X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435091002000

Well Details

Well ID: 0435091002000
Loading map...
Location: 00/02-10-043-09W5/0
Location Alias: 00/02-10-43-09 W5M
Location Alias 2: 00/02-10-043-09 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 09
Section: 10
County/Municipality: Clearwater County
Well Name: SHANGHAIEN WILLGR 2-10-43-9
Operator Name: Shanghai Energy Corporation
License Number: 0458960
License Date: 2013-08-29
License Status: Issued
Spud Date: 2013-09-17
Final Drill Date: 2013-10-04
Well Total Depth: 3589.00 m
Surface Hole Latitude: 52.699201
Surface Hole Longitude: -115.216452

For data sources see[1][2]

Well History

Date Event
2013-08-29 Obtained License
2013-09-20 Surface Casing Operation Performed
2013-09-24 Direction Drilling Operation Performed - Deviate
2013-09-25 Direction Drilling Operation Performed - Horizontal
2013-09-25 Well Log Performed
2013-09-27 Intermediate Casing Operation Performed
2013-09-27 Lost Circulation Occurred
2013-10-04 Finished Drilling
2013-10-04 Well Log Performed
2013-10-04 Well Mode changed to Drilled and Cased
2013-10-06 Well Log Performed
2013-10-07 Liner Casing Operation Performed
2013-10-07 Rig Released
2013-10-18 Perforation Treatment Performed - Multi-Stage Fracture
2013-10-18 Perforation Treatment Performed - Open-Hole Completion
2013-10-19 Well Began Production
2013-10-19 Well Fluid changed to Crude Oil
2013-10-19 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-09-17 Beaver Drilling Ltd. 4 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-09-24 1810.00 Deviate (5 - 79 degrees)
2013-09-25 2157.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-10-18 Open Hole/Barefoot Completion 3584.00 3589.00 0
2013-10-18 Multi-Stage Fracture 2960.70 2960.80 0
2013-10-18 Multi-Stage Fracture 2875.50 2875.60 0
2013-10-18 Multi-Stage Fracture 2803.70 2803.80 0
2013-10-18 Multi-Stage Fracture 2718.70 2718.80 0
2013-10-18 Multi-Stage Fracture 2647.00 2647.10 0
2013-10-18 Multi-Stage Fracture 2561.80 2561.90 0
2013-10-18 Multi-Stage Fracture 2503.40 2503.50 0
2013-10-18 Multi-Stage Fracture 2431.80 2431.90 0
2013-10-18 Multi-Stage Fracture 2333.40 2333.50 0
2013-10-18 Multi-Stage Fracture 2261.90 2262.00 0
2013-10-18 Multi-Stage Fracture 3561.80 3561.90 0
2013-10-18 Multi-Stage Fracture 3498.20 3498.30 0
2013-10-18 Multi-Stage Fracture 3416.00 3416.10 0
2013-10-18 Multi-Stage Fracture 3346.00 3346.10 0
2013-10-18 Multi-Stage Fracture 3261.10 3261.20 0
2013-10-18 Multi-Stage Fracture 3175.90 3176.00 0
2013-10-18 Multi-Stage Fracture 3117.60 3117.70 0
2013-10-18 Multi-Stage Fracture 3032.40 3032.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-10-18 2013-10-18 2,065 3,352 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 89.0899 N/A
Sand (20/40) Trican silica crystalline 14808-60-7 100 3.025 N/A
Sand (30/50) Trican silica crystalline 14808-60-7 100 5.1105 N/A
Sand (40/70) Trican silica crystalline 14808-60-7 100 2.5487 N/A
Sand (50/140) Trican silica crystalline 14808-60-7 100 0.517 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0152 N/A
dibromoacetonitrile 3252-43-5 100 0.0152 N/A
non-hazardous ingredients Not Available 100 0.0152 N/A
polyethylene glycol 25322-68-3 100 0.0152 N/A
sodium bromide 7647-15-6 100 0.0152 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0186 N/A
CC-77 Trican Clay Control 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide 7744 100 0.174 N/A
non-hazardous ingredients Not Available 100 0.174 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0602 N/A
propylene glycol 57-55-6 100 0.0602 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.1125 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1126 N/A
non-hazardous ingredients Not Available 100 0.1126 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-09-27 2013-10-17 Surface Water - Runoff 3540

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 1650 0.0 0.0 0.0
2014 8674 0.0 0.0 0.0
2015 5305 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 8712 0.0 0.0 0.0
2018 8735 0.0 0.0 0.0
2019 7991 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-09-27 Lost Circulation 2221.00 2221.00
2013-10-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References