X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425092710000

Well Details

Well ID: 0425092710000
Loading map...
Location: 00/10-27-042-09W5/0
Location Alias: 00/10-27-42-09 W5M
Location Alias 2: 00/10-27-042-09 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 09
Section: 27
County/Municipality: Clearwater County
Well Name: OPINAC ET AL FERRIER 10-27-42-9
Operator Name: Opinac Exploration Limited
License Number: 0083871
License Date: 1980-07-02
License Status: Re-Entered
Spud Date: 1980-07-04
Final Drill Date: 1980-08-07
Well Total Depth: 2800.00 m
Surface Hole Latitude: 52.649584
Surface Hole Longitude: -115.208706

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-02 Obtained License
1980-07-17 Drill Stem Test Performed
1980-07-26 Kick Occurred
1980-08-07 Finished Drilling
1980-08-09 Drill Stem Test Performed
1980-08-14 Production Casing Operation Performed
1980-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-21 Perforation Treatment Performed - Jet Perforation
1980-12-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-12-29 Perforation Treatment Performed - Jet Perforation
1980-12-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-01-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-04 Perforation Treatment Performed - Jet Perforation
1981-01-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-01-06 Perforation Treatment Performed - Jet Perforation
1981-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-01-08 Perforation Treatment Performed - Jet Perforation
1981-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-01-10 Perforation Treatment Performed - Jet Perforation
1981-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-14 Perforation Treatment Performed - Jet Perforation
1981-01-15 Perforation Treatment Performed - Fractured
1981-01-19 Well Mode changed to Drilled and Cased
1987-08-04 Well Began Production
1987-08-04 Well Fluid changed to Crude Oil
1987-08-04 Well Mode changed to Flowing
1987-08-28 Well Fluid changed to Crude Oil
1987-08-28 Well Mode changed to Suspended
1988-03-01 Well Fluid changed to Crude Oil
1988-03-01 Well Mode changed to Pumping
1988-10-01 Well Fluid changed to Crude Oil
1988-10-01 Well Mode changed to Suspended
1989-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-03-08 Plug Back Performed
1989-03-08 Well Fluid changed to Crude Oil
1989-03-08 Well Log Performed
1989-03-08 Well Mode changed to Abandoned and Re-entered
1989-03-09 Well Abandoned
2003-10-03 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-12-21 Perforation 2679.50 2683.00 7
1981-01-06 Perforation 2582.50 2587.20 7
1981-01-07 Acid Treatment 2582.50 2587.20 0
1981-01-07 Packing Device Capped w/Cement 2562.00 2570.00 0
1981-01-08 Perforation 2374.00 2376.00 7
1981-01-08 Perforation 2381.00 2382.50 7
1981-01-09 Acid Treatment 2374.00 2382.50 0
1981-01-09 Packing Device Capped w/Cement 2358.00 2362.00 0
1981-01-10 Perforation 2331.00 2334.00 0
1981-01-11 Acid Treatment 2331.00 2334.00 0
1981-01-13 Packing Device Capped w/Cement 2317.00 2325.00 0
1980-12-21 Acid Treatment 2679.50 2683.00 0
1981-01-14 Perforation 2054.50 2056.00 7
1981-01-14 Perforation 2057.00 2058.00 7
1981-01-14 Acid Treatment 2054.50 2058.00 0
1981-01-15 Fracture 2054.50 2058.00 0
1989-03-08 Packing Device Capped w/Cement 2044.00 2052.00 0
1980-12-23 Packing Device Capped w/Cement 2668.00 2676.00 0
1980-12-29 Perforation 2658.00 2660.00 7
1980-12-31 Acid Treatment 2658.00 2660.00 0
1981-01-03 Packing Device Capped w/Cement 2647.00 2655.00 0
1981-01-04 Perforation 2606.50 2610.00 7
1981-01-04 Acid Treatment 2606.50 2610.00 0
1981-01-05 Packing Device Capped w/Cement 2595.00 2603.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 327 0.0 0.0 0.0
1988 503 0.0 0.0 0.0
1989 24 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-07-26 Kick 2346.00 2346.00

For data sources see[6]

References