X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435033213000

Well Details

Well ID: 0435033213000
Loading map...
Location: 00/13-32-043-03W5/0
Location Alias: 00/13-32-43-03 W5M
Location Alias 2: 00/13-32-043-03 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 03
Section: 32
County/Municipality: Ponoka County
Well Name: CLEARVIEW PEMBINA 13-32-43-3
Operator Name: Clearview Resources Ltd.
License Number: 0437142
License Date: 2011-09-23
License Status: Issued
Spud Date: 2011-10-13
Final Drill Date: 2011-10-27
Well Total Depth: 3410.00 m
Surface Hole Latitude: 52.742509
Surface Hole Longitude: -114.405074

For data sources see[1][2]

Well History

Date Event
2011-09-23 Obtained License
2011-10-15 Surface Casing Operation Performed
2011-10-15 Well Log Performed
2011-10-17 Direction Drilling Operation Performed - Horizontal
2011-10-21 Intermediate Casing Operation Performed
2011-10-27 Finished Drilling
2011-10-27 Well Mode changed to Drilled and Cased
2011-10-29 Liner Casing Operation Performed
2011-10-30 Rig Released
2011-11-17 Well Log Performed
2011-11-23 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-23 Perforation Treatment Performed - Open-Hole Completion
2011-11-24 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-24 Well Fluid changed to Gas
2011-11-24 Well Mode changed to Testing
2011-12-15 Well Began Production
2011-12-15 Well Fluid changed to Gas
2011-12-15 Well Mode changed to Flowing
2012-11-01 Well Fluid changed to Gas
2012-11-01 Well Mode changed to Pumping
2020-03-31 Well Fluid changed to Gas
2020-03-31 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-17 1634.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-23 Open Hole/Barefoot Completion 3405.00 3410.00 0
2011-11-24 Multi-Stage Fracture 2515.60 2515.70 0
2011-11-24 Multi-Stage Fracture 2415.00 2415.10 0
2011-11-24 Multi-Stage Fracture 2302.20 2302.30 0
2011-11-24 Multi-Stage Fracture 2201.40 2201.50 0
2011-11-23 Multi-Stage Fracture 3350.60 3350.70 0
2011-11-23 Multi-Stage Fracture 3261.80 3261.90 0
2011-11-23 Multi-Stage Fracture 3160.90 3161.00 0
2011-11-23 Multi-Stage Fracture 3046.50 3046.60 0
2011-11-23 Multi-Stage Fracture 2945.70 2945.80 0
2011-11-23 Multi-Stage Fracture 2831.30 2831.40 0
2011-11-23 Multi-Stage Fracture 2730.40 2730.50 0
2011-11-23 Multi-Stage Fracture 2629.60 2629.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 468 0.0 0.0 0.0
2012 8517 0.0 0.0 0.0
2013 8414 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8246 0.0 0.0 0.0
2016 7754 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8545 0.0 0.0 0.0
2019 8200 0.0 0.0 0.0
2020 2040 0.0 0.0 0.0

For data sources see[6]

References