If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0425083013000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.65293,"lon":-115.127018,"icon":""}]} |
| Location: 00/13-30-042-08W5/0 | |
| Location Alias: 00/13-30-42-08 W5M | |
| Location Alias 2: 00/13-30-042-08 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 042 | |
| Meridian: 5 | |
| Range: 08 | |
| Section: 30 | |
| County/Municipality: Clearwater County | |
| Well Name: BELLATRIX HZ WILLGR 13-30-42-8 | |
| Operator Name: Bellatrix Exploration Ltd. | |
| License Number: 0422217 | |
| License Date: 2010-07-27 | |
| License Status: Issued | |
| Spud Date: 2010-09-25 | |
| Final Drill Date: 2010-10-23 | |
| Well Total Depth: 3483.00 m | |
| Surface Hole Latitude: 52.652930 | |
| Surface Hole Longitude: -115.127018 |
| Date | Event |
|---|---|
| 2010-07-27 | Obtained License |
| 2010-09-28 | Surface Casing Operation Performed |
| 2010-10-06 | Direction Drilling Operation Performed - Horizontal |
| 2010-10-08 | Well Log Performed |
| 2010-10-09 | Intermediate Casing Operation Performed |
| 2010-10-09 | Well Log Performed |
| 2010-10-16 | Well Log Performed |
| 2010-10-21 | Well Log Performed |
| 2010-10-23 | Finished Drilling |
| 2010-10-23 | Liner Casing Operation Performed |
| 2010-10-23 | Well Mode changed to Drilled and Cased |
| 2010-10-25 | Rig Released |
| 2010-10-30 | Well Log Performed |
| 2010-11-03 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-11-03 | Perforation Treatment Performed - Open-Hole Completion |
| 2010-11-04 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-11-04 | Well Began Production |
| 2010-11-04 | Well Fluid changed to Crude Oil |
| 2010-11-04 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-10-06 | 1710.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-11-03 | Open Hole/Barefoot Completion | 2040.00 | 3483.00 | 0 |
| 2010-11-03 | Multi-Stage Fracture | 2911.80 | 2911.90 | 0 |
| 2010-11-03 | Multi-Stage Fracture | 2839.70 | 2839.80 | 0 |
| 2010-11-04 | Multi-Stage Fracture | 2766.40 | 2766.50 | 0 |
| 2010-11-04 | Multi-Stage Fracture | 2707.60 | 2707.70 | 0 |
| 2010-11-04 | Multi-Stage Fracture | 2634.40 | 2634.50 | 0 |
| 2010-11-04 | Multi-Stage Fracture | 2562.20 | 2562.30 | 0 |
| 2010-11-04 | Multi-Stage Fracture | 2489.50 | 2489.60 | 0 |
| 2010-11-04 | Multi-Stage Fracture | 2430.70 | 2430.80 | 0 |
| 2010-11-04 | Multi-Stage Fracture | 2357.40 | 2357.50 | 0 |
| 2010-11-04 | Multi-Stage Fracture | 3469.70 | 3469.80 | 0 |
| 2010-11-03 | Multi-Stage Fracture | 3469.70 | 3469.80 | 0 |
| 2010-11-04 | Multi-Stage Fracture | 2289.00 | 2289.10 | 0 |
| 2010-11-04 | Multi-Stage Fracture | 2214.70 | 2214.80 | 0 |
| 2010-11-04 | Multi-Stage Fracture | 2156.20 | 2156.30 | 0 |
| 2010-11-03 | Multi-Stage Fracture | 3390.00 | 3390.10 | 0 |
| 2010-11-03 | Multi-Stage Fracture | 3317.00 | 3317.10 | 0 |
| 2010-11-03 | Multi-Stage Fracture | 3259.10 | 3259.20 | 0 |
| 2010-11-03 | Multi-Stage Fracture | 3186.70 | 3186.80 | 0 |
| 2010-11-03 | Multi-Stage Fracture | 3112.70 | 3112.80 | 0 |
| 2010-11-03 | Multi-Stage Fracture | 3043.10 | 3043.20 | 0 |
| 2010-11-03 | Multi-Stage Fracture | 2982.50 | 2982.60 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 1266 | 0.0 | 0.0 | 0.0 |
| 2011 | 7277 | 0.0 | 0.0 | 0.0 |
| 2012 | 8169 | 0.0 | 0.0 | 0.0 |
| 2013 | 5526 | 0.0 | 0.0 | 0.0 |
| 2014 | 6553 | 0.0 | 0.0 | 0.0 |
| 2015 | 7268 | 0.0 | 0.0 | 0.0 |
| 2016 | 8739 | 0.0 | 0.0 | 0.0 |
| 2017 | 8635 | 0.0 | 0.0 | 0.0 |
| 2018 | 8188 | 0.0 | 0.0 | 0.0 |
| 2019 | 8285 | 0.0 | 0.0 | 0.0 |
| 2020 | 2048 | 0.0 | 0.0 | 0.0 |
For data sources see[6]