If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434190415002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.682458,"lon":-112.695591,"icon":""}]} |
Location: 00/15-04-043-19W4/2 | |
Location Alias: 00/15-04-43-19 W4M | |
Location Alias 2: 00/15-04-043-19 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 19 | |
Section: 04 | |
County/Municipality: Camrose County | |
Well Name: RIFE DONALDA 15-4-43-19 | |
Operator Name: Rife Resources Ltd. | |
License Number: 0133812 | |
License Date: 1988-05-10 | |
License Status: RecCertified | |
Spud Date: 1988-05-30 | |
Final Drill Date: 1988-06-03 | |
Well Total Depth: 1232.00 m | |
Surface Hole Latitude: 52.682458 | |
Surface Hole Longitude: -112.695591 |
Date | Event |
---|---|
1988-05-10 | Obtained License |
1988-05-31 | Surface Casing Operation Performed |
1988-06-03 | Drill Stem Test Performed |
1988-06-03 | Finished Drilling |
1988-06-03 | Well Log Performed |
1988-06-03 | Well Mode changed to Drilled and Cased |
1988-06-04 | Drill Stem Test Performed |
1988-06-04 | Production Casing Operation Performed |
1988-06-04 | Rig Released |
1990-09-26 | Well Log Performed |
1990-09-27 | Perforation Treatment Performed - Jet Perforation |
1992-09-11 | Well Log Performed |
1992-09-12 | Well Log Performed |
1992-09-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-09-14 | Plug Back Performed |
1992-09-14 | Well Log Performed |
1992-09-15 | Perforation Treatment Performed - Jet Perforation |
1992-09-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-09-17 | Well Log Performed |
1992-09-18 | Perforation Treatment Performed - Jet Perforation |
1992-09-18 | Well Began Production |
1992-09-18 | Well Fluid changed to Gas |
1992-09-18 | Well Mode changed to Flowing |
1995-08-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-08-10 | Plug Back Performed |
1995-08-10 | Well Abandoned |
1995-08-10 | Well Fluid changed to Gas |
1995-08-10 | Well Log Performed |
1995-08-10 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-09-27 | Perforation | 1201.30 | 1202.50 | 14 |
1992-09-14 | Packing Device Capped w/Cement | 1192.80 | 1200.80 | 0 |
1992-09-15 | Perforation | 1187.70 | 1189.30 | 14 |
1992-09-16 | Acid Treatment | 1187.70 | 1189.30 | 0 |
1992-09-18 | Perforation | 1183.60 | 1184.60 | 14 |
1995-08-10 | Packing Device Capped w/Cement | 1172.00 | 1180.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1992 | 1096 | 0.0 | 0.0 | 0.0 |
1993 | 147 | 0.0 | 0.0 | 0.0 |
1995 | 2 | 0.0 | 0.0 | 0.0 |
For data sources see[5]