X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444212812002

Well Details

Well ID: 0444212812002
Loading map...
Location: 00/12-28-044-21W4/2
Location Alias: 00/12-28-44-21 W4M
Location Alias 2: 00/12-28-044-21 W4/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 21
Section: 28
County/Municipality: Camrose County
Well Name: DEML MALMO 12-28-44-21
Operator Name: Direct Energy Marketing Limited
License Number: 0142163
License Date: 1989-12-14
License Status: RecCertified
Spud Date: 1989-12-15
Final Drill Date: 1989-12-21
Well Total Depth: 1423.00 m
Surface Hole Latitude: 52.821773
Surface Hole Longitude: -112.997642

For data sources see[1][2]

Well History

Date Event
1989-12-14 Obtained License
1989-12-16 Surface Casing Operation Performed
1989-12-21 Finished Drilling
1989-12-21 Well Log Performed
1989-12-23 Production Casing Operation Performed
1989-12-23 Rig Released
1990-02-03 Perforation Treatment Performed - Jet Perforation
1990-02-03 Well Log Performed
1990-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-29 Well Log Performed
1992-10-30 Well Log Performed
1992-10-31 Perforation Treatment Performed - Jet Perforation
1992-10-31 Well Log Performed
1992-10-31 Well Mode changed to Drilled and Cased
1992-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-12-10 Well Log Performed
1994-01-27 Well Began Production
1994-01-27 Well Fluid changed to Gas
1994-01-27 Well Mode changed to Flowing
1996-04-01 Well Fluid changed to Gas
1996-04-01 Well Mode changed to Suspended
2000-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-18 Plug Back Performed
2000-09-18 Well Fluid changed to Gas
2000-09-18 Well Mode changed to Abandoned Zone
2000-09-21 Perforation Treatment Performed - Jet Perforation
2000-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-28 Plug Back Performed
2000-10-29 Perforation Treatment Performed - Jet Perforation
2002-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-21 Plug Back Performed
2005-06-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-02-03 Perforation 1308.80 1310.30 14
2002-01-21 Packing Device Capped w/Cement 385.00 393.00 0
1990-02-04 Acid Treatment 1308.80 1310.30 0
1992-10-31 Perforation 1279.50 1281.00 14
1992-11-02 Acid Treatment 1279.50 1281.00 0
2000-09-18 Packing Device Capped w/Cement 1297.00 1305.00 0
2000-09-18 Packing Device Capped w/Cement 1262.00 1270.00 0
2000-09-21 Perforation 1118.50 1119.50 13
2000-10-28 Packing Device Capped w/Cement 1007.00 1115.00 0
2000-10-29 Perforation 397.00 400.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 3108 0.0 0.0 0.0

For data sources see[5]

References