X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444042106000

Well Details

Well ID: 0444042106000
Loading map...
Location: 00/06-21-044-04W4/0
Location Alias: 00/06-21-44-04 W4M
Location Alias 2: 00/06-21-044-04 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 04
Section: 21
County/Municipality: Municipal District of Wainwright No. 61
Well Name: BVI EDGERTON 6-21-44-4
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0108185
License Date: 1984-07-12
License Status: RecCertified
Spud Date: 1984-07-14
Final Drill Date: 1984-07-16
Well Total Depth: 725.00 m
Surface Hole Latitude: 52.806097
Surface Hole Longitude: -110.528992

For data sources see[1][2]

Well History

Date Event
1984-07-12 Obtained License
1984-07-14 Surface Casing Operation Performed
1984-07-16 Finished Drilling
1984-07-16 Well Mode changed to Drilled and Cased
1984-07-17 Well Log Performed
1984-07-18 Drill Stem Test Performed
1984-07-19 Drill Stem Test Performed
1984-07-20 Drill Stem Test Performed
1984-07-21 Production Casing Operation Performed
1984-07-22 Rig Released
1984-07-25 Well Log Performed
1984-07-31 Perforation Treatment Performed - Jet Perforation
1984-07-31 Well Log Performed
1984-09-22 Perforation Treatment Performed - Fractured
1984-10-01 Well Began Production
1984-10-01 Well Fluid changed to Crude Oil
1984-10-01 Well Mode changed to Flowing
1985-11-23 Well Fluid changed to Crude Oil
1985-11-23 Well Mode changed to Pumping
2002-07-31 Well Fluid changed to Crude Oil
2002-07-31 Well Mode changed to Suspended
2004-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-06-08 Perforation Treatment Performed - Jet Perforation
2004-06-08 Plug Back Performed
2004-06-08 Well Log Performed
2004-06-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-06-09 Perforation Treatment Performed - Jet Perforation
2004-06-09 Plug Back Performed
2012-09-13 Perforation Treatment Performed - Cement Squeeze
2012-09-13 Plug Back Performed
2012-09-20 Perforation Treatment Performed - Jet Perforation
2012-09-21 Perforation Treatment Performed - Remedial Casing
2012-09-25 Perforation Treatment Performed - Jet Perforation
2012-09-25 Well Log Performed
2012-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-26 Perforation Treatment Performed - Remedial Casing
2012-09-26 Plug Back Performed
2013-08-24 Perforation Treatment Performed - Jet Perforation
2013-08-26 Perforation Treatment Performed - Jet Perforation
2013-10-23 Perforation Treatment Performed - Jet Perforation
2013-10-23 Perforation Treatment Performed - Remedial Casing
2013-10-23 Well Log Performed
2013-10-24 Perforation Treatment Performed - Cement Plug
2014-05-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-05-08 Plug Back Performed
2014-05-08 Well Fluid changed to Crude Oil
2014-05-08 Well Log Performed
2014-05-08 Well Mode changed to Abandoned Zone
2014-05-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-07-31 Perforation 643.50 652.50 13
2012-09-20 Perforation 361.00 366.00 20
2012-09-21 Remedial Casing Cementing 361.00 366.00 0
2012-09-25 Perforation 251.50 253.00 20
2012-09-26 Remedial Casing Cementing 251.50 253.00 0
2012-09-26 Packing Device Capped w/Cement 214.00 243.00 0
2013-08-24 Perforation 251.50 253.00 1
2013-08-26 Perforation 361.00 366.00 1
2013-10-23 Perforation 455.00 459.00 1
2013-10-23 Remedial Casing Cementing 455.00 459.00 0
2013-10-23 Remedial Casing Cementing 361.00 366.00 0
1984-09-22 Fracture 643.50 652.50 0
2013-10-23 Remedial Casing Cementing 251.50 253.00 0
2013-10-24 Cement Plug 445.00 455.00 0
2014-05-08 Packing Device Capped w/Cement 342.00 350.00 0
2014-05-08 Packing Device Capped w/Cement 234.00 242.00 0
2004-06-08 Packing Device Capped w/Cement 629.00 638.00 0
2004-06-08 Perforation 589.00 591.00 17
2004-06-09 Packing Device Capped w/Cement 575.00 584.00 0
2004-06-09 Perforation 552.00 553.50 17
2004-06-09 Perforation 547.00 549.00 17
2012-09-13 Cement Squeeze 552.00 553.50 0
2012-09-13 Cement Squeeze 547.00 549.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1948 0.0 0.0 0.0
1985 8655 0.0 0.0 0.0
1986 6063 0.0 0.0 0.0
1987 8687 0.0 0.0 0.0
1988 8674 0.0 0.0 0.0
1989 7251 0.0 0.0 0.0
1990 7989 0.0 0.0 0.0
1991 2080 0.0 0.0 0.0
1992 4165 0.0 0.0 0.0
1993 4272 0.0 0.0 0.0
1994 2928 0.0 0.0 0.0
1995 4943 0.0 0.0 0.0
1996 3624 0.0 0.0 0.0
1997 6460 0.0 0.0 0.0
1998 8039 0.0 0.0 0.0
1999 6432 0.0 0.0 0.0
2000 6820 0.0 0.0 0.0
2001 7679 0.0 0.0 0.0
2002 24 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2004-06-11 No Incident Encountered 0.00 0.00
2004-06-11 No Incident Encountered 0.00 0.00
2004-06-11 No Incident Encountered 0.00 0.00
2012-09-26 No Incident Encountered 0.00 0.00
2013-12-09 No Incident Encountered 0.00 0.00
2014-05-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References