If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0444240907000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.776082,"lon":-113.423486,"icon":""}]} |
Location: 00/07-09-044-24W4/0 | |
Location Alias: 00/07-09-44-24 W4M | |
Location Alias 2: 00/07-09-044-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 4 | |
Range: 24 | |
Section: 09 | |
County/Municipality: Samson 137 | |
Well Name: PENZL INQUA SAMSON 7-9-44-24 | |
Operator Name: Mont Resources Limited | |
License Number: 0006460 | |
License Date: 1953-05-19 | |
License Status: RecCertified | |
Spud Date: 1953-05-28 | |
Final Drill Date: 1953-06-22 | |
Well Total Depth: 1535.00 m | |
Surface Hole Latitude: 52.776082 | |
Surface Hole Longitude: -113.423486 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-05-19 | Obtained License |
1953-06-14 | Drill Stem Test Performed |
1953-06-18 | Drill Stem Test Performed |
1953-06-20 | Drill Stem Test Performed |
1953-06-22 | Finished Drilling |
1953-06-22 | Well Mode changed to Drilled and Cased |
1953-06-23 | Production Casing Operation Performed |
1953-06-27 | Drill Stem Test Performed |
1953-06-27 | Perforation Treatment Performed - Bullet Perforation |
1953-06-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1953-06-29 | Perforation Treatment Performed - Cement Squeeze |
1953-07-02 | Perforation Treatment Performed - Jet Perforation |
1953-09-07 | Well Began Production |
1953-09-07 | Well Fluid changed to Crude Oil |
1953-09-07 | Well Mode changed to Pumping |
1955-06-20 | Well Fluid changed to Crude Oil |
1955-06-20 | Well Mode changed to Suspended |
1956-06-28 | Perforation Treatment Performed - Bullet Perforation |
1956-06-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1956-06-30 | Perforation Treatment Performed - Jet Perforation |
1956-07-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1956-07-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1956-07-02 | Perforation Treatment Performed - Bullet Perforation |
1956-11-22 | Well Fluid changed to Crude Oil |
1956-11-22 | Well Mode changed to Flowing |
1967-11-23 | Perforation Treatment Performed - Jet Perforation |
1968-01-09 | Perforation Treatment Performed - Jet Perforation |
1968-12-16 | Well Fluid changed to Crude Oil |
1968-12-16 | Well Mode changed to Pumping |
1969-06-05 | Perforation Treatment Performed - Condensate Squeeze |
1970-04-15 | Well Fluid changed to Crude Oil |
1970-04-15 | Well Mode changed to Suspended |
1971-07-21 | Well Fluid changed to Crude Oil |
1971-07-21 | Well Mode changed to Flowing |
1972-07-01 | Well Fluid changed to Crude Oil |
1972-07-01 | Well Mode changed to Suspended |
1976-08-01 | Well Fluid changed to Crude Oil |
1976-08-01 | Well Mode changed to Pumping |
1980-03-04 | Well Fluid changed to Crude Oil |
1980-03-04 | Well Mode changed to Suspended |
1980-08-28 | Perforation Treatment Performed - Cement Plug |
1980-08-28 | Well Abandoned |
1980-08-28 | Well Fluid changed to Crude Oil |
1980-08-28 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-06-27 | Bullet Perforation | 1444.80 | 1445.10 | 13 |
1956-07-02 | Bullet Perforation | 1455.70 | 1459.70 | 20 |
1956-07-02 | Packing Device Capped w/Cement | 1463.00 | 1463.00 | 0 |
1967-11-23 | Perforation | 1452.40 | 1452.70 | 10 |
1967-11-23 | Perforation | 1446.30 | 1446.60 | 10 |
1968-01-09 | Perforation | 1452.10 | 1453.30 | 13 |
1969-06-05 | Condensate Squeeze | 1452.10 | 1453.30 | 0 |
1980-08-28 | Cement Plug | 1421.00 | 1463.00 | 0 |
1953-06-29 | Acid Treatment | 1444.80 | 1445.10 | 0 |
1953-06-29 | Cement Squeeze | 1444.80 | 1445.10 | 0 |
1953-07-02 | Perforation | 1456.90 | 1457.60 | 13 |
1956-06-28 | Bullet Perforation | 1477.70 | 1481.30 | 20 |
1956-06-29 | Acid Treatment | 1478.90 | 1481.30 | 0 |
1956-06-30 | Perforation | 1479.20 | 1482.20 | 7 |
1956-06-30 | Perforation | 1466.70 | 1469.70 | 13 |
1956-07-01 | Acid Treatment | 1466.70 | 1482.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 5740 | 0.0 | 0.0 | 0.0 |
1969 | 5392 | 0.0 | 0.0 | 0.0 |
1971 | 2879 | 0.0 | 0.0 | 0.0 |
1972 | 3100 | 0.0 | 0.0 | 0.0 |
1976 | 1047 | 0.0 | 0.0 | 0.0 |
1977 | 1810 | 0.0 | 0.0 | 0.0 |
1978 | 327 | 0.0 | 0.0 | 0.0 |
For data sources see[5]