X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434090305000

Well Details

Well ID: 0434090305000
Loading map...
Location: 00/05-03-043-09W4/0
Location Alias: 00/05-03-43-09 W4M
Location Alias 2: 00/05-03-043-09 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 09
Section: 03
County/Municipality: Municipal District of Provost No. 52
Well Name: CLEO ENERGY KILLAM 5-3-43-9
Operator Name: Cleo Energy Corp.
License Number: 0078003
License Date: 1979-09-13
License Status: Suspension
Spud Date: 1979-12-02
Final Drill Date: 1979-12-05
Well Total Depth: 855.00 m
Surface Hole Latitude: 52.674007
Surface Hole Longitude: -111.232568

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-09-13 Obtained License
1979-12-04 Drill Stem Test Performed
1979-12-05 Finished Drilling
1979-12-05 Well Mode changed to Drilled and Cased
1979-12-06 Production Casing Operation Performed
1980-07-14 Perforation Treatment Performed - Jet Perforation
1980-07-23 Perforation Treatment Performed - Fractured
1981-01-01 Well Began Production
1981-01-01 Well Fluid changed to Gas
1981-01-01 Well Mode changed to Flowing
1982-07-01 Well Fluid changed to Gas
1982-07-01 Well Mode changed to Suspended
1983-02-01 Well Fluid changed to Gas
1983-02-01 Well Mode changed to Flowing
1983-07-01 Well Fluid changed to Gas
1983-07-01 Well Mode changed to Suspended
1984-04-01 Well Fluid changed to Gas
1984-04-01 Well Mode changed to Flowing
1986-01-31 Well Fluid changed to Gas
1986-01-31 Well Mode changed to Suspended
1989-11-09 Well Fluid changed to Gas
1989-11-09 Well Mode changed to Flowing
1990-03-01 Well Fluid changed to Gas
1990-03-01 Well Mode changed to Suspended
2001-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-07-05 Plug Back Performed
2001-07-05 Well Fluid changed to Gas
2001-07-05 Well Mode changed to Abandoned Zone
2001-07-18 Well Log Performed
2001-07-22 Well Log Performed
2001-07-23 Perforation Treatment Performed - Jet Perforation
2006-07-26 Perforation Treatment Performed - Jet Perforation
2006-07-27 Perforation Treatment Performed - Cement Squeeze
2006-07-27 Plug Back Performed
2006-07-27 Well Log Performed
2006-09-14 Well Fluid changed to Gas
2006-09-14 Well Mode changed to Flowing
2012-05-30 Well Fluid changed to Gas
2012-05-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-07-14 Perforation 668.00 669.40 7
1980-07-14 Perforation 671.00 672.50 7
1980-07-23 Fracture 668.00 672.50 0
2001-07-05 Packing Device Capped w/Cement 648.00 657.00 0
2001-07-23 Perforation 265.00 266.00 17
2006-07-26 Perforation 668.00 669.40 7
2006-07-26 Perforation 671.00 672.50 7
2006-07-27 Cement Squeeze 265.00 266.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 3605 0.0 0.0 0.0
1982 1093 0.0 0.0 0.0
1983 1394 0.0 0.0 0.0
1984 2615 0.0 0.0 0.0
1985 2918 0.0 0.0 0.0
1986 479 0.0 0.0 0.0
1989 1083 0.0 0.0 0.0
1990 381 0.0 0.0 0.0
2006 2569 0.0 0.0 0.0
2007 8279 0.0 0.0 0.0
2008 6778 0.0 0.0 0.0
2009 2951 0.0 0.0 0.0
2010 5953 0.0 0.0 0.0
2011 52 0.0 0.0 0.0

For data sources see[5]

References