If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0444180616003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.767741,"lon":-112.596907,"icon":""}]} |
Location: 00/16-06-044-18W4/3 | |
Location Alias: 00/16-06-44-18 W4M | |
Location Alias 2: 00/16-06-044-18 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 4 | |
Range: 18 | |
Section: 06 | |
County/Municipality: Camrose County | |
Well Name: EMBER KELSEY 16-6-44-18 | |
Operator Name: Ember Resources Inc. | |
License Number: 0102634 | |
License Date: 1983-08-09 | |
License Status: RecCertified | |
Spud Date: 1983-08-14 | |
Final Drill Date: 1983-08-21 | |
Well Total Depth: 964.00 m | |
Surface Hole Latitude: 52.767741 | |
Surface Hole Longitude: -112.596907 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1983-08-09 | Obtained License |
1983-08-21 | Finished Drilling |
1983-08-21 | Well Mode changed to Drilled and Cased |
1983-08-22 | Drill Stem Test Performed |
1983-08-23 | Drill Stem Test Performed |
1983-08-23 | Production Casing Operation Performed |
1983-09-06 | Perforation Treatment Performed - Jet Perforation |
1983-09-07 | Perforation Treatment Performed - Fractured |
1983-09-11 | Perforation Treatment Performed - Jet Perforation |
1983-09-14 | Perforation Treatment Performed - Fractured |
1996-08-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-08-11 | Perforation Treatment Performed - Jet Perforation |
1996-08-11 | Plug Back Performed |
1996-08-11 | Well Log Performed |
1996-08-12 | Perforation Treatment Performed - Jet Perforation |
1996-08-17 | Well Began Production |
1996-08-17 | Well Fluid changed to Gas |
1996-08-17 | Well Mode changed to Flowing |
1997-09-18 | Well Fluid changed to Gas |
1997-09-18 | Well Mode changed to Suspended |
2006-05-13 | Well Log Performed |
2006-05-14 | Well Log Performed |
2006-05-16 | Well Log Performed |
2006-05-17 | Well Log Performed |
2006-09-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-09-08 | Perforation Treatment Performed - Jet Perforation |
2006-09-08 | Plug Back Performed |
2006-09-08 | Well Fluid changed to Gas |
2006-09-08 | Well Mode changed to Abandoned Zone |
2006-09-09 | Perforation Treatment Performed - Cement Squeeze |
2006-09-09 | Plug Back Performed |
2006-11-04 | Perforation Treatment Performed - Jet Perforation |
2007-01-07 | Perforation Treatment Performed - Jet Perforation |
2008-05-20 | Perforation Treatment Performed - Cement Squeeze |
2008-05-20 | Plug Back Performed |
2008-05-29 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-09-06 | Perforation | 921.00 | 922.50 | 10 |
2006-09-08 | Packing Device Capped w/Cement | 310.00 | 318.00 | 0 |
2006-09-08 | Perforation | 289.00 | 290.00 | 12 |
2006-09-09 | Cement Squeeze | 289.00 | 290.00 | 0 |
2006-11-04 | Perforation | 259.00 | 260.00 | 12 |
2007-01-07 | Perforation | 240.00 | 241.00 | 17 |
2008-05-20 | Cement Squeeze | 259.00 | 260.00 | 0 |
2008-05-20 | Cement Squeeze | 240.00 | 241.00 | 0 |
1983-09-07 | Fracture | 921.00 | 922.50 | 0 |
1983-09-11 | Perforation | 906.00 | 908.00 | 10 |
1983-09-14 | Fracture | 906.00 | 908.00 | 0 |
1996-08-11 | Packing Device Capped w/Cement | 909.80 | 913.80 | 0 |
1996-08-11 | Packing Device Capped w/Cement | 895.00 | 903.00 | 0 |
1996-08-11 | Perforation | 403.00 | 406.00 | 18 |
1996-08-12 | Perforation | 322.50 | 324.00 | 18 |
1996-08-12 | Perforation | 325.00 | 326.50 | 18 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 715 | 0.0 | 0.0 | 0.0 |
For data sources see[5]