If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0435092913000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.739543,"lon":-115.278986,"icon":""}]} |
Location: 00/13-29-043-09W5/0 | |
Location Alias: 00/13-29-43-09 W5M | |
Location Alias 2: 00/13-29-043-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 5 | |
Range: 09 | |
Section: 29 | |
County/Municipality: Clearwater County | |
Well Name: CALPINE WILLGR 13-29-43-9 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0252589 | |
License Date: 2001-03-06 | |
License Status: Abandoned | |
Spud Date: 2001-03-15 | |
Final Drill Date: 2001-04-16 | |
Well Total Depth: 2978.00 m | |
Surface Hole Latitude: 52.739543 | |
Surface Hole Longitude: -115.278986 |
Date | Event |
---|---|
2001-03-06 | Obtained License |
2001-03-18 | Surface Casing Operation Performed |
2001-03-20 | Lost Circulation Occurred |
2001-03-29 | Lost Circulation Occurred |
2001-04-02 | Direction Drilling Operation Performed - Deviate |
2001-04-07 | Well Log Performed |
2001-04-08 | Lost Circulation Occurred |
2001-04-09 | Intermediate Casing Operation Performed |
2001-04-16 | Finished Drilling |
2001-04-16 | Well Log Performed |
2001-04-17 | Liner Casing Operation Performed |
2001-04-18 | Rig Released |
2001-04-18 | Well Mode changed to Drilled and Cased |
2001-05-04 | Well Log Performed |
2001-05-06 | Perforation Treatment Performed - Jet Perforation |
2001-05-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-05-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-05-10 | Well Log Performed |
2001-05-12 | Perforation Treatment Performed - Jet Perforation |
2001-05-14 | Perforation Treatment Performed - Jet Perforation |
2001-05-14 | Well Log Performed |
2001-05-16 | Perforation Treatment Performed - Jet Perforation |
2001-05-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-05-22 | Plug Back Performed |
2001-05-22 | Well Mode changed to Abandoned Zone |
2001-05-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-05-23 | Perforation Treatment Performed - Jet Perforation |
2001-05-23 | Well Log Performed |
2001-05-24 | Perforation Treatment Performed - Jet Perforation |
2001-05-25 | Perforation Treatment Performed - Cement Squeeze |
2001-05-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-05-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-05-27 | Perforation Treatment Performed - Jet Perforation |
2001-05-27 | Plug Back Performed |
2001-06-07 | Well Log Performed |
2001-06-08 | Perforation Treatment Performed - Jet Perforation |
2001-06-09 | Perforation Treatment Performed - Cement Squeeze |
2001-06-11 | Perforation Treatment Performed - Jet Perforation |
2001-06-11 | Well Log Performed |
2001-06-12 | Perforation Treatment Performed - Fractured |
2002-09-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-09-16 | Plug Back Performed |
2002-09-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-09-17 | Plug Back Performed |
2002-09-17 | Well Log Performed |
2002-09-18 | Well Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2001-04-02 | 2266.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-05-06 | Perforation | 2955.00 | 2962.00 | 20 |
2001-05-24 | Perforation | 2830.70 | 2831.00 | 17 |
2001-05-25 | Cement Squeeze | 2830.70 | 2845.30 | 0 |
2001-05-27 | Perforation | 2828.50 | 2831.00 | 16 |
2001-05-27 | Acid Treatment | 2828.50 | 2831.00 | 0 |
2001-05-27 | Packing Device Capped w/Cement | 2815.00 | 2823.00 | 0 |
2001-06-08 | Perforation | 2750.00 | 2750.30 | 72 |
2001-06-09 | Cement Squeeze | 2750.00 | 2750.30 | 0 |
2001-06-11 | Perforation | 2729.00 | 2730.50 | 20 |
2001-06-12 | Fracture | 2729.00 | 2730.50 | 0 |
2002-09-16 | Packing Device Capped w/Cement | 2709.00 | 2717.00 | 0 |
2001-05-08 | Acid Treatment | 2955.00 | 2962.00 | 0 |
2002-09-17 | Packing Device Capped w/Cement | 2687.00 | 2695.00 | 0 |
2001-05-10 | Packing Device Capped w/Cement | 2946.00 | 2949.00 | 0 |
2001-05-12 | Perforation | 2935.00 | 2936.50 | 16 |
2001-05-14 | Perforation | 2917.50 | 2920.00 | 17 |
2001-05-16 | Perforation | 2908.50 | 2912.00 | 17 |
2001-05-22 | Packing Device Capped w/Cement | 2897.00 | 2905.00 | 0 |
2001-05-23 | Perforation | 2845.00 | 2845.30 | 70 |
2001-05-23 | Acid Treatment | 2845.00 | 2845.30 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2001-03-20 | Lost Circulation | 951.00 | 1202.00 |
2001-03-29 | Lost Circulation | 1985.00 | 2056.00 |
2001-04-08 | Lost Circulation | 1475.00 | 1980.00 |
For data sources see[6]