If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0444082712000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.82261,"lon":-111.09323,"icon":""}]} |
Location: 00/12-27-044-08W4/0 | |
Location Alias: 00/12-27-44-08 W4M | |
Location Alias 2: 00/12-27-044-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 4 | |
Range: 08 | |
Section: 27 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: CLEO ENERGY KILLAM 12-27-44-8 | |
Operator Name: Cleo Energy Corp. | |
License Number: 0223729 | |
License Date: 1999-06-17 | |
License Status: Amended | |
Spud Date: 1999-06-20 | |
Final Drill Date: 1999-07-27 | |
Well Total Depth: 792.00 m | |
Surface Hole Latitude: 52.822610 | |
Surface Hole Longitude: -111.093230 |
Date | Event |
---|---|
1999-06-17 | Obtained License |
1999-07-18 | Surface Casing Operation Performed |
1999-07-24 | Direction Drilling Operation Performed - Deviate |
1999-07-25 | Well Log Performed |
1999-07-26 | Intermediate Casing Operation Performed |
1999-07-26 | Well Log Performed |
1999-07-27 | Finished Drilling |
1999-07-28 | Production Casing Operation Performed |
1999-07-28 | Well Log Performed |
1999-07-29 | Rig Released |
1999-07-29 | Well Mode changed to Drilled and Cased |
1999-08-04 | Perforation Treatment Performed - Jet Perforation |
1999-08-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-08-08 | Perforation Treatment Performed - Jet Perforation |
1999-08-08 | Well Log Performed |
1999-08-09 | Well Log Performed |
1999-08-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-08-10 | Perforation Treatment Performed - Jet Perforation |
1999-08-10 | Plug Back Performed |
1999-08-10 | Well Log Performed |
1999-08-10 | Well Mode changed to Drilled and Cased |
1999-09-03 | Well Began Production |
1999-09-03 | Well Fluid changed to Gas |
1999-09-03 | Well Mode changed to Flowing |
1999-09-04 | Well Fluid changed to Gas |
1999-09-04 | Well Log Performed |
1999-09-04 | Well Mode changed to Flowing |
2004-05-30 | Well Fluid changed to Gas |
2004-05-30 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1999-07-24 | 174.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-08-04 | Perforation | 765.40 | 767.50 | 17 |
1999-08-05 | Acid Treatment | 765.40 | 767.50 | 0 |
1999-08-08 | Perforation | 755.00 | 756.20 | 17 |
1999-08-10 | Packing Device Capped w/Cement | 761.00 | 762.00 | 0 |
1999-08-10 | Perforation | 637.80 | 638.80 | 17 |
1999-08-10 | Perforation | 640.40 | 641.30 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 2332 | 0.0 | 0.0 | 0.0 |
2000 | 8632 | 0.0 | 0.0 | 0.0 |
2001 | 8758 | 0.0 | 0.0 | 0.0 |
2002 | 7549 | 0.0 | 0.0 | 0.0 |
2003 | 224 | 0.0 | 0.0 | 0.0 |
2004 | 67 | 0.0 | 0.0 | 0.0 |
For data sources see[6]