X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444240909000

Well Details

Well ID: 0444240909000
Loading map...
Location: 00/09-09-044-24W4/0
Location Alias: 00/09-09-44-24 W4M
Location Alias 2: 00/09-09-044-24 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 24
Section: 09
County/Municipality: Samson 137
Well Name: PENZL INQUA SAMSON 9-9-44-24
Operator Name: Mont Resources Limited
License Number: 0039756
License Date: 1971-02-15
License Status: RecExempt
Spud Date: 1971-02-18
Final Drill Date: 1971-02-26
Well Total Depth: 1445.40 m
Surface Hole Latitude: 52.779411
Surface Hole Longitude: -113.417496

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-02-15 Obtained License
1971-02-21 Drill Stem Test Performed
1971-02-26 Drill Stem Test Performed
1971-02-26 Finished Drilling
1971-02-26 Well Mode changed to Drilled and Cased
1971-02-27 Drill Stem Test Performed
1971-02-28 Production Casing Operation Performed
1971-03-09 Perforation Treatment Performed - Open-Hole Completion
1971-06-01 Well Began Production
1971-06-01 Well Fluid changed to Crude Oil
1971-06-01 Well Mode changed to Flowing
1972-10-12 Perforation Treatment Performed - Acid Wash - No Pressure
1972-10-12 Perforation Treatment Performed - Jet Perforation
1972-10-31 Well Fluid changed to Crude Oil
1972-10-31 Well Mode changed to Flowing
1974-02-04 Perforation Treatment Performed - Cement Squeeze
1978-01-27 Well Fluid changed to Crude Oil
1978-01-27 Well Mode changed to Pumping
1980-08-21 Perforation Treatment Performed - Cement Squeeze
1980-08-25 Perforation Treatment Performed - Jet Perforation
1980-08-25 Well Fluid changed to Crude Oil
1980-08-25 Well Mode changed to Abandoned Zone
1985-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-11-24 Plug Back Performed
1985-11-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-03-09 Open Hole/Barefoot Completion 1441.70 1445.40 0
1972-10-12 Perforation 705.30 710.20 0
1972-10-12 Acid Wash 705.30 710.20 0
1974-02-04 Cement Squeeze 705.30 707.10 0
1980-08-21 Cement Squeeze 1441.70 1445.40 0
1980-08-25 Perforation 1411.00 1413.60 2
1985-11-24 Packing Device Capped w/Cement 1397.10 1405.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 3608 0.0 0.0 0.0
1972 5833 0.0 0.0 0.0
1973 3273 0.0 0.0 0.0
1974 4576 0.0 0.0 0.0
1976 2252 0.0 0.0 0.0
1977 5986 0.0 0.0 0.0
1978 5636 0.0 0.0 0.0
1979 5572 0.0 0.0 0.0
1980 2541 0.0 0.0 0.0

For data sources see[5]

References