If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0444021210002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.780555,"lon":-110.155143,"icon":""}]} |
Location: 00/10-12-044-02W4/2 | |
Location Alias: 00/10-12-44-02 W4M | |
Location Alias 2: 00/10-12-044-02 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 4 | |
Range: 02 | |
Section: 12 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: JOFFRE LADUBORO CHAUV 10-12-44-2 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0079392 | |
License Date: 1979-11-21 | |
License Status: Issued | |
Spud Date: 1979-12-20 | |
Final Drill Date: 1979-12-31 | |
Well Total Depth: 720.00 m | |
Surface Hole Latitude: 52.780555 | |
Surface Hole Longitude: -110.155143 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-11-21 | Obtained License |
1979-12-31 | Finished Drilling |
1979-12-31 | Well Mode changed to Drilled and Cased |
1980-01-01 | Drill Stem Test Performed |
1980-01-02 | Production Casing Operation Performed |
1980-02-22 | Perforation Treatment Performed - Jet Perforation |
1980-02-25 | Perforation Treatment Performed - Fractured |
1980-06-21 | Perforation Treatment Performed - Cement Squeeze |
1980-06-23 | Perforation Treatment Performed - Jet Perforation |
1980-06-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2005-09-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-09-07 | Perforation Treatment Performed - Jet Perforation |
2005-09-07 | Plug Back Performed |
2005-09-14 | Perforation Treatment Performed - Jet Perforation |
2005-09-25 | Perforation Treatment Performed - Fractured |
2005-10-01 | Well Began Production |
2005-10-01 | Well Fluid changed to Gas |
2005-10-01 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-02-22 | Perforation | 555.50 | 565.00 | 7 |
1980-02-25 | Fracture | 555.50 | 565.00 | 0 |
1980-06-21 | Cement Squeeze | 555.50 | 565.00 | 13 |
1980-06-23 | Perforation | 555.00 | 557.50 | 13 |
1980-06-24 | Acid Treatment | 555.00 | 557.50 | 0 |
2005-09-07 | Packing Device Capped w/Cement | 541.00 | 549.00 | 0 |
2005-09-07 | Perforation | 516.50 | 518.50 | 13 |
2005-09-14 | Perforation | 472.50 | 476.50 | 13 |
2005-09-25 | Fracture | 472.50 | 476.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 1632 | 0.0 | 0.0 | 0.0 |
2006 | 8735 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8757 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8660 | 0.0 | 0.0 | 0.0 |
2016 | 8310 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8732 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]