If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434223201000 | |
Location: 00/01-32-043-22W4/0 | |
Location Alias: 00/01-32-43-22 W4M | |
Location Alias 2: 00/01-32-043-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 22 | |
Section: 32 | |
County/Municipality: Ponoka County | |
Well Name: CAN-TEX CHEYENNE MALMO 1-32-43-22 | |
Operator Name: Can-Tex Drilling & Exploration ULC | |
License Number: 0077086 | |
License Date: 1979-07-25 | |
License Status: RecCertified | |
Spud Date: 1979-08-12 | |
Final Drill Date: 1979-08-26 | |
Well Total Depth: 1650.00 m | |
Surface Hole Latitude: 52.744547 | |
Surface Hole Longitude: -113.153563 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-07-25 | Obtained License |
1979-08-26 | Finished Drilling |
1979-08-26 | Well Mode changed to Drilled and Cased |
1979-08-28 | Production Casing Operation Performed |
1979-09-18 | Perforation Treatment Performed - Jet Perforation |
1979-09-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1979-09-19 | Well Began Production |
1979-09-19 | Well Fluid changed to Crude Oil |
1979-09-19 | Well Mode changed to Flowing |
1979-09-24 | Perforation Treatment Performed - Jet Perforation |
1979-09-25 | Perforation Treatment Performed - Cement Squeeze |
1979-09-27 | Perforation Treatment Performed - Jet Perforation |
1979-09-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-07-13 | Well Fluid changed to Crude Oil |
1984-07-13 | Well Mode changed to Suspended |
1991-07-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-07-18 | Perforation Treatment Performed - Jet Perforation |
1991-07-18 | Perforation Treatment Performed - Remedial Casing |
1991-07-18 | Plug Back Performed |
1991-07-18 | Well Fluid changed to Crude Oil |
1991-07-18 | Well Mode changed to Abandoned |
1991-07-20 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-09-18 | Perforation | 1632.00 | 1633.20 | 6 |
1979-09-19 | Acid Treatment | 1632.00 | 1633.20 | 0 |
1979-09-24 | Perforation | 1638.00 | 1639.00 | 7 |
1979-09-25 | Cement Squeeze | 1632.00 | 1639.00 | 0 |
1979-09-27 | Perforation | 1632.00 | 1633.20 | 7 |
1979-09-28 | Acid Treatment | 1632.00 | 1633.20 | 0 |
1991-07-18 | Packing Device Capped w/Cement | 1595.00 | 1611.00 | 0 |
1991-07-18 | Perforation | 300.00 | 300.50 | 13 |
1991-07-18 | Remedial Casing Cementing | 300.00 | 300.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 83 | 0.0 | 0.0 | 0.0 |
1983 | 4460 | 0.0 | 0.0 | 0.0 |
1984 | 3076 | 0.0 | 0.0 | 0.0 |
For data sources see[5]