X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435052615020

Well Details

Well ID: 0435052615020
Loading map...
Location: 02/15-26-043-05W5/0
Location Alias: 02/15-26-43-05 W5M
Location Alias 2: 02/15-26-043-05 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 05
Section: 26
County/Municipality: Ponoka County
Well Name: CLEARVIEW PEMBINA 15-26-43-5
Operator Name: Clearview Resources Ltd.
License Number: 0470245
License Date: 2014-09-26
License Status: Issued
Spud Date: 2014-10-13
Final Drill Date: 2014-10-25
Well Total Depth: 4128.00 m
Surface Hole Latitude: 52.741528
Surface Hole Longitude: -114.575317

For data sources see[1][2]

Well History

Date Event
2014-09-26 Obtained License
2014-10-15 Surface Casing Operation Performed
2014-10-16 Direction Drilling Operation Performed - Deviate
2014-10-17 Direction Drilling Operation Performed - Horizontal
2014-10-18 Well Log Performed
2014-10-25 Finished Drilling
2014-10-25 Well Log Performed
2014-10-25 Well Mode changed to Drilled and Cased
2014-10-26 Well Log Performed
2014-10-28 Production Casing Operation Performed
2014-10-29 Rig Released
2014-11-05 Well Log Performed
2014-12-03 Perforation Treatment Performed - Abrasa-Jet Perforation
2014-12-03 Perforation Treatment Performed - Multi-Stage Fracture
2014-12-03 Perforation Treatment Performed - Open-Hole Completion
2014-12-04 Well Began Production
2014-12-04 Well Fluid changed to Crude Oil
2014-12-04 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-10-13 Ensign Drilling Inc. 541 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-10-16 1000.00 Deviate (5 - 79 degrees)
2014-10-17 1829.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-12-03 Open Hole/Barefoot Completion 4108.00 4128.00 0
2014-12-03 Multi-Stage Fracture 3442.80 3442.90 0
2014-12-03 Multi-Stage Fracture 3370.30 3370.40 0
2014-12-03 Multi-Stage Fracture 3284.30 3284.40 0
2014-12-03 Multi-Stage Fracture 3211.70 3211.80 0
2014-12-03 Multi-Stage Fracture 3125.60 3125.70 0
2014-12-03 Multi-Stage Fracture 3053.20 3053.30 0
2014-12-03 Multi-Stage Fracture 2967.00 2967.10 0
2014-12-03 Multi-Stage Fracture 2894.50 2894.60 0
2014-12-03 Multi-Stage Fracture 2808.40 2808.50 0
2014-12-03 Multi-Stage Fracture 2735.90 2736.00 0
2014-12-03 Multi-Stage Fracture 4083.00 4083.10 0
2014-12-03 Multi-Stage Fracture 2649.80 2649.90 0
2014-12-03 Multi-Stage Fracture 2563.80 2563.90 0
2014-12-03 Multi-Stage Fracture 2477.60 2477.70 0
2014-12-03 Hydra Jet Perforation 2391.60 2391.70 0
2014-12-03 Multi-Stage Fracture 2305.60 2305.70 0
2014-12-03 Multi-Stage Fracture 2233.10 2233.20 0
2014-12-03 Multi-Stage Fracture 2147.10 2147.20 0
2014-12-03 Multi-Stage Fracture 2074.50 2074.60 0
2014-12-03 Multi-Stage Fracture 1986.70 1986.80 0
2014-12-03 Multi-Stage Fracture 4006.20 4006.30 0
2014-12-03 Multi-Stage Fracture 3918.60 3918.70 0
2014-12-03 Multi-Stage Fracture 3846.10 3846.20 0
2014-12-03 Multi-Stage Fracture 3760.00 3760.10 0
2014-12-03 Multi-Stage Fracture 3687.50 3687.60 0
2014-12-03 Multi-Stage Fracture 3601.40 3601.50 0
2014-12-03 Multi-Stage Fracture 3528.90 3529.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-12-03 2014-12-03 1,648 3,391 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 3.2664 N/A
water Not Available 100 80.2817 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 15.0412 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 1.0638 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0198 N/A
dibromoacetonitrile 3252-43-5 100 0.0198 N/A
non-hazardous ingredients Not Available 100 0.0198 N/A
polyethylene glycol 25322-68-3 100 0.0198 N/A
sodium bromide 7647-15-6 100 0.0198 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0158 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1636 N/A
water Not Available 100 0.1636 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0449 N/A
propylene glycol 57-55-6 100 0.0449 N/A
GFR-1 Trican Friction Reducer non-hazardous ingredients Not Available 100 0.1023 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-11-23 2014-11-25 Surface Water - Runoff 3800
2014-11-22 2014-11-22 Groundwater - Non-saline less than or equal to 150m deep 127

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 190 0.0 0.0 0.0
2015 7577 0.0 0.0 0.0
2016 7746 0.0 0.0 0.0
2017 8409 0.0 0.0 0.0
2018 8735 0.0 0.0 0.0
2019 4392 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-29 No Incident Encountered 0.00 0.00
2014-12-17 No Incident Encountered 0.00 0.00

For data sources see[10]

References