If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0435091001000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.699223,"lon":-115.216083,"icon":""}]} |
Location: 00/01-10-043-09W5/0 | |
Location Alias: 00/01-10-43-09 W5M | |
Location Alias 2: 00/01-10-043-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 5 | |
Range: 09 | |
Section: 10 | |
County/Municipality: Clearwater County | |
Well Name: SHANGHAIEN WILLGR 1-10-43-9 | |
Operator Name: Shanghai Energy Corporation | |
License Number: 0445982 | |
License Date: 2012-05-18 | |
License Status: Amended | |
Spud Date: 2012-09-30 | |
Final Drill Date: 2012-10-24 | |
Well Total Depth: 3578.00 m | |
Surface Hole Latitude: 52.699223 | |
Surface Hole Longitude: -115.216083 |
Date | Event |
---|---|
2012-05-18 | Obtained License |
2012-10-02 | Surface Casing Operation Performed |
2012-10-04 | Lost Circulation Occurred |
2012-10-06 | Direction Drilling Operation Performed - Deviate |
2012-10-09 | Direction Drilling Operation Performed - Horizontal |
2012-10-09 | Lost Circulation Occurred |
2012-10-10 | Well Log Performed |
2012-10-11 | Intermediate Casing Operation Performed |
2012-10-12 | Well Log Performed |
2012-10-24 | Finished Drilling |
2012-10-24 | Well Log Performed |
2012-10-24 | Well Mode changed to Drilled and Cased |
2012-10-26 | Liner Casing Operation Performed |
2012-10-27 | Rig Released |
2012-11-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-09 | Perforation Treatment Performed - Open-Hole Completion |
2012-11-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-10 | Well Began Production |
2012-11-10 | Well Fluid changed to Crude Oil |
2012-11-10 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-09-30 | Beaver Drilling Ltd. | 10 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-10-06 | 1743.40 | Deviate (5 - 79 degrees) |
2012-10-09 | 2195.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-11-09 | Open Hole/Barefoot Completion | 3573.00 | 3578.00 | 0 |
2012-11-10 | Multi-Stage Fracture | 2907.80 | 2907.90 | 0 |
2012-11-10 | Multi-Stage Fracture | 2826.20 | 2826.30 | 0 |
2012-11-10 | Multi-Stage Fracture | 2745.30 | 2745.40 | 0 |
2012-11-10 | Multi-Stage Fracture | 2664.40 | 2664.50 | 0 |
2012-11-10 | Multi-Stage Fracture | 2583.10 | 2583.20 | 0 |
2012-11-10 | Multi-Stage Fracture | 2488.90 | 2489.00 | 0 |
2012-11-10 | Multi-Stage Fracture | 2405.20 | 2405.30 | 0 |
2012-11-10 | Multi-Stage Fracture | 2334.30 | 2334.40 | 0 |
2012-11-09 | Multi-Stage Fracture | 3563.80 | 3563.90 | 0 |
2012-11-09 | Multi-Stage Fracture | 3488.50 | 3488.60 | 0 |
2012-11-09 | Multi-Stage Fracture | 3419.80 | 3419.90 | 0 |
2012-11-09 | Multi-Stage Fracture | 3338.60 | 3338.70 | 0 |
2012-11-09 | Multi-Stage Fracture | 3257.70 | 3257.80 | 0 |
2012-11-09 | Multi-Stage Fracture | 3151.70 | 3151.80 | 0 |
2012-11-09 | Multi-Stage Fracture | 3070.40 | 3070.50 | 0 |
2012-11-09 | Multi-Stage Fracture | 2976.10 | 2976.20 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1270 | 0.0 | 0.0 | 0.0 |
2013 | 8479 | 0.0 | 0.0 | 0.0 |
2014 | 8520 | 0.0 | 0.0 | 0.0 |
2015 | 5016 | 0.0 | 0.0 | 0.0 |
2016 | 8591 | 0.0 | 0.0 | 0.0 |
2017 | 8208 | 0.0 | 0.0 | 0.0 |
2018 | 7560 | 0.0 | 0.0 | 0.0 |
2019 | 5256 | 0.0 | 0.0 | 0.0 |
2020 | 1920 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-04 | Lost Circulation | 1188.00 | 1653.00 |
2012-10-09 | Lost Circulation | 2234.00 | 2277.00 |
2012-11-13 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]