If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0425162307000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.625559,"lon":-116.197234,"icon":""}]} |
| Location: 00/07-23-042-16W5/0 | |
| Location Alias: 00/07-23-42-16 W5M | |
| Location Alias 2: 00/07-23-042-16 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 042 | |
| Meridian: 5 | |
| Range: 16 | |
| Section: 23 | |
| County/Municipality: Clearwater County | |
| Well Name: TIDEWATER STOLBERG 7-23-42-16 | |
| Operator Name: Pieridae Alberta Production Ltd. | |
| License Number: 0075318 | |
| License Date: 1979-04-24 | |
| License Status: Amended | |
| Spud Date: 1979-05-23 | |
| Final Drill Date: 1980-05-20 | |
| Well Total Depth: 5367.00 m | |
| Surface Hole Latitude: 52.625559 | |
| Surface Hole Longitude: -116.197234 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1979-04-24 | Obtained License |
| 1979-05-23 | Direction Drilling Operation Performed - 98 |
| 1979-08-06 | Lost Circulation Occurred |
| 1979-10-13 | Lost Circulation Occurred |
| 1979-12-09 | Well Log Performed |
| 1980-03-13 | Well Log Performed |
| 1980-04-07 | Well Log Performed |
| 1980-04-12 | Production Casing Operation Performed |
| 1980-04-18 | Lost Circulation Occurred |
| 1980-05-20 | Finished Drilling |
| 1980-05-24 | Kick Occurred |
| 1980-05-25 | Well Log Performed |
| 1980-07-07 | Perforation Treatment Performed - Jet Perforation |
| 1980-07-12 | Perforation Treatment Performed - Fractured |
| 1980-07-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1980-07-23 | Perforation Treatment Performed - Jet Perforation |
| 1980-07-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1980-07-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1980-07-26 | Perforation Treatment Performed - Jet Perforation |
| 1980-07-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1980-11-01 | Perforation Treatment Performed - Fractured |
| 1980-11-06 | Well Mode changed to Drilled and Cased |
| 1995-07-26 | Well Began Production |
| 1995-07-26 | Well Fluid changed to Gas |
| 1995-07-26 | Well Mode changed to Flowing |
| 1996-06-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-06-01 | Plug Back Performed |
| 1996-06-01 | Well Fluid changed to Gas |
| 1996-06-01 | Well Mode changed to Abandoned and Whipstocked |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1979-05-23 | 2609.00 | Conversion |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1980-07-07 | Perforation | 4683.00 | 4700.50 | 6 |
| 1980-07-24 | Acid Treatment | 4009.00 | 4066.00 | 0 |
| 1980-07-25 | Packing Device Capped w/Cement | 3960.00 | 3960.00 | 0 |
| 1980-07-26 | Perforation | 3514.00 | 3527.00 | 6 |
| 1980-07-26 | Perforation | 3535.00 | 3548.50 | 6 |
| 1980-07-26 | Perforation | 3572.00 | 3589.00 | 6 |
| 1980-07-27 | Acid Treatment | 3514.00 | 3589.00 | 0 |
| 1980-11-01 | Fracture | 3514.00 | 3589.00 | 0 |
| 1996-06-01 | Packing Device Capped w/Cement | 3451.00 | 3459.00 | 0 |
| 1980-07-07 | Perforation | 4634.00 | 4642.50 | 6 |
| 1980-07-07 | Perforation | 4660.00 | 4674.00 | 6 |
| 1980-07-12 | Fracture | 4634.00 | 4700.50 | 0 |
| 1980-07-22 | Packing Device Capped w/Cement | 4540.00 | 4540.00 | 0 |
| 1980-07-23 | Perforation | 4009.00 | 4015.50 | 6 |
| 1980-07-23 | Perforation | 4028.50 | 4032.50 | 6 |
| 1980-07-23 | Perforation | 4047.00 | 4055.00 | 6 |
| 1980-07-23 | Perforation | 4061.00 | 4066.00 | 6 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1995 | 1234 | 0.0 | 0.0 | 0.0 |
| 1996 | 1997 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1979-08-06 | Lost Circulation | 2764.00 | 2764.00 |
| 1979-10-13 | Lost Circulation | 2949.00 | 2949.00 |
| 1980-04-18 | Lost Circulation | 4969.00 | 4989.00 |
| 1980-05-24 | Kick | 5367.00 | 5367.00 |
For data sources see[7]