If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0435083613000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.740388,"lon":-115.036546,"icon":""}]} |
Location: 00/13-36-043-08W5/0 | |
Location Alias: 00/13-36-43-08 W5M | |
Location Alias 2: 00/13-36-043-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 5 | |
Range: 08 | |
Section: 36 | |
County/Municipality: Clearwater County | |
Well Name: BELLATRIX HZ WILLGR 13-36-43-8 | |
Operator Name: Bellatrix Exploration Ltd. | |
License Number: 0449427 | |
License Date: 2012-10-24 | |
License Status: Issued | |
Spud Date: 2012-11-07 | |
Final Drill Date: 2012-11-17 | |
Well Total Depth: 3478.00 m | |
Surface Hole Latitude: 52.740388 | |
Surface Hole Longitude: -115.036546 |
Date | Event |
---|---|
2012-10-24 | Obtained License |
2012-11-07 | Well Log Performed |
2012-11-09 | Surface Casing Operation Performed |
2012-11-12 | Direction Drilling Operation Performed - Deviate |
2012-11-13 | Direction Drilling Operation Performed - Horizontal |
2012-11-17 | Finished Drilling |
2012-11-17 | Well Log Performed |
2012-11-17 | Well Mode changed to Drilled and Cased |
2012-11-18 | Lost Circulation Occurred |
2012-11-18 | Production Casing Operation Performed |
2012-11-20 | Rig Released |
2012-11-25 | Well Log Performed |
2012-12-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-12-01 | Perforation Treatment Performed - Open-Hole Completion |
2012-12-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-12-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-12-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-12-09 | Well Began Production |
2012-12-09 | Well Fluid changed to Crude Oil |
2012-12-09 | Well Mode changed to Flowing |
2013-02-08 | Well Fluid changed to Crude Oil |
2013-02-08 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-11-07 | Chinook Drilling Inc. | 10 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-11-12 | 1471.60 | Deviate (5 - 79 degrees) |
2012-11-13 | 2056.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-12-01 | Open Hole/Barefoot Completion | 3473.00 | 3478.00 | 0 |
2012-12-04 | Multi-Stage Fracture | 2818.80 | 2818.90 | 0 |
2012-12-04 | Multi-Stage Fracture | 2746.80 | 2746.90 | 0 |
2012-12-04 | Multi-Stage Fracture | 2662.00 | 2662.10 | 0 |
2012-12-04 | Multi-Stage Fracture | 2590.10 | 2590.20 | 0 |
2012-12-04 | Multi-Stage Fracture | 2502.80 | 2502.90 | 0 |
2012-12-04 | Multi-Stage Fracture | 2429.40 | 2429.50 | 0 |
2012-12-04 | Multi-Stage Fracture | 2344.40 | 2344.50 | 0 |
2012-12-04 | Multi-Stage Fracture | 2269.80 | 2269.90 | 0 |
2012-12-04 | Multi-Stage Fracture | 2183.50 | 2183.60 | 0 |
2012-12-01 | Multi-Stage Fracture | 3448.60 | 3448.70 | 0 |
2012-12-01 | Multi-Stage Fracture | 3383.00 | 3383.10 | 0 |
2012-12-02 | Multi-Stage Fracture | 3295.20 | 3295.30 | 0 |
2012-12-02 | Multi-Stage Fracture | 3208.90 | 3209.00 | 0 |
2012-12-02 | Multi-Stage Fracture | 3136.50 | 3136.60 | 0 |
2012-12-03 | Multi-Stage Fracture | 3052.40 | 3052.50 | 0 |
2012-12-03 | Multi-Stage Fracture | 2982.90 | 2983.00 | 0 |
2012-12-04 | Multi-Stage Fracture | 2901.20 | 2901.30 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 685 | 0.0 | 0.0 | 0.0 |
2013 | 7008 | 0.0 | 0.0 | 0.0 |
2014 | 8665 | 0.0 | 0.0 | 0.0 |
2015 | 8399 | 0.0 | 0.0 | 0.0 |
2016 | 8735 | 0.0 | 0.0 | 0.0 |
2017 | 8123 | 0.0 | 0.0 | 0.0 |
2018 | 8545 | 0.0 | 0.0 | 0.0 |
2019 | 8547 | 0.0 | 0.0 | 0.0 |
2020 | 2039 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-11-18 | Lost Circulation | 800.00 | 3473.00 |
2012-12-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]