X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435041806002

Well Details

Well ID: 0435041806002
Loading map...
Location: 00/06-18-043-04W5/2
Location Alias: 00/06-18-43-04 W5M
Location Alias 2: 00/06-18-043-04 W5/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 04
Section: 18
County/Municipality: Ponoka County
Well Name: PC ET AL WILS CREEK 6-18-43-4
Operator Name: Tamarack Acquisition Corp.
License Number: 0020946
License Date: 1961-06-20
License Status: Issued
Spud Date: 1961-06-26
Final Drill Date: 1961-07-21
Well Total Depth: 2220.50 m
Surface Hole Latitude: 52.703503
Surface Hole Longitude: -114.572319

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-06-20 Obtained License
1961-07-16 Drill Stem Test Performed
1961-07-21 Finished Drilling
1961-07-21 Well Mode changed to Drilled and Cased
1961-07-23 Production Casing Operation Performed
1965-07-08 Perforation Treatment Performed - Jet Perforation
1965-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-07-14 Perforation Treatment Performed - Fractured
1968-05-27 Perforation Treatment Performed - Jet Perforation
1968-05-27 Well Began Production
1968-05-27 Well Fluid changed to Gas
1968-05-27 Well Mode changed to Flowing
1968-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-03-01 Well Fluid changed to Gas
1972-03-01 Well Mode changed to Suspended
1979-01-25 Perforation Treatment Performed - Cement Squeeze
1979-03-26 Well Fluid changed to Gas
1979-03-26 Well Mode changed to Flowing
2005-01-01 Well Fluid changed to Gas
2005-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-07-08 Perforation 2162.30 2165.60 3
1965-07-08 Perforation 2168.30 2169.30 3
1965-07-09 Acid Treatment 2162.30 2169.30 0
1965-07-14 Fracture 2162.30 2169.30 0
1968-05-27 Perforation 2186.60 2189.10 7
1968-05-27 Perforation 2203.40 2204.90 7
1968-05-28 Acid Treatment 2186.60 2204.90 0
1968-05-31 Acid Treatment 2186.60 2204.90 0
1979-01-25 Cement Squeeze 2162.30 2169.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 0 0.0 0.0 0.0
1969 602 0.0 0.0 0.0
1970 1412 0.0 0.0 0.0
1971 951 0.0 0.0 0.0
1972 268 0.0 0.0 0.0
1978 310 0.0 0.0 0.0
1979 5620 0.0 0.0 0.0
1980 3964 0.0 0.0 0.0
1981 156 0.0 0.0 0.0
1982 4756 0.0 0.0 0.0
1983 6321 0.0 0.0 0.0
1984 2861 0.0 0.0 0.0
1985 5726 0.0 0.0 0.0
1986 5905 0.0 0.0 0.0
1987 5281 0.0 0.0 0.0
1988 8099 0.0 0.0 0.0
1989 7221 0.0 0.0 0.0
1990 7028 0.0 0.0 0.0
1991 4057 0.0 0.0 0.0
1992 6715 0.0 0.0 0.0
1993 4226 0.0 0.0 0.0
1994 4070 0.0 0.0 0.0
1995 985 0.0 0.0 0.0
1996 2391 0.0 0.0 0.0
1997 5487 0.0 0.0 0.0
1998 3925 0.0 0.0 0.0
1999 1509 0.0 0.0 0.0
2000 7172 0.0 0.0 0.0
2001 3981 0.0 0.0 0.0
2002 4127 0.0 0.0 0.0
2003 4390 0.0 0.0 0.0
2004 3762 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8735 0.0 0.0 0.0
2007 8279 0.0 0.0 0.0
2008 8759 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8735 0.0 0.0 0.0
2012 8190 0.0 0.0 0.0
2013 8651 0.0 0.0 0.0
2014 8321 0.0 0.0 0.0
2015 8141 0.0 0.0 0.0
2016 8726 0.0 0.0 0.0
2017 8580 0.0 0.0 0.0
2018 8555 0.0 0.0 0.0
2019 6380 0.0 0.0 0.0
2020 2087 0.0 0.0 0.0

For data sources see[5]

References