | Multi-Stage Fracture | 2955.10 | 2955.20 | 0 |
2018-03-13 | Multi-Stage Fracture | 2937.80 | 2937.90 | 0 |
2018-03-13 | Multi-Stage Fracture | 2920.70 | 2920.80 | 0 |
2018-03-13 | Multi-Stage Fracture | 2903.60 | 2903.70 | 0 |
2018-03-13 | Multi-Stage Fracture | 2886.40 | 2886.50 | 0 |
2018-03-12 | Multi-Stage Fracture | 3492.60 | 3492.70 | 0 |
2018-03-13 | Multi-Stage Fracture | 2869.20 | 2869.30 | 0 |
2018-03-13 | Multi-Stage Fracture | 2852.00 | 2852.10 | 0 |
2018-03-14 | Multi-Stage Fracture | 2834.70 | 2834.80 | 0 |
2018-03-14 | Multi-Stage Fracture | 2817.40 | 2817.50 | 0 |
2018-03-14 | Multi-Stage Fracture | 2800.10 | 2800.20 | 0 |
2018-03-14 | Multi-Stage Fracture | 2783.20 | 2783.30 | 0 |
2018-03-14 | Multi-Stage Fracture | 2765.90 | 2766.00 | 0 |
2018-03-14 | Multi-Stage Fracture | 2748.60 | 2748.70 | 0 |
2018-03-14 | Multi-Stage Fracture | 2731.30 | 2731.40 | 0 |
2018-03-14 | Multi-Stage Fracture | 2714.10 | 2714.20 | 0 |
2018-03-12 | Multi-Stage Fracture | 3474.80 | 3474.90 | 0 |
2018-03-14 | Multi-Stage Fracture | 2696.80 | 2696.90 | 0 |
2018-03-14 | Multi-Stage Fracture | 2679.50 | 2679.60 | 0 |
2018-03-14 | Multi-Stage Fracture | 2662.20 | 2662.30 | 0 |
2018-03-14 | Multi-Stage Fracture | 2644.90 | 2645.00 | 0 |
2018-03-14 | Multi-Stage Fracture | 2627.60 | 2627.70 | 0 |
2018-03-14 | Multi-Stage Fracture | 2610.30 | 2610.40 | 0 |
2018-03-14 | Multi-Stage Fracture | 2593.20 | 2593.30 | 0 |
2018-03-14 | Multi-Stage Fracture | 2576.20 | 2576.30 | 0 |
2018-03-14 | Multi-Stage Fracture | 2558.90 | 2559.00 | 0 |
2018-03-14 | Multi-Stage Fracture | 2541.60 | 2541.70 | 0 |
2018-03-12 | Multi-Stage Fracture | 3457.00 | 3457.10 | 0 |
2018-03-14 | Multi-Stage Fracture | 2524.50 | 2524.60 | 0 |
2018-03-14 | Multi-Stage Fracture | 2507.40 | 2507.50 | 0 |
2018-03-14 | Multi-Stage Fracture | 2490.20 | 2490.30 | 0 |
2018-03-14 | Multi-Stage Fracture | 2472.90 | 2473.00 | 0 |
2018-03-14 | Multi-Stage Fracture | 2455.60 | 2455.70 | 0 |
2018-03-14 | Multi-Stage Fracture | 2438.70 | 2438.80 | 0 |
2018-03-14 | Multi-Stage Fracture | 2421.50 | 2421.60 | 0 |
2018-03-14 | Multi-Stage Fracture | 2404.20 | 2404.30 | 0 |
2018-03-14 | Multi-Stage Fracture | 2387.20 | 2387.30 | 0 |
2018-03-14 | Multi-Stage Fracture | 2370.00 | 2370.10 | 0 |
2018-03-12 | Multi-Stage Fracture | 3439.20 | 3439.30 | 0 |
2018-03-14 | Multi-Stage Fracture | 2352.70 | 2352.80 | 0 |
2018-03-14 | Multi-Stage Fracture | 2335.50 | 2335.60 | 0 |
2018-03-14 | Multi-Stage Fracture | 2318.70 | 2318.80 | 0 |
2018-03-14 | Multi-Stage Fracture | 2301.40 | 2301.50 | 0 |
2018-03-14 | Multi-Stage Fracture | 2284.20 | 2284.30 | 0 |
2018-03-14 | Multi-Stage Fracture | 2266.70 | 2266.80 | 0 |
2018-03-14 | Multi-Stage Fracture | 2249.60 | 2249.70 | 0 |
2018-03-14 | Multi-Stage Fracture | 2232.50 | 2232.60 | 0 |
2018-03-14 | Multi-Stage Fracture | 2215.10 | 2215.20 | 0 |
2018-03-14 | Multi-Stage Fracture | 2197.90 | 2198.00 | 0 |
2018-03-12 | Multi-Stage Fracture | 3422.00 | 3422.10 | 0 |
2018-03-14 | Multi-Stage Fracture | 2180.80 | 2180.90 | 0 |
2018-03-14 | Multi-Stage Fracture | 2163.60 | 2163.70 | 0 |
2018-03-14 | Multi-Stage Fracture | 2146.70 | 2146.80 | 0 |
2018-03-12 | Multi-Stage Fracture | 3404.90 | 3405.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-12 | 2018-03-14 | 1,953 | 7,999 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 82.4094 | N/A | |||
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 14.6309 | N/A | ||
FRAC SAND. 30/50 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 2.5859 | N/A | ||
X-CIDE 450 | BJ Services | Bactericide/Biocide | Glutaraldehyde | 111-30-8 | 100 | 0.0253 | N/A | |
Methanol | 67-56-1 | 100 | 0.0253 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0253 | N/A | ||||
CC-2 | BJ Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.066 | N/A | |
Non-hazardous | Not Available | 100 | 0.066 | N/A | ||||
Water | 7732-18-5 | 100 | 0.066 | N/A | ||||
D-3 | BJ Services | Demulsifier | Ethoxylated alcohol. branched | 78330-19-5 | 100 | 0.0553 | N/A | |
Isopropanol | 67-63-0 | 100 | 0.0553 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0553 | N/A | ||||
MaxPerm-20A | BJ Services | Friction Reducer | Non-hazardous | 9014 | 100 | 0.1549 | N/A | |
Oxyalkylated alcohol | 9014 | 100 | 0.1549 | N/A | ||||
Petroleum distillates | 64742-47-8 | 100 | 0.1549 | N/A | ||||
Polyacrylate | 9014 | 100 | 0.1549 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-03-15 | 2018-03-17 | Surface Water - River | 7092 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 6447 | 0.0 | 0.0 | 0.0 |
2019 | 7948 | 0.0 | 0.0 | 0.0 |
2020 | 1176 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-03-01 | No Incident Encountered | 0.00 | 0.00 |
2018-03-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]