If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0444182510002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.824992,"lon":-112.479031,"icon":""}]} |
Location: 00/10-25-044-18W4/2 | |
Location Alias: 00/10-25-44-18 W4M | |
Location Alias 2: 00/10-25-044-18 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 4 | |
Range: 18 | |
Section: 25 | |
County/Municipality: Camrose County | |
Well Name: SCEPTRE ET AL HOLMBERG 10-25-44-18 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0090867 | |
License Date: 1981-06-23 | |
License Status: Abandoned | |
Spud Date: 1981-06-24 | |
Final Drill Date: 1981-06-29 | |
Well Total Depth: 1155.00 m | |
Surface Hole Latitude: 52.824992 | |
Surface Hole Longitude: -112.479031 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-06-23 | Obtained License |
1981-06-29 | Finished Drilling |
1981-06-30 | Drill Stem Test Performed |
1981-07-01 | Production Casing Operation Performed |
1981-08-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-08-08 | Perforation Treatment Performed - Cement Squeeze |
1981-08-08 | Perforation Treatment Performed - Jet Perforation |
1981-08-09 | Perforation Treatment Performed - Cement Squeeze |
1981-08-11 | Perforation Treatment Performed - Jet Perforation |
1981-08-18 | Perforation Treatment Performed - Jet Perforation |
1981-08-18 | Well Mode changed to Drilled and Cased |
1994-09-06 | Well Log Performed |
1994-09-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-09-07 | Perforation Treatment Performed - Jet Perforation |
1994-09-07 | Plug Back Performed |
1994-09-12 | Well Began Production |
1994-09-12 | Well Fluid changed to Gas |
1994-09-12 | Well Mode changed to Flowing |
2000-11-01 | Well Log Performed |
2000-11-30 | Perforation Treatment Performed - Cement Squeeze |
2000-11-30 | Plug Back Performed |
2000-11-30 | Well Fluid changed to Gas |
2000-11-30 | Well Mode changed to Abandoned Zone |
2000-12-01 | Well Log Performed |
2000-12-02 | Perforation Treatment Performed - Jet Perforation |
2000-12-02 | Perforation Treatment Performed - Remedial Casing |
2000-12-02 | Well Log Performed |
2000-12-03 | Perforation Treatment Performed - Jet Perforation |
2000-12-03 | Perforation Treatment Performed - Remedial Casing |
2000-12-03 | Well Log Performed |
2000-12-06 | Perforation Treatment Performed - Remedial Casing |
2000-12-10 | Well Log Performed |
2000-12-11 | Perforation Treatment Performed - Jet Perforation |
2000-12-11 | Well Log Performed |
2000-12-14 | Perforation Treatment Performed - Jet Perforation |
2000-12-14 | Well Log Performed |
2000-12-15 | Perforation Treatment Performed - Remedial Casing |
2007-07-02 | Well Log Performed |
2007-07-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-07-08 | Plug Back Performed |
2007-07-09 | Perforation Treatment Performed - Cement Plug |
2007-07-09 | Plug Back Performed |
2007-07-18 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-08-08 | Perforation | 1077.00 | 1078.00 | 7 |
1994-09-07 | Perforation | 1044.50 | 1047.00 | 13 |
1994-09-07 | Perforation | 1048.00 | 1049.00 | 13 |
1994-09-07 | Perforation | 1050.00 | 1052.00 | 13 |
2000-11-30 | Cement Squeeze | 1044.50 | 1052.00 | 0 |
2000-12-02 | Perforation | 904.00 | 905.00 | 13 |
2000-12-02 | Remedial Casing Cementing | 904.00 | 905.00 | 0 |
2000-12-03 | Perforation | 278.00 | 279.00 | 13 |
2000-12-03 | Remedial Casing Cementing | 278.00 | 279.00 | 0 |
2000-12-06 | Remedial Casing Cementing | 278.00 | 279.00 | 0 |
2000-12-11 | Perforation | 1065.50 | 1068.00 | 14 |
1981-08-08 | Acid Treatment | 1077.00 | 1078.00 | 0 |
2000-12-14 | Perforation | 241.00 | 242.00 | 14 |
2000-12-15 | Remedial Casing Cementing | 241.00 | 242.00 | 0 |
2007-07-08 | Packing Device Capped w/Cement | 1053.80 | 1061.80 | 0 |
2007-07-09 | Cement Plug | 212.50 | 295.00 | 0 |
1981-08-08 | Cement Squeeze | 1077.00 | 1078.00 | 0 |
1981-08-08 | Perforation | 1050.00 | 1051.00 | 7 |
1981-08-08 | Perforation | 1037.00 | 1038.00 | 7 |
1981-08-09 | Cement Squeeze | 1037.00 | 1051.00 | 0 |
1981-08-11 | Perforation | 1072.50 | 1075.00 | 7 |
1981-08-18 | Perforation | 1045.00 | 1046.00 | 13 |
1994-09-07 | Packing Device Capped w/Cement | 1062.00 | 1070.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 2607 | 0.0 | 0.0 | 0.0 |
1995 | 8675 | 0.0 | 0.0 | 0.0 |
1996 | 8753 | 0.0 | 0.0 | 0.0 |
1997 | 8692 | 0.0 | 0.0 | 0.0 |
1998 | 8581 | 0.0 | 0.0 | 0.0 |
1999 | 8718 | 0.0 | 0.0 | 0.0 |
2000 | 6036 | 0.0 | 0.0 | 0.0 |
2001 | 689 | 0.0 | 0.0 | 0.0 |
For data sources see[5]