If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434223606003 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/06-36-043-22W4/3 | |
Location Alias: 00/06-36-43-22 W4M | |
Location Alias 2: 00/06-36-043-22 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 22 | |
Section: 36 | |
County/Municipality: Camrose County | |
Well Name: EMBER MALMO 6-36-43-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0314625 | |
License Date: 2004-09-10 | |
License Status: Issued | |
Spud Date: 2004-12-19 | |
Final Drill Date: 2004-12-20 | |
Well Total Depth: 673.00 m | |
Surface Hole Latitude: 52.747238 | |
Surface Hole Longitude: -113.069620 |
Date | Event |
---|---|
2004-09-10 | Obtained License |
2004-12-19 | Surface Casing Operation Performed |
2004-12-20 | Finished Drilling |
2004-12-20 | Production Casing Operation Performed |
2004-12-20 | Rig Released |
2004-12-20 | Well Log Performed |
2004-12-20 | Well Mode changed to Drilled and Cased |
2005-01-06 | Perforation Treatment Performed - Jet Perforation |
2005-01-06 | Well Log Performed |
2005-01-09 | Perforation Treatment Performed - Jet Perforation |
2005-01-09 | Well Log Performed |
2005-01-10 | Perforation Treatment Performed - Fractured |
2005-02-07 | Well Began Production |
2005-02-07 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-02-07 | Well Mode changed to Flowing |
2007-10-26 | Well Log Performed |
2007-10-26 | Well Structure changed to Commingled |
2008-01-08 | Well Fluid changed to Coalbed Methane-Coals Only |
2008-01-08 | Well Mode changed to Flowing |
2010-05-12 | Well Structure changed to Commingled |
2010-07-06 | Well Fluid changed to Coalbed Methane-Coals Only |
2010-07-06 | Well Mode changed to Flowing |
2012-03-15 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-01-06 | Perforation | 600.00 | 602.00 | 13 |
2005-01-09 | Perforation | 248.20 | 250.00 | 13 |
2005-01-09 | Perforation | 251.00 | 251.90 | 13 |
2005-01-09 | Perforation | 265.00 | 267.60 | 13 |
2005-01-09 | Perforation | 274.90 | 275.50 | 13 |
2005-01-09 | Perforation | 276.70 | 277.20 | 13 |
2005-01-09 | Perforation | 289.50 | 290.00 | 13 |
2005-01-09 | Perforation | 303.50 | 304.50 | 13 |
2005-01-09 | Perforation | 309.70 | 310.40 | 13 |
2005-01-09 | Perforation | 317.80 | 318.70 | 13 |
2005-01-10 | Fracture | 413.50 | 414.50 | 0 |
2005-01-09 | Perforation | 413.50 | 414.50 | 13 |
2005-01-10 | Fracture | 182.40 | 318.70 | 0 |
2005-01-09 | Perforation | 182.40 | 192.90 | 13 |
2005-01-09 | Perforation | 210.10 | 212.00 | 13 |
2005-01-09 | Perforation | 213.80 | 214.30 | 13 |
2005-01-09 | Perforation | 215.10 | 215.90 | 13 |
2005-01-09 | Perforation | 223.30 | 225.00 | 13 |
2005-01-09 | Perforation | 236.90 | 238.30 | 13 |
2005-01-09 | Perforation | 244.00 | 244.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 7361 | 0.0 | 0.0 | 0.0 |
2006 | 8467 | 0.0 | 0.0 | 0.0 |
2007 | 7165 | 0.0 | 0.0 | 0.0 |
2008 | 8579 | 0.0 | 0.0 | 0.0 |
2009 | 8722 | 0.0 | 0.0 | 0.0 |
2010 | 7384 | 0.0 | 0.0 | 0.0 |
2011 | 8510 | 0.0 | 0.0 | 0.0 |
2012 | 1763 | 0.0 | 0.0 | 0.0 |
For data sources see[5]