X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444241601002

Well Details

Well ID: 0444241601002
Loading map...
Location: 00/01-16-044-24W4/2
Location Alias: 00/01-16-44-24 W4M
Location Alias 2: 00/01-16-044-24 W4/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 24
Section: 16
County/Municipality: Samson 137
Well Name: PENZL INQUA SAMSON 1-16-44-24
Operator Name: Mont Resources Limited
License Number: 0006490
License Date: 1953-05-23
License Status: RecCertified
Spud Date: 1953-05-24
Final Drill Date: 1953-06-06
Well Total Depth: 1496.90 m
Surface Hole Latitude: 52.787102
Surface Hole Longitude: -113.417532

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-05-23 Obtained License
1953-06-06 Drill Stem Test Performed
1953-06-06 Finished Drilling
1953-06-06 Well Mode changed to Drilled and Cased
1953-06-08 Production Casing Operation Performed
1953-06-11 Drill Stem Test Performed
1953-06-11 Perforation Treatment Performed - Bullet Perforation
1953-06-12 Perforation Treatment Performed - Cement Squeeze
1953-06-13 Perforation Treatment Performed - Bullet Perforation
1956-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-08-11 Perforation Treatment Performed - Cement Squeeze
1956-08-16 Drill Stem Test Performed
1956-08-16 Perforation Treatment Performed - Bullet Perforation
1958-06-26 Perforation Treatment Performed - Jet Perforation
1959-09-24 Perforation Treatment Performed - Cement Squeeze
1959-09-27 Perforation Treatment Performed - Bullet Perforation
1962-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-07-17 Perforation Treatment Performed - Cement Squeeze
1962-07-21 Perforation Treatment Performed - Jet Perforation
1962-11-09 Perforation Treatment Performed - Jet Perforation
1962-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-09-11 Perforation Treatment Performed - Cement Squeeze
1968-09-12 Perforation Treatment Performed - Jet Perforation
1968-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-09-16 Perforation Treatment Performed - Jet Perforation
1968-09-17 Perforation Treatment Performed - Cement Plug
1968-09-17 Perforation Treatment Performed - Cement Squeeze
1968-09-19 Perforation Treatment Performed - Jet Perforation
1968-09-19 Well Began Production
1968-09-19 Well Fluid changed to Gas
1968-09-19 Well Mode changed to Flowing
1970-09-10 Well Fluid changed to Gas
1970-09-10 Well Mode changed to Suspended
1971-07-26 Well Fluid changed to Gas
1971-07-26 Well Mode changed to Flowing
1972-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-02-04 Perforation Treatment Performed - Jet Perforation
1972-06-07 Well Fluid changed to Gas
1972-06-07 Well Mode changed to Flowing
1972-10-15 Perforation Treatment Performed - Cement Squeeze
1972-10-15 Well Fluid changed to Gas
1972-10-15 Well Mode changed to Abandoned Zone
1980-09-05 Perforation Treatment Performed - Cement Plug
1980-09-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-06-11 Bullet Perforation 1446.30 1446.60 13
1959-09-27 Bullet Perforation 1458.20 1459.40 3
1962-07-17 Acid Treatment 1458.20 1459.40 0
1962-07-17 Cement Squeeze 1458.20 1459.40 0
1962-07-21 Perforation 1455.70 1456.90 13
1962-11-09 Perforation 1453.30 1455.70 13
1962-11-19 Acid Treatment 1453.30 1456.90 0
1968-09-11 Cement Squeeze 1453.30 1456.90 0
1968-09-12 Perforation 1448.40 1450.80 7
1968-09-14 Acid Treatment 1448.40 1450.80 0
1968-09-16 Perforation 1442.90 1444.40 7
1953-06-11 Bullet Perforation 1446.60 1446.90 13
1968-09-17 Cement Squeeze 1442.90 1444.40 0
1968-09-17 Cement Squeeze 1448.40 1450.80 0
1968-09-17 Cement Plug 1432.60 1452.40 0
1968-09-19 Perforation 1415.80 1418.80 7
1972-02-04 Perforation 1450.80 1456.90 7
1972-02-04 Acid Treatment 1450.80 1456.90 0
1972-10-15 Cement Squeeze 1450.80 1456.90 0
1972-10-15 Cement Squeeze 1415.80 1418.80 0
1980-09-05 Cement Plug 1290.00 1415.80 0
1953-06-12 Cement Squeeze 1446.30 1446.90 0
1953-06-13 Bullet Perforation 1461.80 1462.10 26
1956-08-11 Acid Treatment 1461.80 1462.10 0
1956-08-11 Cement Squeeze 1461.80 1462.10 0
1956-08-16 Bullet Perforation 1462.70 1463.30 20
1958-06-26 Perforation 1460.90 1461.80 13
1959-09-24 Cement Squeeze 1460.90 1463.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 680 0.0 0.0 0.0
1969 7279 0.0 0.0 0.0
1970 5885 0.0 0.0 0.0
1971 2897 0.0 0.0 0.0
1972 436 0.0 0.0 0.0

For data sources see[5]

References