X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435043105000

Well Details

Well ID: 0435043105000
Loading map...
Location: 00/05-31-043-04W5/0
Location Alias: 00/05-31-43-04 W5M
Location Alias 2: 00/05-31-043-04 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 04
Section: 31
County/Municipality: Ponoka County
Well Name: TAC PEMBINA 5-31-43-4
Operator Name: Tamarack Acquisition Corp.
License Number: 0422910
License Date: 2010-08-24
License Status: Issued
Spud Date: 2010-09-28
Final Drill Date: 2010-10-08
Well Total Depth: 2694.00 m
Surface Hole Latitude: 52.741577
Surface Hole Longitude: -114.566521

For data sources see[1][2]

Well History

Date Event
2010-08-24 Obtained License
2010-09-30 Surface Casing Operation Performed
2010-10-01 Well Log Performed
2010-10-02 Direction Drilling Operation Performed - Horizontal
2010-10-04 Intermediate Casing Operation Performed
2010-10-08 Finished Drilling
2010-10-08 Well Mode changed to Drilled and Cased
2010-10-10 Liner Casing Operation Performed
2010-10-10 Perforation Treatment Performed - Open-Hole Completion
2010-10-11 Rig Released
2010-10-14 Well Log Performed
2010-10-19 Perforation Treatment Performed - Multi-Stage Fracture
2010-10-20 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-20 Well Began Production
2010-12-20 Well Fluid changed to Crude Oil
2010-12-20 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-02 1238.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-10 Open Hole/Barefoot Completion 2682.00 2694.00 0
2010-10-20 Multi-Stage Fracture 1896.50 1896.60 0
2010-10-19 Multi-Stage Fracture 2666.50 2666.60 0
2010-10-19 Multi-Stage Fracture 2611.50 2611.60 0
2010-10-19 Multi-Stage Fracture 2510.70 2510.80 0
2010-10-19 Multi-Stage Fracture 2409.50 2409.60 0
2010-10-20 Multi-Stage Fracture 2306.60 2306.70 0
2010-10-20 Multi-Stage Fracture 2203.70 2203.80 0
2010-10-20 Multi-Stage Fracture 2101.20 2101.30 0
2010-10-20 Multi-Stage Fracture 1998.70 1998.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 264 0.0 0.0 0.0
2011 8627 0.0 0.0 0.0
2012 8303 0.0 0.0 0.0
2013 7490 0.0 0.0 0.0
2014 6020 0.0 0.0 0.0
2015 385 0.0 0.0 0.0
2016 7206 0.0 0.0 0.0
2017 8163 0.0 0.0 0.0
2018 4909 0.0 0.0 0.0
2019 6097 0.0 0.0 0.0
2020 1791 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-10-14 No Incident Encountered 0.00 0.00

For data sources see[7]

References