If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434082004002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.715718,"lon":-111.134765,"icon":""}]} |
Location: 00/04-20-043-08W4/2 | |
Location Alias: 00/04-20-43-08 W4M | |
Location Alias 2: 00/04-20-043-08 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 08 | |
Section: 20 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: CLEO ENERGY KILLAM 4-20-43-8 | |
Operator Name: Cleo Energy Corp. | |
License Number: 0137405 | |
License Date: 1988-11-18 | |
License Status: Suspension | |
Spud Date: 1988-11-25 | |
Final Drill Date: 1988-11-27 | |
Well Total Depth: 761.00 m | |
Surface Hole Latitude: 52.715718 | |
Surface Hole Longitude: -111.134765 |
Date | Event |
---|---|
1988-11-18 | Obtained License |
1988-11-26 | Surface Casing Operation Performed |
1988-11-27 | Finished Drilling |
1988-11-27 | Well Mode changed to Drilled and Cased |
1988-11-28 | Drill Stem Test Performed |
1988-11-28 | Well Log Performed |
1988-12-02 | Rig Released |
1988-12-11 | Production Casing Operation Performed |
1988-12-14 | Perforation Treatment Performed - Jet Perforation |
1989-06-29 | Well Log Performed |
1989-06-30 | Perforation Treatment Performed - Jet Perforation |
1989-06-30 | Well Log Performed |
1989-07-01 | Perforation Treatment Performed - Remedial Casing |
2006-08-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-08-02 | Plug Back Performed |
2006-08-02 | Well Log Performed |
2006-08-08 | Perforation Treatment Performed - Jet Perforation |
2006-08-09 | Perforation Treatment Performed - Jet Perforation |
2006-08-18 | Perforation Treatment Performed - Fractured |
2006-09-19 | Well Began Production |
2006-09-19 | Well Fluid changed to Gas |
2006-09-19 | Well Mode changed to Flowing |
2015-04-01 | Well Fluid changed to Gas |
2015-04-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-12-14 | Perforation | 670.50 | 672.50 | 14 |
1989-06-30 | Perforation | 225.00 | 225.50 | 7 |
1989-07-01 | Remedial Casing Cementing | 225.00 | 225.50 | 0 |
2006-08-02 | Packing Device Capped w/Cement | 651.10 | 661.10 | 0 |
2006-08-08 | Perforation | 634.50 | 637.50 | 17 |
2006-08-09 | Perforation | 627.00 | 631.50 | 17 |
2006-08-18 | Fracture | 627.00 | 637.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 2464 | 0.0 | 0.0 | 0.0 |
2007 | 8728 | 0.0 | 0.0 | 0.0 |
2008 | 8753 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8752 | 0.0 | 0.0 | 0.0 |
2011 | 8276 | 0.0 | 0.0 | 0.0 |
2012 | 8710 | 0.0 | 0.0 | 0.0 |
2013 | 6522 | 0.0 | 0.0 | 0.0 |
For data sources see[5]