If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434211111000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/11-11-043-21W4/0 | |
Location Alias: 00/11-11-43-21 W4M | |
Location Alias 2: 00/11-11-043-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 21 | |
Section: 11 | |
County/Municipality: Camrose County | |
Well Name: EMBER BASHAW 11-11-43-21 | |
Operator Name: Ember Resources Inc. | |
License Number: 0309680 | |
License Date: 2004-06-03 | |
License Status: Issued | |
Spud Date: 2004-08-16 | |
Final Drill Date: 2004-08-17 | |
Well Total Depth: 660.00 m | |
Surface Hole Latitude: 52.691827 | |
Surface Hole Longitude: -112.944480 |
Date | Event |
---|---|
2004-06-03 | Obtained License |
2004-08-16 | Surface Casing Operation Performed |
2004-08-17 | Finished Drilling |
2004-08-17 | Well Log Performed |
2004-08-17 | Well Mode changed to Drilled and Cased |
2004-08-18 | Production Casing Operation Performed |
2004-08-18 | Rig Released |
2004-08-25 | Perforation Treatment Performed - Jet Perforation |
2004-08-25 | Well Log Performed |
2004-08-26 | Perforation Treatment Performed - Fractured |
2004-11-01 | Well Began Production |
2004-11-01 | Well Fluid changed to Gas |
2004-11-01 | Well Mode changed to Flowing |
2010-05-13 | Well Fluid changed to Gas |
2010-05-13 | Well Mode changed to Suspended |
2017-04-25 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-08-25 | Perforation | 617.50 | 619.00 | 13 |
2004-08-25 | Perforation | 266.40 | 267.00 | 13 |
2004-08-25 | Perforation | 285.40 | 286.00 | 13 |
2004-08-25 | Perforation | 295.00 | 295.60 | 13 |
2004-08-26 | Fracture | 617.50 | 619.00 | 0 |
2004-08-26 | Fracture | 188.50 | 295.60 | 0 |
2004-08-25 | Perforation | 188.50 | 190.30 | 13 |
2004-08-25 | Perforation | 196.90 | 198.00 | 13 |
2004-08-25 | Perforation | 206.60 | 208.00 | 13 |
2004-08-25 | Perforation | 208.50 | 209.00 | 13 |
2004-08-25 | Perforation | 221.40 | 222.10 | 13 |
2004-08-25 | Perforation | 238.30 | 240.30 | 13 |
2004-08-25 | Perforation | 241.50 | 242.00 | 13 |
2004-08-25 | Perforation | 249.80 | 250.20 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 672 | 0.0 | 0.0 | 0.0 |
2005 | 7513 | 0.0 | 0.0 | 0.0 |
2006 | 1355 | 0.0 | 0.0 | 0.0 |
For data sources see[5]