If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0435092002000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.729668,"lon":-115.264389,"icon":""}]} |
Location: 00/02-20-043-09W5/0 | |
Location Alias: 00/02-20-43-09 W5M | |
Location Alias 2: 00/02-20-043-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 5 | |
Range: 09 | |
Section: 20 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA HZ WILLGR 2-20-43-9 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0473410 | |
License Date: 2014-12-17 | |
License Status: Amended | |
Spud Date: 2015-06-07 | |
Final Drill Date: 2015-06-18 | |
Well Total Depth: 3719.00 m | |
Surface Hole Latitude: 52.729668 | |
Surface Hole Longitude: -115.264389 |
Date | Event |
---|---|
2014-12-17 | Obtained License |
2015-06-08 | Surface Casing Operation Performed |
2015-06-11 | Well Log Performed |
2015-06-12 | Direction Drilling Operation Performed - Deviate |
2015-06-14 | Direction Drilling Operation Performed - Horizontal |
2015-06-18 | Finished Drilling |
2015-06-18 | Well Log Performed |
2015-06-18 | Well Mode changed to Drilled and Cased |
2015-06-20 | Production Casing Operation Performed |
2015-06-20 | Rig Released |
2015-12-02 | Well Log Performed |
2015-12-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-12-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-12-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-12-15 | Well Log Performed |
2016-01-25 | Well Began Production |
2016-01-25 | Well Fluid changed to Crude Oil |
2016-01-25 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-06-07 | Trinidad Drilling Ltd. | 53 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-06-12 | 1704.70 | Deviate (5 - 79 degrees) |
2015-06-14 | 2283.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-12-06 | Multi-Stage Fracture | 3687.70 | 3689.60 | 0 |
2015-12-07 | Multi-Stage Fracture | 3311.00 | 3312.90 | 0 |
2015-12-07 | Multi-Stage Fracture | 3267.30 | 3269.20 | 0 |
2015-12-07 | Multi-Stage Fracture | 3223.60 | 3225.50 | 0 |
2015-12-07 | Multi-Stage Fracture | 3180.30 | 3182.20 | 0 |
2015-12-07 | Multi-Stage Fracture | 3137.30 | 3139.20 | 0 |
2015-12-07 | Multi-Stage Fracture | 3093.90 | 3095.80 | 0 |
2015-12-07 | Multi-Stage Fracture | 3050.40 | 3052.30 | 0 |
2015-12-07 | Multi-Stage Fracture | 3007.00 | 3008.90 | 0 |
2015-12-07 | Multi-Stage Fracture | 2963.50 | 2965.40 | 0 |
2015-12-08 | Multi-Stage Fracture | 2920.10 | 2922.00 | 0 |
2015-12-06 | Multi-Stage Fracture | 3657.50 | 3659.40 | 0 |
2015-12-08 | Multi-Stage Fracture | 2877.00 | 2878.90 | 0 |
2015-12-08 | Multi-Stage Fracture | 2833.60 | 2835.50 | 0 |
2015-12-08 | Multi-Stage Fracture | 2790.00 | 2791.90 | 0 |
2015-12-08 | Multi-Stage Fracture | 2746.30 | 2748.20 | 0 |
2015-12-08 | Multi-Stage Fracture | 2702.40 | 2704.30 | 0 |
2015-12-08 | Multi-Stage Fracture | 2658.60 | 2660.50 | 0 |
2015-12-08 | Multi-Stage Fracture | 2601.70 | 2603.60 | 0 |
2015-12-08 | Multi-Stage Fracture | 2545.00 | 2546.90 | 0 |
2015-12-08 | Multi-Stage Fracture | 2488.30 | 2490.20 | 0 |
2015-12-08 | Multi-Stage Fracture | 2432.20 | 2434.10 | 0 |
2015-12-06 | Multi-Stage Fracture | 3614.10 | 3616.00 | 0 |
2015-12-08 | Multi-Stage Fracture | 2375.60 | 2377.50 | 0 |
2015-12-08 | Multi-Stage Fracture | 2331.70 | 2333.60 | 0 |
2015-12-06 | Multi-Stage Fracture | 3570.60 | 3572.50 | 0 |
2015-12-07 | Multi-Stage Fracture | 3528.00 | 3529.90 | 0 |
2015-12-07 | Multi-Stage Fracture | 3484.50 | 3486.40 | 0 |
2015-12-07 | Multi-Stage Fracture | 3440.90 | 3442.80 | 0 |
2015-12-07 | Multi-Stage Fracture | 3397.80 | 3399.70 | 0 |
2015-12-07 | Multi-Stage Fracture | 3354.50 | 3356.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-12-06 | 2015-12-08 | 2,108 | 3,124 | N/A |
2 | 2015-12-07 | 2015-12-08 | 2,108 | 0 | N/A |
3 | 2015-12-06 | 2015-12-06 | 2,108 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 88.6057 | N/A | |||
20/40 | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 7.6244 | N/A | ||
30/50 | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 4.3609 | N/A | ||
40/70 | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 0.6105 | N/A | ||
Econocide B1008 | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.012 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.012 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.012 | N/A | ||||
SCS-1 | Step Energy Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.1443 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.1443 | N/A | ||||
SNE-2 | Step Energy Services | Demulsifier | Glycerine | 56-81-5 | 100 | 0.0583 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0583 | N/A | ||||
Propylene Glycol | 57-55-6 | 100 | 0.0583 | N/A | ||||
SFR-101 | Step Energy Services | Friction Reducer | Ammonium Chloride | 12125-02-9 | 100 | 0.0907 | N/A | |
Distillates (petroleum) hydrotreated light | 64742-47-8 | 100 | 0.0907 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0907 | N/A | ||||
SWG-101L | Step Energy Services | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.0804 | N/A | |
Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.0804 | N/A | ||||
2 | SBO-3 | Step Energy Services | Breaker | Persulfate compounds | 7727-54-0 | 100 | 0.0043 | N/A |
3 | SML-1 | Step Energy Services | Friction Reducer | Non-Hazardous Ingredients | Not Available | 100 | 0.0507 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-11-25 | 2015-12-05 | Surface Water - Lake | 3300 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 7624 | 0.0 | 0.0 | 0.0 |
2017 | 8550 | 0.0 | 0.0 | 0.0 |
2018 | 6965 | 0.0 | 0.0 | 0.0 |
2019 | 8390 | 0.0 | 0.0 | 0.0 |
2020 | 2134 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-06-20 | No Incident Encountered | 0.00 | 0.00 |
2015-12-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]