If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0444060611000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.766385,"lon":-110.866601,"icon":""}]} |
Location: 00/11-06-044-06W4/0 | |
Location Alias: 00/11-06-44-06 W4M | |
Location Alias 2: 00/11-06-044-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 4 | |
Range: 06 | |
Section: 06 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: CLEO ENERGY WAINWR 11-6-44-6 | |
Operator Name: Cleo Energy Corp. | |
License Number: 0070022 | |
License Date: 1978-06-08 | |
License Status: Issued | |
Spud Date: 1978-06-22 | |
Final Drill Date: 1978-06-25 | |
Well Total Depth: 725.40 m | |
Surface Hole Latitude: 52.766385 | |
Surface Hole Longitude: -110.866601 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-06-08 | Obtained License |
1978-06-25 | Finished Drilling |
1978-06-26 | Drill Stem Test Performed |
1978-06-27 | Production Casing Operation Performed |
1978-08-01 | Well Mode changed to Drilled and Cased |
1983-12-02 | Perforation Treatment Performed - Jet Perforation |
1985-03-05 | Well Began Production |
1985-03-05 | Well Fluid changed to Gas |
1985-03-05 | Well Mode changed to Flowing |
1993-03-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-03-03 | Plug Back Performed |
1993-03-03 | Well Fluid changed to Gas |
1993-03-03 | Well Mode changed to Abandoned Zone |
1993-03-04 | Perforation Treatment Performed - Jet Perforation |
1993-03-04 | Well Log Performed |
1993-03-05 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-12-02 | Perforation | 645.60 | 647.70 | 15 |
1993-03-03 | Packing Device Capped w/Cement | 632.00 | 640.00 | 0 |
1993-03-04 | Perforation | 598.60 | 602.90 | 13 |
1993-03-04 | Perforation | 605.30 | 607.80 | 13 |
1993-03-05 | Perforation | 590.70 | 591.90 | 13 |
1993-03-05 | Perforation | 594.40 | 596.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 7000 | 0.0 | 0.0 | 0.0 |
1986 | 8468 | 0.0 | 0.0 | 0.0 |
1987 | 7805 | 0.0 | 0.0 | 0.0 |
1988 | 7681 | 0.0 | 0.0 | 0.0 |
1989 | 8141 | 0.0 | 0.0 | 0.0 |
1990 | 6506 | 0.0 | 0.0 | 0.0 |
1991 | 7922 | 0.0 | 0.0 | 0.0 |
1992 | 8105 | 0.0 | 0.0 | 0.0 |
1993 | 1270 | 0.0 | 0.0 | 0.0 |
For data sources see[5]