If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0444251708002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.791991,"lon":-113.584402,"icon":""}]} |
| Location: 00/08-17-044-25W4/2 | |
| Location Alias: 00/08-17-44-25 W4M | |
| Location Alias 2: 00/08-17-044-25 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 044 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 17 | |
| County/Municipality: Ponoka County | |
| Well Name: CEIBA NELSON 8-17-44-25 | |
| Operator Name: Secure Energy Services Inc. | |
| License Number: 0187468 | |
| License Date: 1996-04-29 | |
| License Status: Suspension | |
| Spud Date: 1996-05-14 | |
| Final Drill Date: 1996-05-18 | |
| Well Total Depth: 1545.00 m | |
| Surface Hole Latitude: 52.791991 | |
| Surface Hole Longitude: -113.584402 |
| Date | Event |
|---|---|
| 1996-04-29 | Obtained License |
| 1996-05-14 | Well Log Performed |
| 1996-05-15 | Surface Casing Operation Performed |
| 1996-05-18 | Finished Drilling |
| 1996-05-18 | Well Mode changed to Drilled and Cased |
| 1996-05-19 | Drill Stem Test Performed |
| 1996-05-19 | Well Log Performed |
| 1996-05-20 | Drill Stem Test Performed |
| 1996-05-21 | Production Casing Operation Performed |
| 1996-05-21 | Well Log Performed |
| 1996-05-22 | Rig Released |
| 1996-06-04 | Perforation Treatment Performed - Jet Perforation |
| 1996-06-04 | Well Log Performed |
| 1998-03-31 | Well Log Performed |
| 1998-04-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-04-13 | Well Log Performed |
| 1998-04-14 | Well Log Performed |
| 1998-04-15 | Perforation Treatment Performed - Jet Perforation |
| 2000-03-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2000-03-16 | Perforation Treatment Performed - Jet Perforation |
| 2000-03-16 | Plug Back Performed |
| 2000-03-16 | Well Log Performed |
| 2000-03-16 | Well Mode changed to Drilled and Cased |
| 2009-05-25 | Well Mode changed to Closed |
| 2010-03-11 | Perforation Treatment Performed - Cement Squeeze |
| 2010-03-11 | Plug Back Performed |
| 2010-03-14 | Perforation Treatment Performed - Jet Perforation |
| 2010-04-08 | Well Mode changed to Drilled and Cased |
| 2012-11-09 | Perforation Treatment Performed - Cement Squeeze |
| 2012-11-09 | Plug Back Performed |
| 2012-11-14 | Perforation Treatment Performed - Jet Perforation |
| 2012-11-19 | Perforation Treatment Performed - Chemical Squeeze |
| 2012-11-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2019-10-11 | Perforation Treatment Performed - Jet Perforation |
| 2019-10-11 | Well Log Performed |
| 2019-10-12 | Perforation Treatment Performed - Cement Squeeze |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1996-06-04 | Perforation | 1480.00 | 1481.50 | 14 |
| 2012-11-14 | Perforation | 1519.00 | 1521.00 | 17 |
| 2012-11-14 | Perforation | 1512.00 | 1514.00 | 17 |
| 2012-11-14 | Perforation | 1505.00 | 1507.00 | 17 |
| 2012-11-19 | Chemical Squeeze | 1505.00 | 1521.00 | 0 |
| 2012-11-20 | Acid Treatment | 1505.00 | 1521.00 | 0 |
| 2019-10-11 | Perforation | 1474.40 | 1477.50 | 10 |
| 2019-10-12 | Cement Squeeze | 1474.50 | 1477.50 | 0 |
| 1998-04-13 | Packing Device Capped w/Cement | 1470.50 | 1478.50 | 0 |
| 1998-04-15 | Perforation | 1474.50 | 1476.00 | 13 |
| 2000-03-16 | Packing Device Capped w/Cement | 1467.00 | 1475.00 | 0 |
| 2000-03-16 | Perforation | 674.00 | 680.00 | 17 |
| 2010-03-11 | Cement Squeeze | 674.00 | 680.00 | 0 |
| 2010-03-14 | Perforation | 1480.00 | 1481.50 | 14 |
| 2012-11-09 | Cement Squeeze | 1474.50 | 1476.00 | 0 |
| 2012-11-09 | Cement Squeeze | 1480.00 | 1481.50 | 0 |
For data sources see[4]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-11-09 | No Incident Encountered | 0.00 | 0.00 |
| 2012-11-30 | No Incident Encountered | 0.00 | 0.00 |
| 2019-10-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]