X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444221015000

Well Details

Well ID: 0444221015000
Loading map...
Location: 00/15-10-044-22W4/0
Location Alias: 00/15-10-44-22 W4M
Location Alias 2: 00/15-10-044-22 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 22
Section: 10
County/Municipality: County of Wetaskiwin No. 10
Well Name: SCURRY ET AL MALMO 15-10-44-22
Operator Name: Devon Canada Corporation
License Number: 0004338
License Date: 1952-03-08
License Status: RecCertified
Spud Date: 1952-03-20
Final Drill Date: 1952-04-17
Well Total Depth: 1603.20 m
Surface Hole Latitude: 52.783005
Surface Hole Longitude: -113.109146

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-03-08 Obtained License
1952-04-06 Drill Stem Test Performed
1952-04-07 Drill Stem Test Performed
1952-04-09 Drill Stem Test Performed
1952-04-10 Drill Stem Test Performed
1952-04-14 Drill Stem Test Performed
1952-04-15 Drill Stem Test Performed
1952-04-16 Drill Stem Test Performed
1952-04-17 Finished Drilling
1952-04-17 Well Mode changed to Drilled and Cased
1952-04-19 Production Casing Operation Performed
1952-04-24 Perforation Treatment Performed - Bullet Perforation
1952-04-24 Well Began Production
1952-04-24 Well Fluid changed to Crude Oil
1952-04-24 Well Mode changed to Flowing
1952-05-05 Perforation Treatment Performed - Jet Perforation
1952-05-16 Well Fluid changed to Crude Oil
1952-05-16 Well Mode changed to Flowing
1957-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-03-03 Well Fluid changed to Crude Oil
1961-03-03 Well Mode changed to Pumping
1965-08-07 Perforation Treatment Performed - Cement Squeeze
1965-08-07 Well Fluid changed to Crude Oil
1965-08-07 Well Mode changed to Abandoned Zone
1988-10-27 Well Log Performed
1988-11-01 Perforation Treatment Performed - Cement Squeeze
1988-11-04 Well Log Performed
1988-11-05 Perforation Treatment Performed - Jet Perforation
1988-11-05 Well Log Performed
1988-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-09 Perforation Treatment Performed - Jet Perforation
1988-11-09 Well Log Performed
1988-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-15 Well Log Performed
1988-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-27 Plug Back Performed
1993-08-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-04-24 Bullet Perforation 1588.00 1590.10 13
1988-11-12 Acid Treatment 1548.00 1550.00 0
1988-11-16 Acid Treatment 1548.00 1550.00 0
1993-08-27 Packing Device Capped w/Cement 1514.00 1522.00 0
1952-05-05 Perforation 1527.70 1530.10 13
1952-05-05 Perforation 1531.60 1534.10 13
1957-09-13 Acid Treatment 1588.00 1590.10 0
1965-08-07 Cement Squeeze 1588.00 1590.10 0
1988-11-01 Cement Squeeze 1527.70 1534.10 0
1988-11-05 Perforation 1551.50 1553.50 13
1988-11-07 Acid Treatment 1551.50 1553.50 0
1988-11-09 Perforation 1548.00 1550.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[5]

References