If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0425151111000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. To navigate, press the arrow keys. ![]() |
Location: 00/11-11-042-15W5/0 | |
Location Alias: 00/11-11-42-15 W5M | |
Location Alias 2: 00/11-11-042-15 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 5 | |
Range: 15 | |
Section: 11 | |
County/Municipality: Clearwater County | |
Well Name: PERSIST OIL STOLBERG 11-11-42-15 | |
Operator Name: Persist Oil And Gas Inc. | |
License Number: 0465968 | |
License Date: 2014-03-28 | |
License Status: Issued | |
Spud Date: 2014-04-30 | |
Final Drill Date: 2014-05-29 | |
Well Total Depth: 3400.00 m | |
Surface Hole Latitude: 52.595376 | |
Surface Hole Longitude: -116.049074 |
Date | Event |
---|---|
2014-03-28 | Obtained License |
2014-05-03 | Surface Casing Operation Performed |
2014-05-06 | Direction Drilling Operation Performed - Deviate |
2014-05-17 | Kick Occurred |
2014-05-19 | Well Log Performed |
2014-05-21 | Intermediate Casing Operation Performed |
2014-05-25 | Direction Drilling Operation Performed - Horizontal |
2014-05-29 | Finished Drilling |
2014-05-29 | Well Mode changed to Drilled and Cased |
2014-05-31 | Well Log Performed |
2014-06-07 | Liner Casing Operation Performed |
2014-06-07 | Perforation Treatment Performed - Slotted Liner or Casing |
2014-06-08 | Perforation Treatment Performed - Open-Hole Completion |
2014-06-08 | Rig Released |
2014-06-13 | Well Began Production |
2014-06-13 | Well Fluid changed to Gas |
2014-06-13 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-05-01 | Precision Drilling Corporation | 603 | N/A | Drill To LD |
2014-04-30 | Precision Drilling Corporation | 603 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-05-06 | 1355.00 | Deviate (5 - 79 degrees) |
2014-05-25 | 3018.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-06-07 | Slotted Liner | 2923.40 | 3370.60 | 0 |
2014-06-08 | Open Hole/Barefoot Completion | 3370.60 | 3400.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 4413 | 0.0 | 0.0 | 0.0 |
2015 | 5442 | 0.0 | 0.0 | 0.0 |
2016 | 6546 | 0.0 | 0.0 | 0.0 |
2017 | 8714 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 5624 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-05-17 | Kick | 2946.00 | 2946.00 |
For data sources see[8]